Welcome Back Home Care, Inc.
A home health agency in Pocola, Oklahoma 74902
302 North Pocola Blvd, Pocola, Oklahoma 74902. (918) 436-6179.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 21, 2026.
- 4of 5 quality of patient care rating
- 5of 5 patient survey rating
- 9 deficiencies cited in the last three years
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Sep 30, 2025: a recertification inspection.
9 deficiencies cited in the last three years.
CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.
When those deficiencies happened
9 deficiencies in 1 month of the last 36. Last cited Sep 2025. Most serious: Standard-level. The last 3 years, to Oct 24, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.
Sep 30, 2025: recertification inspection9 deficiencies
-
Local, State, Tribal Collaboration Process
The inspectors’ words, 270 words
“Local, State, Tribal Collaboration Process CFR(s): 484.102(a)(4) §403.748(a)(4), §416.54(a)(4), §418.113(a)(4), §441.184(a)(4), §460.84(a)(4), §482.15(a)(4), §483.73(a)(4), §483.475(a)(4), §484.102(a)(4), §485.68(a)(4), §485.542(a)(4), §485.625(a)(4), §485.727(a)(5), §485.920(a)(4), §486.360(a)(4), §491.12(a)(4), §494.62(a)(4) [(a) Emergency Plan. The [facility] must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least every 2 years [annually for LTC facilities]. The plan must do the following:] (4) Include a process for cooperation and collaboration with local, tribal, regional, State, and Federal emergency preparedness officials’ efforts to maintain an integrated response during a disaster or emergency situation. * * [For ESRD facilities only at §494.62(a)(4)]: (4) Include a process for cooperation and collaboration with local, tribal, regional, State, and Federal emergency preparedness officials’ efforts to maintain an integrated response during a disaster or emergency situation. The dialysis facility must contact the local emergency preparedness agency at least annually to confirm that the agency is aware of the dialysis facility’s needs in the event of an emergency. This Standard is not met as evidenced by: Based on record review and interview, the agency failed to ensure development, implementation and contact information for an integrated emergency preparedness response with Federal, State, Tribal and Regional emergency management officials for all patients and employees. Findings: A review of emergency preparedness records showed no administrative processes and resource contact information for an integrated emergency preparedness response with Federal, State, Tribal and Regional emergency management officials for the agency. On 09/30/25 at 10:30 a.m., Staff A stated the agency did not have processes and resource contact information for an integrated emergency preparedness response with Federal, State, Tribal and Regional emergency management officials for the agency.”
-
Names And Contact Information
The inspectors’ words, 405 words
“Names and Contact Information CFR(s): 484.102(c)(1) §403.748(c)(1), §416.54(c)(1), §418.113(c)(1), §441.184(c)(1), §460.84(c)(1), §482.15(c)(1), §483.73(c)(1), §483.475(c)(1), §484.102(c)(1), §485.68(c)(1), §485.542(c)(1), §485.625(c)(1), §485.727(c)(1), §485.920(c)(1), §486.360(c)(1), §491.12(c)(1), §494.62(c)(1). [(c) The [facility must develop and maintain an emergency preparedness communication plan that complies with Federal, State and local laws and must be reviewed and updated at least every 2 years [annually for LTC facilities]. The communication plan must include all of the following:] (1) Names and contact information for the following: (i) Staff. (ii) Entities providing services under arrangement. (iii) Patients’ physicians (iv) Other [facilities]. (v) Volunteers. *[For Hospitals at §482.15(c) and CAHs at §485.625(c)] The communication plan must include all of the following: (1) Names and contact information for the following: (i) Staff. (ii) Entities providing services under arrangement. (iii) Patients’ physicians (iv) Other [hospitals and CAHs]. (v) Volunteers. *[For RNHCIs at §403.748(c):] The communication plan must include all of the following: (1) Names and contact information for the following: (i) Staff. (ii) Entities providing services under arrangement. (iii) Next of kin, guardian, or custodian. (iv) Other RNHCIs. (v) Volunteers. *[For ASCs at §416.45(c):] The communication plan must include all of the following: (1) Names and contact information for the following: (i) Staff. (ii) Entities providing services under arrangement. (iii) Patients’ physicians. (iv) Volunteers. *[For Hospices at §418.113(c):] The communication plan must include all of the following: (1) Names and contact information for the following: (i) Hospice employees. (ii) Entities providing services under arrangement. (iii) Patients’ physicians. (iv) Other hospices. *[For HHAs at §484.102(c):] The communication plan must include all of the following: (1) Names and contact information for the following: (i) Staff. (ii) Entities providing services under arrangement. (iii) Patients’ physicians. (iv) Volunteers. *[For OPOs at §486.360(c):] The communication plan must include all of the following: (2) Names and contact information for the following: (i) Staff. (ii) Entities providing services under arrangement. (iii) Volunteers. (iv) Other OPOs. (v) Transplant and donor hospitals in the OPO’s Donation Service Area (DSA). This Standard is not met as evidenced by: Based on record review and interview, the agency failed to ensure an Emergency Preparedness Communication Plan included current employee contact information for the agency for all patients and employees. Findings: A review of emergency preparedness records showed no communication plan with current employee contact information for the agency. On 09/30/25 at 10:30 a.m., Staff A stated the emergency preparedness communication plan did not include contact information for current employees of the agency.”
-
Performance Improvement Projects
The inspectors’ words, 177 words
“Performance improvement projects CFR(s): 484.65(d)(1)(2) Standard: Performance improvement projects. Beginning July 13, 2018 HHAs must conduct performance improvement projects. (1) The number and scope of distinct improvement projects conducted annually must reflect the scope, complexity, and past performance of the HHA’s services and operations. (2) The HHA must document the quality improvement projects undertaken, the reasons for conducting these projects, and the measurable progress achieved on these projects. This Standard is not met as evidenced by: Based on record review and interviews, the agency failed to ensure a performance improvement project for the agency in calendar years 2024 and 01/01/25 to 08/31/25 for all patients and employees. Findings: A review of QAPI Program records showed no performance improvement project for the agency in calendar years 2024 and 01/01/25 to 08/31/25. On 09/30/25 at 10:45 a.m., Staff A stated: 1. The agency did not have a QAPI performance improvement project in calendar year 2024 and from 01/01/25 to 08/31/25. 2. A performance improvement project was put into place on 09/02/25 when the current administration took over the agency.”
-
Governing Body
The inspectors’ words, 194 words
“Governing body CFR(s): 484.105(a) Standard: Governing body. A governing body (or designated persons so functioning) must assume full legal authority and responsibility for the agency’s overall management and operation, the provision of all home health services, fiscal operations, review of the agency’s budget and its operational plans, and its quality assessment and performance improvement program. This Standard is not met as evidenced by: Based on record review and interview, the agency failed to ensure governing body oversite of the agency’s program evaluation, budget and capital expenditure authorization, and QAPI plan approval from the agency’s acquisition date of 09/01/25 for all patients and employees. Findings: A review of governing body meeting records showed no governing body oversite of the sale of the agency effective 09/01/25 and showed no program evaluation, budget and capital expenditure authorization or QAPI plan approval from the agency’s acquisition date of 09/01/25. On 09/30/25 at 10:25 a.m., Staff A stated: 1. The governing body meeting minutes showed no governing body oversite of the agency’s sale prior to 09/01/25. 2. The agency had no governing body meeting minutes that showed governing body oversite for the agency from the acquisition date of 09/01/25.”
-
Plan Of Care Must Include The Following
The inspectors’ words, 356 words
“Plan of care must include the following CFR(s): 484.60(a)(2)(i-xvi) The individualized plan of care must include the following: (i) All pertinent diagnoses; (ii) The patient’s mental, psychosocial, and cognitive status; (iii) The types of services, supplies, and equipment required; (iv) The frequency and duration of visits to be made; (v) Prognosis; (vi) Rehabilitation potential; (vii) Functional limitations; (viii) Activities permitted; (ix) Nutritional requirements; (x) All medications and treatments; (xi) Safety measures to protect against injury; (xii) A description of the patient’s risk for emergency department visits and hospital re-admission, and all necessary interventions to address the underlying risk factors. (xiii) Patient and caregiver education and training to facilitate timely discharge; (xiv) Patient-specific interventions and education; measurable outcomes and goals identified by the HHA and the patient; (xv) Information related to any advanced directives; and (xvi) Any additional items the HHA or physician or allowed practitioner may choose to include. This Element is not met as evidenced by: Based on record review and interview, the agency failed to ensure individualized patient POCs for SN treatment interventions for urinary catheter management included last changed or due date of treatment interventions for two (Patients #2 and #3) of eight patients. Findings: Patient #2 A review of the POC dated 08/13/25 to 10/11/25 showed orders for SN to perform urinary management intervention of 18 French /10 cubic centimeter catheter change every two weeks. The POC did not identify a last changed or due date of the intervention and showed no physician notifications and no change in orders. On 09/30/25 at 11:17 a.m., Staff H stated the POC did not identify a last changed date or due date for the catheter change. Patient #3 A review of the POC dated 08/09/25 to 10/07/25 showed orders for SN to perform urinary management intervention of 16 French /10 cubic centimeter catheter change every four weeks. The POC did not identify a last changed or due date of the intervention and showed no physician notifications and no change in orders. On 09/30/25 at 11:32 a.m., Staff H stated the POC did not identify a last changed date or due date for the catheter change.”
-
All Orders Recorded In Plan Of Care
The inspectors’ words, 312 words
“All orders recorded in plan of care CFR(s): 484.60(a)(3) All patient care orders, including verbal orders, must be recorded in the plan of care. This Element is not met as evidenced by: Based on record review and interview, the agency failed to ensure physician orders were a part of the patient POC for one (Patient #4) of eight patients. Findings: Patient #4 A review of the POC dated 07/25/25 to 09/22/25 showed orders for SN to conduct wound site care interventions to: 1. Right and left great toes, and left heel: cleanse with normal saline and VASHE cleanser, apply Santyl and hydrofera blue, and cover with an ABD pad and Kerlex dressing material. 2. Right heel: cleanse with normal saline and VASHE cleanser, apply betadine solution and cover with an ABD pad and Kerlex dressing material. · SN visit notes dated 07/25/25, 08/01/25, 08/04/25, 08/08/25, 08/15/25, 08/22/25, 08/26/25, 08/29/25, 09/05/25, 09/08/25, 09/12/25 and 09/19/25 showed no wound site care interventions to the right and left great toes. · SN visit notes dated 07/28/25, 08/04/25, 08/08/25, 08/15/25, 08/22/25, 08/26/25 and 08/29/25 showed no documentation that Santyl was applied to the wound site to the left heel. · A SN visit note dated 08/01/25 documented Medi-honey and alginate were applied to the wound site to the right heel. The POC showed no physician notifications and no changes in orders. On 09/30/25 at 11:36 a.m., Staff H stated: 1. The agency received orders from the Wound Clinic on 07/23/25 to discontinue the Santyl and to the left and right heel, discontinue the hydrofera blue to the left heel and apply Medi-honey and alginate to the right heel. 2. The agency did not receive orders to discontinue the wound site intervention to the right and left great toes. 3. The wound clinic orders were attached to the EMR but were not entered into the patient’s POC.”
-
Communication With All Physicians
The inspectors’ words, 363 words
“Communication with all physicians CFR(s): 484.60(d)(1) Standard: Coordination of Care. The HHA must: (1) Assure communication with all physicians or allowed practitioners involved in the plan of care. This Element is not met as evidenced by: Based on record review and interview, the agency failed to ensure care was coordinated between the agency and physician for two (Patients #2 and #4) of eight patients. Findings: Patient #2 A review of a plan of care dated 08/13/25 to 10/11/25 showed a primary diagnosis of neuromuscular dysfunction of the bladder and showed a SN visit frequency of once every other week for eight weeks to manage and change the urinary catheter. SN visit notes dated 08/21/25, 09/04/25 and 09/16/25 showed no urinary catheter change was conducted during the SN visits. The clinical record showed no physician notifications and no changes in the orders. On 09/30/25 at 11:17 a.m., Staff H stated: 1. The patient had a suprapubic catheter placed on 08/20/25 and the urologist was changing out the catheter. 2. The agency did not receive orders to discontinue the catheter changes, and the physician was notified to discontinue the orders on the POC. Patient #4 A review of the POC dated 07/25/25 to 09/22/25 showed a primary diagnosis of Diabetes Mellitus Type II with a foot ulcer and showed a SN visit frequency of two times a week for nine weeks for SN to conduct wound site care interventions to the right and left great toes, left heel and right heel. SN visit notes dated 07/25/25, 08/01/25, 08/04/25, 08/08/25, 08/15/25, 08/22/25, 08/26/25, 08/29/25, 09/05/25, 09/08/25, 09/12/25 and 09/19/25 showed no wound site care interventions to the right and left great toes and showed no physician notifications and no changes in orders. On 09/30/25 at 11:36 a.m., Staff H stated: 1. The agency received orders from the Wound Clinic on 07/23/25 to change the wound care interventions to the left and right heel. 2. The agency did not receive orders to discontinue the wound site interventions to the right and left great toes. 3. The Wound Clinic was not contacted to verify orders to discontinue the wound site interventions to the right and left great toes.”
-
Provide Services In The Plan Of Care
The inspectors’ words, 187 words
“Provide services in the plan of care CFR(s): 484.75(b)(3) Providing services that are ordered by the physician or allowed practitioner as indicated in the plan of care; This Element is not met as evidenced by: Based on record review and interview, the agency failed to ensure the SN reported to the physician blood sugar readings outside of reporting parameters for one (Patient #1) of eight patients. Findings: Patient #1 A review of the POC dated 08/11/25 to 10/09/25 showed orders for SN to assess and report the patient’s blood sugar levels less than 60 every visit. A SN visit note dated 09/09/25 showed that the patient reported blood sugar levels from 52 to 300 over a week’s period with symptoms of lightheadedness. A communication note to the physician dated 09/09/25 showed the patient was experiencing audible respiratory wheezing but did not report the blood sugar levels of 52 to 300 with symptoms of lightheadedness. The clinical record showed no follow-up physician notification and no change in orders. On 09/30/25 at 11:04 a.m., Staff H stated the patient’s reported blood sugar levels were not reported to the physician.”
-
Interventions And Patient Response
The inspectors’ words, 173 words
“Interventions and patient response CFR(s): 484.110(a)(2) All interventions, including medication administration, treatments, and services, and responses to those interventions; This Element is not met as evidenced by: Based on record review and interview, the agency failed to ensure clinical visit note documentation was completed for one (Patient #3) of eight patients. Findings: Patient #3 A review of the POC dated 08/09/25 to 10/07/25 showed orders for SN to perform a venipuncture lab draw and collect a urine specimen for urinalysis. The clinical record showed no SN visit note for the 08/28/25 visit date. A communication note dated 08/28/25 stated the nurse performed a venipuncture for the lab draw, collected the urine specimen and delivered the specimens to a laboratory. The communication note did not document the SN patient assessment, venipuncture procedure or patient response of the intervention. On 09/30/25 at 11:32 a.m., Staff H stated: 1. There was not a SN visit note for 08/28/25. 2. Visits for lab draws are not billable. 3. We do not document non-billable visits as SN visits.”
The one inspection in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Sep 30, 2025 | Recertification inspection | 9 deficiencies cited |
Is it certified?
- Medicare-certified home health agency since Sep 16, 2013.
- Ownership: proprietary (for profit).
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
CMS, Home Health Care Agencies. Released Oct 21, 2026. Updated quarterly.
CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.
Has anything been proven against it?
- CMS doesn’t publish fines or other penalties for home health agencies, so none are shown.
- 0 deficiencies cited in the last three years came from inspections that included a complaint investigation.
CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.
Who does the caring?
- Offers nursing care, physical therapy, occupational therapy, speech pathology and home health aide services.
- Doesn’t offer medical social services.
- CMS doesn’t publish staffing levels for home health agencies.
CMS, Home Health Care Agencies. Released Oct 21, 2026. Updated quarterly.
Who owns it?
- 15 owners or officers are people: Terry Nix (owns 5% or more directly, 60%); Terry Nix (corporate officer, 60%); Terry Nix (corporate director, 60%); Terry Nix (managing employee (on the payroll), 60%); Terry Nix (runs it (operational or managerial control), 60%); William Barnhart (owns 5% or more directly, 30%); William Barnhart (corporate officer, 30%); William Barnhart (corporate director, 30%); William Barnhart (managing employee (on the payroll), 30%); William Barnhart (runs it (operational or managerial control), 30%); David A Pratt (owns 5% or more directly, 10%); David A Pratt (corporate officer, 10%); David A Pratt (corporate director, 10%); David A Pratt (managing employee (on the payroll), 10%); David A Pratt (runs it (operational or managerial control), 10%).
- No private-equity firm among the owners CMS lists.
- No real-estate investment trust among the owners CMS lists.
CMS, Home Health Agency All Owners and Home Health Agency Enrollments. Released Sep 29, 2026. Updated quarterly.
How do patients fare?
- CMS rates its quality of patient care 4 of 5.
- Patients rate it 5 of 5 in CMS’s patient survey (46 surveys completed): 94% rated it 9 or 10 out of 10, and 91% would definitely recommend it.
- CMS compares it with the national rate: discharged to the community, the same; potentially preventable hospital stays, worse; potentially preventable readmissions after discharge, the same.
CMS, Home Health Care Agencies and Home Health Patient Survey. Released Oct 21, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Quality of patient care ratingCMS star rating, 1 to 5 in half stars | 4 of 5 |
| Patient survey ratingCMS star rating from its survey of the agency’s patients, 1 to 5 | 5 of 5 |
| Discharged to the communityCMS’s risk-adjusted rate, compared with the national rate | 81.00% (same as the national rate) |
| Potentially preventable hospital staysCMS’s risk-adjusted rate, compared with the national rate | 18.99% (worse than the national rate) |
| Potentially preventable readmissions after dischargeCMS’s risk-adjusted rate, compared with the national rate | 3.82% (same as the national rate) |
How does it compare nearby?
- Of the 15 agencies CMS’s data show serving patients in ZIP code 74902, where this agency’s office is, 15 have a quality of patient care rating; the middle one is 2.5 of 5, and this one is rated 4 of 5.
CMS, Home Health ZIP Codes and Home Health Care Agencies. Released Oct 21, 2026. Updated quarterly.
| Place | Quality rating |
|---|---|
| Welcome Back Home Care, Inc. This home health agency | 4 |
| Traditions Health of Stigler | 3 |
| Complete Home Health of Stigler | 2.5 |
| Green Country Home Care, Inc. | 1.5 |
| Allied Home Health Services, Inc. | 2.5 |
| Angels Care Home Health VII | 4.5 |
| Enhabit Home Health of Eastern Oklahoma | 2.5 |
| Traditions Health of Idabel | 4.5 |
| Mays Housecall Home Health of Tulsa, LLC | 4.5 |
| Elara Caring Xviii | 5 |
| Compassion Home Care, Inc. | 1.5 |
| Horizon Homecare | 1.5 |
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for home health agencies, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says some of its home health reports are accurate or available only through May 19, 2021, because of a systems migration.
- Many home health agencies are inspected by a private accrediting organisation instead of the state, and QCOR’s home health file doesn’t appear to include those inspections: no inspection on record here doesn’t mean none took place.
Sources
-
Centers for Medicare & Medicaid Services, Home Health Care Agencies (6jpm-sxkc).
Released Oct 21, 2026 and checked Oct 24, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Home Health Patient Survey (ccn4-8vby).
Released Oct 21, 2026 and checked Oct 24, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR home health inspection reports (HHA_2567s_2018_to_2026YTD.xlsx).
Released Oct 20, 2026 and checked Oct 24, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Home Health Agency All Owners (fc009b2d-7846-44b1-b4a1-692f0c143879).
Released Sep 29, 2026 and checked Oct 24, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Home Health Agency Enrollments (15f64ab4-3172-4a27-b589-ebd67a6d28aa).
Released Sep 29, 2026 and checked Oct 24, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Home Health ZIP Codes (m5eg-upu5).
Released Oct 21, 2026 and checked Oct 24, 2026. Updated quarterly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 24, 2026.
From the agency
The public record above comes first. Anything the agency adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the agency will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the agency”, and paying will never change a finding, a rating or the order of results.