Record last released by CMS on Oct 20, 2026.
- 4of 5 CMS’s overall rating
- 3of 5 patient survey rating
- 6 deficiencies cited in the last three years (needs attention)
- 390 beds
Each figure’s source sits beside it, in its section below.
What these words mean4
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
- Condition-level deficiency
- For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual.
What did inspectors find?
The last inspection on record was on Feb 21, 2025: a complaint inspection.
6 deficiencies cited in the last three years, 1 of them at condition level, the most serious.
1 deficiency at condition level, the more serious of CMS’s two levels
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
When those deficiencies happened
6 deficiencies in 2 months of the last 36. Last cited Sep 2024. Most serious: Condition-level. The last 3 years, to Nov 5, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Dec | |||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Sep 6, 2024: complaint inspection3 deficiencies
-
Physical Environment
The inspectors’ words, 137 words
“PHYSICAL ENVIRONMENT CFR(s): 482.41 The hospital must be constructed, arranged, and maintained to ensure the safety of the patient, and to provide facilities for diagnosis and treatment and for special hospital services appropriate to the needs of the community. This Condition is not met as evidenced by: 42809 Based on review of facility documents and employee interviews (EMP), it was determined the facility failed to ensure the condition of the physical plant was maintained in such a manner that the safety and well-being of patients are assured (A0701), and subsequently experienced a fire on the penthouse roof top on September 3, 2024. In addition, the facility failed to maintain written evidence of regular inspection and approval by State or local fire control agencies (A0175). Cross reference: 482.41(a) Physical Environment: Buildings. 482.41(b)(6) Physical Environment: Life Safety From Fire”
-
Maintenance Of Physical Plant
The inspectors’ words, 936 words
“MAINTENANCE OF PHYSICAL PLANT CFR(s): 482.41(a) The condition of the physical plant and the overall hospital environment must be developed and maintained in such a manner that the safety and well-being of patients are assured. This Standard is not met as evidenced by: 45574 Based on a review of facility documents, tour, and employee interview (EMP), it was determined the facility failed to comply with policy while welding on the facility’s roof top which resulted in a spark causing a fire on September 3, 2024. Findings include: On September 4, 2024, a review of facility policy, “Hot Works Permits” (Last Revised: 10/1/2019; Last Approved 1/6/2023) revealed, “Terms and Definitions: A. Hot Works Projects- An activity that may result in sparks, fire, molten slag or hot material that has combustible potential that could cause fires or explosions. 1. Hot Works Project Examples include: welding, soldering, cutting thawing pipes, brazing, grinding, torch applied roofing, etc ... D. OSHA requires fire prevention activities when welding or doing hot works including: 1. If possible and practical, relocate combustibles at least 35 feet from the work site. If relocation of combustibles is not practical, protect/shield combustibles with flame proof covers, metal guards to prevent ignition. 2. Shut down or protect HVAC systems, ducts or other sources that may carry sparks to far away combustibles. 3. Fire resistant shields will be used to prevent ignition when welding or cutting is performed near walls, partitions, ceilings or roof combustible construction materials. 4. To prevent ignition of combustibles on the other side of a metal wall, partition, roof or ceiling, precautions will be taken by placing a fire watch, person who will be posted on the opposite side of the wall to watch for sparks and ignition... .” A review of facility documents revealed that on September 3, 2024, at 11:19 AM, a spark from welding on the hospital “penthouse roof” contacted roof insulation resulting in fire and smoke and initiation of the facility’s fire response plan. Smoke entered the facility through the roof air handler. There was response from multiple fire departments. On September 4, 2024, between approximately 1:00 PM and 1:20 PM, a tour of the roof and penthouse were conducted. Visual inspection of the affected area on penthouse roof, revealed an area of roofing material measuring approximately ten feet by fifteen feet was removed, exposing the steel roof decking material beneath. The roofing material cut away was approximately ten inches thick, and consisted of a rubberized top layer, with multiple layers of foam insulation boards laying atop a corrugated steel decking surface. EMP3 was present and demonstrated the locations of the welding work and fire that occurred on September 3, 2024. Palpable air flow was noted to be drawn into the penthouse from a gap in the roof decking near where the fire had occurred. EMP3 confirmed that this gap was present on the day of the incident as well as a large opening, approximately two foot by four foot, created for the future air handler. During an interview on September 4, 2024, at 9:49 AM, EMP3 stated that the roof fire was contained by use of facility fire extinguishers, both ABC and “dry chem.” The fire department hosed a smoldering area with water. All fire units were released on September 3, 2024, at approximately 2:00 PM. During an interview on September 4, 2024, at 11:06 AM, EMP8 stated that the roof project was a part of the bigger project which was the replacement of the rooftop HVAC system. The construction team was working to add additional support to the “penthouse” roof to accept the “weight of the new HVAC system.” EMP8 and EMP 9 explained the job was bid to “patch in” the supports for the new HVAC system and that the job needed to be watertight by the end of each work day. During an interview on September 5, 2024, at 10:01 AM, EMP10 detailed that this project was “novel” and could not be approached in a “conventional process” since there was penetration of the roof assembly and drawing outside air into the work area. EMP10 also stated that it was not “possible or practical” to relocate combustibles (insulation) or to shut down the HVAC system and have “stale air” in patient areas. During an interview on September 6, 2024, at 9:30 AM, EMP11 explained being responsible for conducting the roof weld for the “duct stand.” EMP11 described that the right weld was completed and as EMP11 began the left weld, “My fire watch stated that he saw smoke.” EMP11 stated that they were not using fire blankets. EMP11 stated the fire blankets were “below” (in the penthouse) in EMP11’s “gang box” (toolbox). EMP11 stated that the work area was approximately 16 inches by 12 inches and had “some concern” with the size of the work area. However, the welding team was “blowing and cleaning the decking before the welding work” to reduce hazards. During an interview on September 6, 2024, at approximately 9:40 AM, EMP10, further explained that it had been decided to keep the work area “as small as possible” to prevent water infiltration and assure the work area would be “watertight” at the end of each workday. In addition, EMP10 acknowledged that fire blankets are “heavy duty,” and in a work area of this size, the fire blanket would eliminate the contractors “room to work” and could not be used. During an interview on September 6, 2024, at 9:30 AM, EMP11 confirmed that the facility did not use “flame proof covers...” (fire blankets) when completing the welds, on September 3, 2024, for the roof “duct stands.”
-
Regular Fire And Safety Inspections
The inspectors’ words, 230 words
“REGULAR FIRE AND SAFETY INSPECTIONS CFR(s): 482.41(b)(8) (6) The hospital must maintain written evidence of regular inspection and approval by State or local fire control agencies. This Standard is not met as evidenced by: 50899 Based upon a review of facility documents and employee interview (EMP), it was determined that the facility failed to maintain written evidence of regular inspection by local fire control agencies. Findings include: On September 4, 2024, at approximately 9:15 AM, a request was made for documentation of fire inspection by the local fire control agency. At approximately 2:15 PM, two letters from the local Fire Chief were provided by EMP3. One undated letter was a commitment of resources by the fire department incase of emergency to evacuate wheelchair bound patients from the dialysis suite on the second floor of the medical office building. The second undated letter was an acknowledgement of a meeting in May, 2024, between EMP3 and the Fire Chief about a kitchen sink being placed near a fire suppression system in the kitchen. The Fire Chief had requested a paper towel dispenser be moved away from the suppression system activation handles. Neither document provided evidence that the facility conducted regular inspections by stat or local fire agencies. On September 4, 2024, at 2:30pm, EMP3 confirmed there was no documentation or evidence of regular inspections and approval by State and local fire department.”
Jun 7, 2024: complaint inspection2 deficiencies
-
Patient Rights: Care In Safe Setting
The inspectors’ words, 703 words
“PATIENT RIGHTS: CARE IN SAFE SETTING CFR(s): 482.13(c)(2) The patient has the right to receive care in a safe setting. This Standard is not met as evidenced by: 42809 Based on review of facility documents, medical record review (MR) and staff interview (EMP), it was determined the facility failed to ensure telemetry alarms were working correctly for one of five telemetry medical records reviewed (MR1). Findings include: Review on June 5, 2024, at approximatley 2:00 PM, of the facility’s “Patient Rights and Responsibilities POL-6602082” dated July 6, 2023, revealed, “... AHN is committed to honoring patient’s rights ... Care Deliver: You have the right to: ... Receive kind, respectful, safe, quality care delivered by skilled staff. ... Receive efficient and quality care with high professional standards that are continually maintained and reviewed. ...”. Review on June 5, 2024, at 1:45 PM, of the facility’s “RN Registered Nurse” job description revealed, “The Registered Nurse assesses human responses and plans, Implements and evaluates nursing care for individuals or families for whom the nurse is responsible. The Registered Nurse is fully responsible for all actions as a licensed nurse and is accountable to patients for the quality of care. ... Essential Responsiblities: Considers maintenance of a safe environment, patient condition, complexity of the intervention and predictability of the outcome. ...”’. Review on May 31, 2024, at approximately 1:00 PM, revealed, “November 14, 2019... GE Healthcare safety notice: Telemetry alarms may not sound ... GE Healthcare ... released six potential safety issues with its Apex Pro Telemetry system under certain conditions. ... is out of wireless range, its battery has been depleted or a communication failure between the server and transmitter has taken place, a ‘no telem’ condition occurs. This condition, along with ‘ECG leads fail,’ system time changes and system restarts, is related to the potential safety issues, according to the safety notice. ... Patients can experience ECG arrhythmias before and after a ‘no telem’ condition and may not re-activate after the condition is resolved. Third could result in delayed treatment for the potentially life-threatening ECG arrhythmia event. ...”. Review on May 31, 2024, of a facility document dated May 9, 2024, revealed, “ ... Telemetry system completely failed. Staff were unaware that [MR1] was not on the monitor as it was not alarming at the of the event. There was no rhythm appearing on the telemetry monitor. New electrodes and batteries had just been placed in the telemetry pack. Telemetry pack was pulled out of use. Biomed came and took pack and said it was a ‘Synthesizer Error.’ Biomed to repair Telepak. ... Only this telemetry box and patient were effected by the outage. The patient had come back onto the monitor after the RN Troubleshot the box, batteries were replaced and new electrodes were placed. Staff did not become aware of the new outage when the patient was found unresponsive on the floor. ... 5/7: Telemetry pack was repaired and brought back into services after synthesizer error was cleared. ...”. Review of MR1 on June 4, 2024, at approximatley 12:00 PM, of an “H&P date of service 5/7/2024 12:26 PM” revealed that the patient was admitted to the Emergency department on May 7, 2024 at 11:42, for increased shortness of breath and found to be hypoxic. The patient was unresponsive on May 8, 2024, and a “Code” was started at 03:44:21, compressions and epinephrine was administered, and the patient’s cardiac rhythm returned to “Sinus tachycardia”. The code ended at 04:09:14. The patient was transferred to the intensive care unit. After the code the family placed the patient on comfort care and MR1 ceased to breath on May 9, 2024, at 14:09. Review on June 4, 2024, at approximatley 2:00 PM, of a nursing note for MR1, dated May 8, 2024, 4:26 AM, revealed, “... RN was doing hourly rounding around 0310. Pt was in bed, bed alarm on, leads and batteries were changed due to heart monitor saying no telemetry, ... Around 0335, ... pt was found unresponsive in the bathroom with oxygen off. .. Pt was taken to bed, CPR was started and code was called. ...”. The above findings were confirmed by EMP1 on May 31, 2024, between 12:00 and 12:30 PM.”
-
Supervision Of Contract Staff
The inspectors’ words, 465 words
“SUPERVISION OF CONTRACT STAFF CFR(s): 482.23(b)(6) All licensed nurses who provide services in the hospital must adhere to the policies and procedures of the hospital. The director of nursing service must provide for the adequate supervision and evaluation of all nursing personnel which occur within the responsibility of the nursing service, regardless of the mechanism through which those personnel are providing services (that is, hospital employee, contract, lease, other agreement, or volunteer). This Standard is not met as evidenced by: 42809 Based on a review of facility documents, medical records (MR), and employee interview (EMP), it was determined the facility failed to document rhythm strips of monitored patient per facility policy for one of three medical records reviewed (MR7), and failed to document telemetry battery changes of telemetry patients two of three medical records reviewed (MR7 and MR9). Findings include: Review on June 5, 2024, at 2:00 PM, revealed a policy, “Bedside Monitoring System Policy #60.3.3.07 POL-5423719”, which indicated, “... 1. General Monitoring information. ... Batteries will be changed every 24 hours. ... Documentation of the rhythm strips will be done every 4 hours in critical care units and every 8 hours in other areas. ... An alarm history review is completed by the nurse at the end of every shift. ... For monitored patients, documentation of cardiac rhythm includes strip, patient name, room number, date, time, lead, heart rate, ... QRS duration QT interval ... Quarterly monitoring will be done by Clinical Engineering Department and results will be reported to the Patient Safety Committee. ...”. Review of MR7 on June 7, 2024, at approximatley 11:00 AM, revealed that the patient was admitted to the hospital on May 25, 2024, at 0100. Further reviewed revealed that he patient was transferred to 5 west from the emergency department at 1218, and required stenting to the left anterior descending artery. Continued review revealed that MR7 was placed on the cardiac monitor on May 24, 2024, at 23:00, and that nursing staff failed to document the QT and QRS waves on May 26, 2024, at 7:00 PM, on May 27, at 7:00 PM, and on May 28, 2024, at 2:00 PM. Review of MR7 on June 5, 2024, at approximately 11:00 AM, revealed no documentation that the telemetry batteries were changed every 24 hours, as per facility policy. Review of MR9 on June 5, 2024, at approximately 11:30 AM, revealed that the patient was admitted to the hospital on May 28, 2024, at 2:50 PM with a chief complaint of confusion. The patient was admitted and was placed on a telemetry monitor. Further review of MR9 revealed no documentation that the telemetry batteries were changed every 24 hours as per facility policy. During an interview on June 7, 2024, at 11:45 AM, EMP1 confirmed the above findings. .”
Jun 3, 2024: complaint inspection1 deficiency
-
Supervision Of Contract Staff
The inspectors’ words, 372 words
“SUPERVISION OF CONTRACT STAFF CFR(s): 482.23(b)(6) All licensed nurses who provide services in the hospital must adhere to the policies and procedures of the hospital. The director of nursing service must provide for the adequate supervision and evaluation of all nursing personnel which occur within the responsibility of the nursing service, regardless of the mechanism through which those personnel are providing services (that is, hospital employee, contract, lease, other agreement, or volunteer). This Standard is not met as evidenced by: 42809 Based on a review of facility documents, medical records (MR), and employee interview (EMP), it was determined the facility failed to follow physician’s orders for a sitter and failed to follow policy and procedures to establish a safe environment for a high-risk suicidal patient, for one of ten medical records reviewed (MR1). Findings include: Review of facility policy “Care of the Patient with Suicide Risk POL-6451697”, last approved 8/15/2023, refers to the “Risk Stratified Response Protocols for the Care of the Patient with Suicide Risk” and the “Environmental Safety Precautions for Patient at Risk of Harming Themselves and Others” documents. Review of “Risk Stratified Response Protocols for the Care of the Patient with Suicide Risk” revealed: “ ... High risk for suicide: Constant Observation will be ordered and implemented ... “. Review of “Environmental Safety Precautions for Patient at Risk of Harming Themselves and Others”, last approved 3/12/2024, revealed: “ ... A thorough safety search is to be conducted with the intent of locating any items which are deemed to be potentially harmful to the patient or staff. ... Remove unnecessary tubing, bandages, and cords from room. ...”. Review of MR1 revealed the patient presented to the emergency department on April 19, 2024, at 5:12 PM, for a voluntary mental health admission with suicidal ideation and a suicide plan. On April 19, 2024, at 5:15 pm, a physcian order was placed for a Constant Observation sitter. Further review of MR1 revealed that on April 16, 2024, at approximately 7:52 PM, the patient was found with no sitter in their room with a call bell wrapped around their neck. The above findings were confirmed by EMP1 and EMP4 during medical record review on May 30, 2024 between 1:00 PM and 2:00 PM.”
All 4 inspections in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Feb 21, 2025 | Complaint inspection | No deficiencies cited |
| Sep 6, 2024 | Complaint inspection | 3 deficiencies cited |
| Jun 7, 2024 | Complaint inspection | 2 deficiencies cited |
| Jun 3, 2024 | Complaint inspection | 1 deficiency cited |
How do patients fare?
- CMS’s overall CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System. for it is 4 of 5.
- Of the measures behind its CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System., CMS counts against the national value: mortality, 0 better and 0 worse of 8; safety of care, 4 better and 0 worse of 7; readmission, 0 better and 2 worse of 11.
- Patients rate it 3 of 5 in CMS’s patient survey (608 surveys completed, Oct 1, 2024 to Sep 30, 2025): 73% rated it 9 or 10 out of 10, and 73% would definitely recommend it.
- Infections, compared by CMS with the national benchmark (Oct 1, 2024 to Sep 30, 2025): central line bloodstream infections (CLABSI), better than the national benchmark; catheter urinary tract infections (CAUTI), better than the national benchmark; surgical site infections after colon surgery, no different than national benchmark; MRSA bloodstream infections, no different than national benchmark; C. diff infections, better than the national benchmark.
- CMS’s patient safety composite for serious complications, PSI 90, Jul 1, 2022 to Jun 30, 2024: no different than the national value.
- Deaths within 30 days, as CMS gives them (Jul 1, 2022 to Jun 30, 2025): heart attack 12.7%, heart failure 10%, pneumonia 17.4%, COPD 9.4%, stroke 11.2%, heart bypass surgery 2.3%. CMS gives no comparison with the national rate for them in this release.
- Readmissions within 30 days, as CMS gives them (Jul 1, 2023 to Jun 30, 2025): heart attack 14.6%, heart failure 20.7%, pneumonia 16.5%, COPD 19.4%, heart bypass surgery 10.8%, hip or knee replacement 5.7%. CMS gives no comparison with the national rate for them in this release.
- After outpatient care, compared by CMS: unplanned hospital visits after a colonoscopy, no different than the national rate; hospital admissions after outpatient chemotherapy, no different than the national rate; emergency visits after outpatient chemotherapy, no different than the national rate; unplanned hospital visits after outpatient surgery, no different than expected.
- Emergency department patients spent a median of 170 minutes there before leaving (Oct 1, 2024 to Sep 30, 2025), and 0% left before being seen.
- 68% of patients with severe sepsis or septic shock got the care CMS measures, SEP-1 (Oct 1, 2024 to Sep 30, 2025).
- Medicare’s spending per patient here is 0.97 times the national median (Jan 1, 2024 to Dec 31, 2024).
CMS, Hospital General Information, Patient survey (HCAHPS) - Hospital, Healthcare Associated Infections - Hospital, Timely and Effective Care - Hospital and Medicare Spending Per Beneficiary - Hospital. Released Aug 13, 2026. Updated quarterly.
CMS, Complications and Deaths - Hospital and Unplanned Hospital Visits - Hospital. Released Sep 30, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Overall ratingCMS’s overall hospital quality star rating, 1 to 5 | 4 of 5 |
| Patient survey ratingCMS star rating from its survey of the hospital’s patients (HCAHPS), 1 to 5 | 3 of 5 |
Is it certified, and in good standing?
- Medicare-certified acute care hospital since Mar 14, 1977.
- Ownership: voluntary non-profit - private.
- It is accredited by The Joint Commission, whose surveys stand in for the state’s routine inspections.
- Cited at For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. in the last three years: it didn’t meet a whole condition of Medicare’s rules for hospitals.
- It has an inpatient rehabilitation unit of 24 beds, which CMS lists apart as a rehabilitation facility.
- Voluntary non-profit - Private.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for hospitals.
- Not among the hospitals whose Medicare payments CMS cut under the Hospital-Acquired Condition Reduction Program for fiscal year 2026.
- 6 deficiencies cited in the last three years came from inspections that included a complaint investigation.
CMS, Hospital-Acquired Condition (HAC) Reduction Program. Released Aug 13, 2026. Updated yearly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
What do patients say about their care?
- CMS doesn’t publish staffing levels for hospitals.
- In CMS’s patient survey, patients rate how well its nurses communicated 4 of 5.
- 39% of its health care workers got a flu shot (Oct 1, 2024 to Mar 31, 2025).
CMS, Patient survey (HCAHPS) - Hospital and Timely and Effective Care - Hospital. Released Aug 13, 2026. Updated quarterly.
Who owns it?
- Allegheny Health Network runs it.
- 16 owners or officers are people: Gregory Harbaugh (corporate director); Joseph Macerelli (corporate director); Thomas L Vankirk (corporate director); Richard Nagy (corporate director); Richard Nagy (managing employee (on the payroll)); John Echement (corporate director); Chong Soon Park (corporate officer); Jacqueline M Bauer (corporate officer); Edward Marasco (corporate director); Brian Devine (corporate officer); Donald M Whiting (corporate director); James Perryman (corporate director); Richard Talarico (corporate director); Matthew A Smith (corporate director); Jason K Wong (corporate director); Brian Ice (corporate director).
- CMS’s Provider of Services file records no change of ownership.
- No private-equity firm among the owners CMS lists.
- No real-estate investment trust among the owners CMS lists.
CMS, Hospital All Owners and Hospital Enrollments. Released Sep 29, 2026. Updated monthly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
| Organisation | Role | Share | Since |
|---|---|---|---|
| Allegheny Health Network | Runs it (operational or managerial control) | 100% | Mar 1, 2013 |
| Highmark Health | Other role (CMS gives no detail) | Apr 29, 2013 |
How does it compare nearby?
- Of the 18 hospitals CMS lists in Allegheny County, 16 have an overall star rating from CMS: 1 rated 5 of 5, 10 rated 4 of 5, 5 rated 3 of 5.
- CMS rates this one 4 of 5.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for hospitals, so none are shown. The one payment cut CMS publishes for each hospital, under its Hospital-Acquired Condition Reduction Program, is shown where it applies.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- Most hospitals are accredited by a private organisation (The Joint Commission, DNV and others) whose routine inspections stand in for the state’s; those reports aren’t public, and QCOR holds only the state’s surveys: no inspection on record here doesn’t mean none took place.
- QCOR says its hospital inspection data are complete only through September 17, 2026, while it moves to a new system.
- CMS doesn’t publish staffing levels for hospitals.
- In its September 2026 release CMS gives no comparison with the national rate for death and readmission rates, though it gives the rates.
Sources
-
Centers for Medicare & Medicaid Services, Hospital General Information (xubh-q36u).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (HCAHPS) - Hospital.
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Healthcare Associated Infections - Hospital (77hc-ibv8).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Complications and Deaths - Hospital (ynj2-r877).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Unplanned Hospital Visits - Hospital (632h-zaca).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Timely and Effective Care - Hospital (yv7e-xc69).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Medicare Spending Per Beneficiary - Hospital (rrqw-56er).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital-Acquired Condition (HAC) Reduction Program (yq43-i98g).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated yearly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Provider of Services File - Hospital & Non-Hospital Facilities (Hospital_and_other.DATA.Q3_2026.csv).
Released Oct 14, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Hospital 2567 statements of deficiencies (Hospital_2567s_2010_to_2026YTD.xlsx).
Released Oct 20, 2026 and checked Oct 27, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital All Owners (Hospital_All_Owners_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital Enrollments (Hospital_Enrollments_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Nov 5, 2026.
From the hospital
The public record above comes first. Anything the hospital adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the hospital will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the hospital”, and paying will never change a finding, a rating or the order of results.