Fmc Cary Kidney Center
A dialysis facility in Cary, North Carolina 27518
400 Keisler Dr, Cary, North Carolina 27518. (919) 462-0976.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 28, 2026.
- 5of 5 CMS’s star rating
- 3of 5 patient survey rating
- 1 deficiency cited in the last three years
- 28 dialysis stations
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on May 30, 2025: a standard inspection.
1 deficiency cited in the last three years.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
When those deficiencies happened
1 deficiency in 1 month of the last 36. Last cited May 2025. Most serious: Standard-level. The last 3 years, to Oct 30, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
May 30, 2025: standard inspection1 deficiency
-
Frequency Reassessment - Unstable - Monthly
The inspectors’ words, 557 words
“PA-FREQUENCY REASSESSMENT-UNSTABLE Q MO CFR(s): 494.80(d)(2) In accordance with the standards specified in paragraphs (a)(1) through (a)(13) of this section, a comprehensive reassessment of each patient and a revision of the plan of care must be conducted- At least monthly for unstable patients including, but not limited to, patients with the following: (i) Extended or frequent hospitalizations; (ii) Marked deterioration in health status; (iii) Significant change in psychosocial needs; or (iv) Concurrent poor nutritional status, unmanaged anemia and inadequate dialysis. This Standard is not met as evidenced by: 38766 Based on a review of policies and procedures, medical records, and staff interviews, the facility’s interdisciplinary team (IDT) members failed to identify a patient as unstable and perform a monthly reassessment and a plan-of-care for one (1) of one (1) sampled patient with an extended hospitalization (Patient #2). Findings included A review on 05/28/2025 of the facility’s policy titled, “Comprehensive Interdisciplinary Assessment and Plan of Care” revised 07/03/2023 revealed “...CIA/POC for Unstable Patients: Unstable patients must be reassessed by the IDT monthly. Monthly reassessment and any POC updates related to the reason the patient is considered ‘unstable’ must be documented until the issues have been resolved or the IDT (including the patient, if possible) determines that the condition is chronic. The following are unstable criteria: a. Hospitalization of more than 15 days with discharge occurring within the last 30 days. ... or Marked deterioration in health status ... or Significant change in psychosocial needs ...” A medical record review on 05/28/2025 of Patient #2 indicated that the patient was admitted to the facility on 05/24/2017 for in-center hemodialysis treatment. A review of the record revealed the patient was admitted to the hospital on 02/28/2025 through 03/18/2025 (18 days hospital stay) with a Discharge Diagnosis of “left foot osteomyelitis.” The record revealed that the patient had his left toes amputated two weeks before the hospital admission. The patient was taken to the hospital’s emergency department for the worsening of redness and drainage. The review revealed the patient was discharged to an in-patient rehab on 03/18/2025 until 04/16/2025 (29 days in-patient rehab stay). The review indicated that the patient’s last Plan of Care (POC) was on 01/24/2025, and the patient’s status was recorded as stable. The review revealed that there was no documentation of monthly reassessments or revisions to the plan of care to consider the patient as unstable by the IDT after a hospitalization of an 18-day stay followed by an in-patient rehab stay of 29 days. An interview on 05/28/2025 at 1545 with the FA confirmed that Patient #2 had a prolonged hospitalization followed by an in-patient rehab stay. The interview revealed that the patient did not receive a care plan upon returning to the clinic because he was doing better than before his hospitalization. A follow-up interview on 05/29/2025 at 1015 with the FA revealed, after a review of the facility policy, the patient should have been deemed unstable and had a plan of care to reassess his status, at which point the provider could have made the decision to keep him unstable or deemed him stable. The FA added that the clinic utilized a computer system that identified unstable patients after a certain number of days of hospitalization. The interview revealed, “I am not sure why the patient was not flagged as unstable by the system.””
All 2 inspections in the last three years
| Date | Visit | What the record says |
|---|---|---|
| May 30, 2025 | Standard inspection | 1 deficiency cited |
| Nov 6, 2024 | Complaint inspection | No deficiencies cited |
Is it certified?
- Medicare-certified dialysis facility, certified or last recertified on May 8, 1989.
- Run for profit.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Chain: Fresenius Medical Care.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for dialysis facilities.
- None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
What does it offer?
- Offers in-center hemodialysis, peritoneal dialysis, home hemodialysis training and a shift starting at 5 p.m. or later.
- 28 dialysis stations.
- CMS doesn’t publish staffing levels for dialysis facilities.
- In CMS’s survey, patients rate its staff 2 of 5.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
Who owns it?
- Part of the Fresenius Medical Care chain, as CMS lists it.
- CMS publishes no owners file for dialysis facilities, so no other owner is named.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
How do patients fare?
- CMS rates it 5 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
- Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; blood transfusions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, better than expected; patients dialysing through a fistula, as expected; patients put on a kidney transplant waitlist in their first year of dialysis, better than expected; patients on a kidney transplant waitlist, better than expected.
- Patients rate it 3 of 5 in CMS’s survey of in-center hemodialysis patients (32 interviews, Oct 18, 2024 to Jul 11, 2025): 47% rated the facility 9 or 10 out of 10.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Star ratingCMS’s star rating for dialysis facilities, 1 to 5 | 5 of 5 |
| Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5 | 3 of 5 |
How does it compare nearby?
- Of the 20 dialysis facilities CMS lists in Wake County, 19 have a star rating from CMS: 2 rated 5 of 5, 6 rated 4 of 5, 9 rated 3 of 5, 2 rated 2 of 5.
- CMS rates this one 5 of 5.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
- CMS doesn’t publish staffing levels for dialysis facilities.
- CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.
Sources
-
Centers for Medicare & Medicaid Services, Dialysis Facility - Listing by Facility (23ew-n7w9).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (ICH CAHPS) - Facility (59mq-zhts).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies (ESRD_2567s_2018_to_2026YTD.xlsx).
Released Oct 28, 2026 and checked Oct 30, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 30, 2026.
From the facility
The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.