Davita Omaha West Dialysis
A dialysis facility in Omaha, Nebraska 68154
13014 W. Dodge Rd., Omaha, Nebraska 68154. (402) 445-8950.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 28, 2026.
- 3of 5 CMS’s star rating
- 3of 5 patient survey rating
- 5 deficiencies cited in the last three years
- 21 dialysis stations
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Jul 24, 2025: a complaint inspection.
5 deficiencies cited in the last three years.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
When those deficiencies happened
5 deficiencies in 2 months of the last 36. Last cited Jul 2025. Most serious: Standard-level. The last 3 years, to Oct 30, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Jul 24, 2025: complaint inspection1 deficiency
-
Md Resp - Ensure All Adhere To P&P
The inspectors’ words, 670 words
“MD RESP-ENSURE ALL ADHERE TO P&P CFR(s): 494.150(c)(2)(i) The medical director must- (2) Ensure that- (i) All policies and procedures relative to patient admissions, patient care, infection control, and safety are adhered to by all individuals who treat patients in the facility, including attending physicians and nonphysician providers; This Standard is not met as evidenced by: 47269 Based on review of facility policies and procedures, medical record review, and staff interviews, the facility failed to ensure heparin maintenance doses were administered as prescribed during dialysis treatments for 5 of 6 patient medical recordsreviewed (Patient 1, 2, 6, 7, 9). This failed practice had the potential to shorten hemodialysis (HD) treatment time by increasing the risk of clotted blood lines. Findings are: A. Review of the facility policy titled Medication Policy, dated 10/2023, revealed medications are to be administered as prescribed. B. Review of Patient 1’s medical record revealed: 1. A heparin maintenance dose prescription of 1.3 milliliters (ml) per hour for 3 and a half hours for a total of 4,550 ml of heparin. 2. Treatment Details Report entry on: a. 7/7/25 at 10:00 AM, Registered Nurse (RN)-E noted due to the heparin pump malfunction, Patient 1 received 3,990 ml of heparin maintenance dose during HD treatment. b. 7/12/25 at 9:22 AM, Patient Care Technician (PCT)-M noted due to the heparin pump malfunction, Patient 1 received 3,550 ml of heparin maintenance dose during HD treatment. c. 7/16/25 at 9:57 AM, PCT-L noted due to heparin pump malfunction, Patient 1 received 0 ml of heparin maintenance dose during HD treatment. C. Review Patient 2’s medical record revealed: 1. A heparin maintenance dose prescription of 1.5 ml per hour for 4 hours for a total of 6,000 ml of heparin. 2. Treatment Details Report entry on: a. 7/9/25 at 9:04 AM, PCT-I noted due to heparin pump malfunction, Patient 2 received 2,000 ml of heparin maintenance dose during HD treatment. b. 7/18/25 at 9:20 AM, PCT-J noted due to heparin pump malfunction, Patient 2 received 2,000 ml of heparin maintenance dose during HD treatment. D. Review of Patient 6’s medical record revealed: 1. A heparin maintenance dose prescription of 0.4 ml per hour for 4 hours for a total of 1,600 ml of heparin. 2. Treatment Details Report entry on 7/15/25 at 2:20 PM, PCT-M noted due to heparin pump malfunction, Patient 6 received 0 ml of heparin maintenance dose during HD treatment. E. Review of Patient 7’s medical record revealed: 1. A heparin maintenance dose prescription of 1,000 ml per hour for 3 hours for a total of 3,000 ml of heparin. 2. Treatment Details Report entry on: a. 7/12/25 at 2:02 PM, PCT-K noted due to heparin pump malfunction, Patient 7 received 2,200 ml of heparin maintenance dose during HD treatment. b. 7/15/25 at 12:59 PM, PCT-M noted due to heparin pump malfunction, Patient 7 received 2,200 ml of heparin maintenance dose during HD treatment. c. 7/19/25 at 1:35 PM, PCT-J noted due to heparin pump malfunction, Patient 7 received 100 ml of heparin maintenance dose during HD treatment. F. Review of Patient 9’s medical record revealed: 1. A heparin maintenance dose prescription of 600 ml per hour for 3 hours for a total of 1,800 ml of heparin. 2. Treatment Details Report entry on 7/16/25 at 9:25 AM, RN-X noted due to heparin pump malfunction, Patient 9 received 600 ml of heparin maintenance dose during HD treatment. G. During staff interview on 7/23/25 at 12:40 PM, the RN Charge Nurse confirmed of the 6 patient records reviewed for a total of 36 treatments, 10 treatments resulted in patients not receiving their heparin maintenance dose as prescribed due to the heparin pump malfunctioning. H. During staff interview on 7/24/25 at 9:18 AM, the Medical Director confirmed it is the expectation that staff follow the facility policy to administer the heparin maintenance dose as prescribed. Additionally, the Medical Director revealed a process did not exist to ensure patients received their full heparin maintenance dose as prescribed when the heparin pump malfunctioned.”
Apr 7, 2025: standard inspection4 deficiencies
-
Ic - Handling Infectious Waste
The inspectors’ words, 329 words
“IC-HANDLING INFECTIOUS WASTE CFR(s): 494.30(a)(4)(i) [The facility must demonstrate that it follows standard infection control precautions by implementing-] (4) And maintaining procedures, in accordance with applicable State and local laws and accepted public health procedures, for the- (i) Handling, storage and disposal of potentially infectious waste; This Standard is not met as evidenced by: 49530 Based on review of facility policies and procedures, observations, and staff interview, 1 of 9 facility staff members, Patient Care Technician (PCT)-J failed to change their gown prior to providing care to hemodialysis (HD) patients, after removal of a biohazard trash bag from the trash receptacle and compressing the bag against their gown. This failure had the potential to expose all 49 patients receiving HD on the day of the failure to infectious pathogens. The total census was 72. Findings are: A. Review of the facility policy and procedure titled Infection Control for Dialysis Facilities,dated 4/2023, revealed gowns were to be removed as soon as possible if contaminated and placed in a biohazard waste container. B. During the observation of cares on 4/2/25 at 10:00 AM, PCT-J removed a red biohazard bag from the trash receptacle adjacent to HD station 11 following treatment, while cleaning the HD station. The biohazard bag contained trash from the provision of HD treatment. PCT-J held the biohazard bag to their gown and compressed the bag with their arms to expel the air from the bag prior to placing the bag in the biohazard trash container in the center of the treatment floor. There was no attempt to change the gown prior to proceeding with the provision of cares to HD patients present in the treatment area. C. During staff interview on 4/2/25 at 11:00 AM, the Facility Administrator confirmed that PCT-J failed to follow the facility policy and procedure for changing their gown prior to providing care to HD patients, after removal of a biohazard trash bag from the trash receptacle and compressing the bag against their gown.”
-
Ic - Oversight: Monitor Activities & Implement Policies
The inspectors’ words, 251 words
“IC-O-SIGHT-MONITOR ACTIVITY/IMPLEMENT P&P CFR(s): 494.30(b)(1) The facility must- (1) Monitor and implement biohazard and infection control policies and activities within the dialysis unit; This Standard is not met as evidenced by: 47269 Based on review of facility policies and procedures, observations, and staff interviews, the facility failed to identify and remove expired medications and supplies. This failed practice had the potential to expose all 72 patients on census to expired medications and supplies. Findings are: A. Review of the facility policy titled Administration of Intradialytic Parenteral Nutrition (IDPN) (a nutritional therapy administered during hemodialysis (HD) to provide essential nutrients to patients), dated 10/2021, revealed IDPN is to be checked for expiration dates. B. Review of the facility policy titled Medication Policy, dated 10/2023, revealed expired medications are to be disposed of per state/local laws. C. Review of the facility policy titled Infection Control for Dialysis Facilities, dated 4/2023, revealed all supplies will be checked for expiration dates prior to use. D. Observation of the medication refrigerator, on 3/31/25 at 1:15 PM, revealed 2 IDPN with expiration date of 3/20/25, and 3 IDPN with expiration date of 3/27/25. E. Observation of supplies stored in the HD treatment area, on 3/31/25 at 1:30 PM, revealed 38 button hole needles with expiration date of 2/28/25. F. During staff interview on 4/7/25 at 1:00 PM, the Registered Nurse Clinical Coordinator (RNCC) confirmed staff failed to remove expired medications and supplies, from the medication refrigerator and from the HD treatment area, for compliance with facility policies.”
-
Pe - Building - Constructed/Maintained To Ensure Safety
The inspectors’ words, 337 words
“PE-BUILDING-CONSTRUCT/MAINTAIN FOR SAFETY CFR(s): 494.60(a) The building in which dialysis services are furnished must be constructed and maintained to ensure the safety of the patients, the staff and the public. This Standard is not met as evidenced by: 47269 Based on the review of facility policies and procedures, observations and staff interviews facility failed to maintain the building where hemodialysis (HD) treatments were provided to ensure safe and sanitary conditions for patients and staff. This failed practice increased the risk of microbial growth with the potential for negatively affecting the health and safety of all 72 patients on census. Findings are: A. Review of the facility policy titled Physical Environment, dated 4/2018, revealed the building in which dialysis services are furnished will be constructed and maintained for the safety of patients and staff. B. Observations of the HD facility, on 3/31/25 at 12:00 PM with the Facility Administrator (FA), revealed the following: HD treatment area: 1. The cabinet floor, housing the plumbing for the sink labeled dirty (where reusable supplies and equipment exposed to blood or body fluids are stored until cleaned), located between HD stations 1 and 11, appeared warped and cracked, exposing untreated wood. 2. The cabinet flooring, housing the plumbing for the sink labeled clean (for the purpose of staff hand washing), located between HD stations 1 and 11, appeared warped and cracked, exposing untreated wood. Water Room: 1. A puddle of water was present at the base of the brine tank. 2. A puddle of water was present at the base of the water softener. C. During staff interview on 3/31/25 at 3:15 PM, the FA confirmed the cabinetry flooring housing the plumbing of both the sink labeled dirty and the sink labeled clean were in need of repair and no work order had been placed. The FA also confirmed that a work order had not been placed to investigate the source of the puddles of water present at the base of the brine tank and at the base of the water softener.”
-
Assess B/P & Fluid Management Needs
The inspectors’ words, 358 words
“PA-ASSESS B/P, FLUID MANAGEMENT NEEDS CFR(s): 494.80(a)(2) The patient’s comprehensive assessment must include, but is not limited to, the following: Blood pressure, and fluid management needs. This Standard is not met as evidenced by: 47269 Based on review of facility policies and procedures, observations, and staff interviews, facility staff failed to follow the facility policy and procedure for monitoring and documenting intradialytic blood pressures of 1 of 7 sampled patients (Patient 1) during hemodialysis (HD) treatment. Additionally, the facility policy and procedure failed to have a process for manually entering blood pressures when the automated system failed to transmit blood pressures to the computer. This failed practice provided the potential for a lack of interventions by the Registered Nurse (RN) to prevent negative patient outcomes associated with blood pressure changes. The facility census was 72. Findings are: A. Review of the facility policy titled Pre-Intra-Post Treatment Data Collection, Monitoring and Nurse Assessment, dated 4/2024, revealed intradialytic data collection will be completed every 30 minutes during the HD treatment by facility staff. B. Review of Patient 1’s HD treatment record dated 3/15/25 revealed the following: 1. 6:29 AM, RN-F manually entered blood pressure at initiation of HD treatment. 2. 7:00 AM, Patient Care Technician (PCT)-H manually entered intradialytic blood pressure. 3. 7:41 AM, PCT-H manually entered intradialytic blood pressure. 4. 8:11 AM, staff failed to manually enter intradialytic blood pressure. 5. 8:41 AM, staff failed to manually enter intradialytic blood pressure. 6. 9:11 AM, staff failed to manually enter intradialytic blood pressure. 7. 9:41 AM, staff failed to manually enter intradialytic blood pressure. 8. 10:11 AM, staff failed to manually enter intradialytic blood pressure. 9. 10:21 AM, RN-F manually entered blood pressure at the termination of HD treatment. C. During staff interview on 4/7/25 at 1:00 PM, the Registered Nurse Clinical Coordinator (RNCC) confirmed that RN-F and PCT-H failed to manually enter, on 5 occasions, the intradialytic blood pressures at the 30-minute interval, for Patient 1 during HD treatment on 3/15/25. Additionally, RNCC confirmed a process did not exist to alert staff that manual blood pressure entries were required when the automated system failed to transmit blood pressure readings.”
All 2 inspections in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Jul 24, 2025 | Complaint inspection | 1 deficiency cited |
| Apr 7, 2025 | Standard inspection | 4 deficiencies cited |
Is it certified?
- Medicare-certified dialysis facility, certified or last recertified on May 17, 1996.
- Run for profit.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Chain: DaVita.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for dialysis facilities.
- 1 deficiency cited in the last three years came from an inspection that included a complaint investigation.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
What does it offer?
- Offers in-center hemodialysis, peritoneal dialysis, home hemodialysis training and a shift starting at 5 p.m. or later.
- 21 dialysis stations.
- CMS doesn’t publish staffing levels for dialysis facilities.
- In CMS’s survey, patients rate its staff 3 of 5.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
Who owns it?
- Part of the DaVita chain, as CMS lists it.
- CMS publishes no owners file for dialysis facilities, so no other owner is named.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
How do patients fare?
- CMS rates it 3 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
- Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; blood transfusions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, as expected; patients dialysing through a fistula, as expected; patients put on a kidney transplant waitlist in their first year of dialysis, as expected; patients on a kidney transplant waitlist, as expected.
- Patients rate it 3 of 5 in CMS’s survey of in-center hemodialysis patients (30 interviews, Oct 18, 2024 to Jul 11, 2025): 62% rated the facility 9 or 10 out of 10.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Star ratingCMS’s star rating for dialysis facilities, 1 to 5 | 3 of 5 |
| Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5 | 3 of 5 |
How does it compare nearby?
- Of the 13 dialysis facilities CMS lists in Douglas County, 11 have a star rating from CMS: 1 rated 5 of 5, 4 rated 3 of 5, 2 rated 2 of 5, 4 rated 1 of 5.
- CMS rates this one 3 of 5.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
- CMS doesn’t publish staffing levels for dialysis facilities.
- CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.
Sources
-
Centers for Medicare & Medicaid Services, Dialysis Facility - Listing by Facility (23ew-n7w9).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (ICH CAHPS) - Facility (59mq-zhts).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies (ESRD_2567s_2018_to_2026YTD.xlsx).
Released Oct 28, 2026 and checked Oct 30, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 30, 2026.
From the facility
The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.