Hearth Record

Fmc-South Central Louisville

A dialysis facility in Louisville, Kentucky 40219

8319 Preston Highway Suite C,d,e, Louisville, Kentucky 40219. (502) 968-2225.

CMS’s own record, on Care Compare

Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.

The short answer

Record last released by CMS on Oct 14, 2026.

The last 24 months 4 deficiencies in 1 month of the last 36. Last cited Aug 2025. Most serious: Standard-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean3
Star ratings
CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.

What did inspectors find?

The last inspection on record was on Aug 29, 2025: a standard inspection.

4 deficiencies cited in the last three years.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.

When those deficiencies happened

4 deficiencies in 1 month of the last 36. Last cited Aug 2025. Most serious: Standard-level. The last 3 years, to Oct 19, 2026.

4 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 NovDec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOct

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.

Aug 29, 2025: standard inspection4 deficiencies
  • Ic - Wear Gloves/Hand Hygiene

    The inspectors’ words, 794 words

    “IC-WEAR GLOVES/HAND HYGIENE CFR(s): 494.30(a)(1) Wear disposable gloves when caring for the patient or touching the patient’s equipment at the dialysis station. Staff must remove gloves and wash hands between each patient or station. This Standard is not met as evidenced by: 50873 Based on observation, staff interview, and facility policy review, 3 of 7 staff (Patient Care Technicians [PCTs] #1, #3, and #5) observed performing patient care activities failed to perform hand hygiene per facility policy. The findings include: Review of facility policy titled, “Hand Hygiene,” published 11/06/2023, indicated staff should perform hand hygiene “Before and after direct contact with patients. Entering and leaving the treatment area. Before performing any invasive procedure such as vascular access cannulation or administration of parenteral medications. Immediately after removing gloves. After contact with body fluids or excretion, mucous membranes, non-intact skin, and wound dressings if hands are not visibly soiled. After contact with inanimate objects near the patient. When moving from a contaminated body site to a clean body site of the same patient. After contact with the dialysis wall box, concentrate, drain, or water lines. After contact with other objects within the patient station or treatment space.” On 08/26/2025 at 11:28 AM, PCT #5 was observed at treatment station #13. The PCT left the treatment station and went to the nurses’ station and obtained needles and returned to the treatment station. The PCT then left the treatment station at 11:36 AM to gather additional supplies at the nursing station and returned to the treatment station. The PCT failed to perform hand hygiene and change their gloves upon entering and leaving the treatment station. The PCT then palpated the patient’s access, cleaned the access with alcohol, and then changed gloves. The PCT failed to perform hand hygiene when changing gloves. On 08/26/2025 at 12:00 PM, PCT #1 was observed at treatment station #4. The PCT auscultated then palpated the patient’s access, applied antiseptic, and then cannulated the access. The PCT failed to perform hand hygiene and change gloves prior to performing an invasive procedure. During interview on 08/28/2025 at 3:58 PM, PCT #1 stated that changing gloves and using hand sanitizer should be done when leaving the patient station, if visibly dirty, after going to the bathroom, when entering the treatment floor, and when going from the machine to the patient. The PCT confirmed that they did not change gloves after assessing the patient’s access and prior to cannulation at treatment station #1 on 08/26/2025. The PCT stated that a co-worker was nervous so the PCT was helping the co-worker by cannulating the patient, and the PCT stated that was probably why they forgot to perform hand hygiene. On 08/26/2025 at 1:08 PM, PCT #3 was observed at treatment station #6. The PCT removed their gloves, left the treatment station, and donned new gloves. The PCT failed to perform hand hygiene when changing gloves. On 08/26/2025 at 1:20 PM, PCT #3 was observed wearing gloves and working at the dialysis machine at treatment station #3. The PCT left the treatment station, obtained gauze from the clean cart, set the gauze on the chairside table of station #3, left the treatment station and went to the nurses’ station and obtained tape, then returned to treatment station #3. The PCT failed to change gloves and perform hand hygiene when entering and leaving the treatment station. The PCT then disconnected the patient’s bloodlines, gave the patient a glove, then removed their gloves and donned new gloves. The PCT then went to patient treatment station #8, touched the dialysis machine, and changed gloves. The PCT returned to treatment station #3 and removed the patient’s needles and had the patient apply pressure to the sites where the needles had been removed (to stop the bleeding). The PCT removed their gloves, donned new gloves, then went to the clean cart with gloves on then went to treatment station #8. The PCT failed to perform hand hygiene when changing gloves. During interview on 08/27/2025 at 1:35 PM, PCT #7 stated that hand hygiene should be performed when going from dirty areas to clean, when going from one machine to another, from machine to patient, on entering and leaving the treatment station, when changing gloves, and after using the restroom. The PCT also stated that staff should wear gloves at the clean station when preparing supplies. On 08/29/2025 at 3:27 PM, the Clinic Manager confirmed the facility expectation would be for staff to perform hand hygiene per policy to include entering and leaving the treatment station. The Clinic Manager stated, “The staff know they are not supposed to wear gloves at the clean cart.” On 08/29/2025 at 4:06 PM, the Medical Director confirmed the facility expectation for the staff to follow all hand hygiene policies.”

    Rule V0113. Standard-level.

  • Ic - Clean, Disinfect Surfaces & Equipment/Written Protocols

    The inspectors’ words, 470 words

    “IC-DISINFECT SURFACES/EQUIP/WRITTEN PROTOCOL CFR(s): 494.30(a)(4)(ii) [The facility must demonstrate that it follows standard infection control precautions by implementing- (4) And maintaining procedures, in accordance with applicable State and local laws and accepted public health procedures, for the-] (ii) Cleaning and disinfection of contaminated surfaces, medical devices, and equipment. This Standard is not met as evidenced by: 50873 Based on observation, interview, and facility policy review, the facility failed to ensure all environmental surfaces were disinfected at the end of each dialysis treatment for 2 of 2 observations of post-treatment station disinfection. The findings included: Review of a facility policy titled, “Cleaning and Disinfection of the Dialysis Station,” published on 11/02/2020, revealed “Background - The Centers for Medicare and Medicaid Services (CMS) has regulations that in order to prevent cross contamination, a dialysis station must be cleaned and disinfected between dialysis patients. The chair and dialysis equipment are used by multiple patients during a treatment day and it is critical that these items be thoroughly cleaned and disinfected between uses.” During an observation of the hemodialysis treatment area on 08/26/2025 at 11:05 AM, Patient Care Technician (PCT) #1 was observed disinfecting Station #2 following a dialysis treatment. The PCT failed to disinfect the counter behind the treatment chair. During an observation of the hemodialysis treatment area on 08/26/2025 at 11:05 AM, PCT #7 was observed disinfecting Station #1 following a dialysis treatment. The PCT failed to disinfect the counter behind the treatment chair. During interview on 08/27/2025 at 1:35 PM, PCT #13 stated that dialysis treatment station disinfection was done after every treatment after the patient left and prior to the next patient coming in. The PCT stated that the disinfection should include the whole dialysis machine, the chair, and controls or appendages on the machine such as the blood pressure cuff, sharps containers, trash can, and the counter behind the treatment chair. The PCT confirmed that they failed to disinfect the counter behind the treatment chair but did not provide a reason why that was not done. Interview with PCT #1, on 08/28/2025 at 3:58 PM, reveaked that when cleaning the treatment station, staff should clean the chair and the machine to include the top, screen, and keyboard, intravenous (IV) pole, wall box, and counter behind the station. The PCT confirmed that they did not clean the counter behind the treatment chair but did not provide a reason why that was not done. During interview on 08/29/2025 at 3:27 PM, the Clinic Manager confirmed the expectation that the counters behind the treatment chair would be considered part of the dialysis station and should be cleaned as part of station disinfection after each treatment. On 08/29/2025 at 4:06 PM, the Medical Director confirmed the facility expectation that the counters behind the treatment chairs be cleaned as part of the station disinfection.”

    Rule V0122. Standard-level.

  • Manage Volume Status

    The inspectors’ words, 844 words

    “POC-MANAGE VOLUME STATUS CFR(s): 494.90(a)(1) The plan of care must address, but not be limited to, the following: (1) Dose of dialysis. The interdisciplinary team must provide the necessary care and services to manage the patient’s volume status; This Standard is not met as evidenced by: 50873 Based on record review, staff interview, facility policy review, and facility document review, the facility failed to monitor the patient’s fluid status per policy for 5 of 7 patients (Patients #2, #3, #4, #6, and #7) in the record review sample. The findings included: Review of facility policy titled, “Patient Assessment and Monitoring,” with a publication date of 05/01/2023, indicated staff should, “Obtain blood pressure and pulse rate every 30 minutes or more as needed but not to exceed 45 minutes” and “Report to the nurse: Systolic blood pressures greater than 180 mm/Hg [millimeters of mercury - unit of measurement for blood pressure readings], Diastolic blood pressure greater than 100 mm/Hg, Blood pressure less than or equal to 100 mm/Hg systolic” and “Report to the nurse patients whose heart rates have dropped below 60, risen above 100 or become irregular.” 1. Review of a “Treatment Sheet” for Patient #2 on 08/12/2025 indicated Patient Care Technician (PCT) #2 took the patient’s heart rate of 51 at 11:41 AM, 54 at 12:33 PM, and 54 at 3:04 PM; PCT #6 took heart rate readings of 54 at 12:32 PM and 52 at 2:32 PM; and PCT #7 took a heart rate reading of 55 at 2:03 PM. There was no evidence of the PCTs’ notification to the registered nurse (RN) of the out-of-range vital signs. Review of a “Treatment Sheet” for Patient #2 on 08/14/2025 showed no evidence of monitoring the patient’s vital signs from 11:41 AM till 12:32 PM (51 minutes). The treatment sheet also showed that PCT #6 took heart rate readings of 52 at 1:34 PM, 53 at 2:02 PM, and 53 at 2:32 PM. There was no evidence of the PCT’s notification to the RN of the out-of-range vital signs. 2. Review of a “Treatment Sheet” for Patient #3 on 08/16/2025 indicated Patient Care Technician (PCT) #5 took blood pressure readings of 198/84 at 1:19 PM, 199/89 at 1:34 PM, and 224/102 at 3:00 PM. There was no evidence of the PCT’s notification to the registered nurse (RN) of the out-of-range vital signs. 3. Review of a “Treatment Sheet” for Patient #4 on 08/14/2025 indicated that Patient Care Technician (PCT) #2 took the patient’s heart rate of 51 at 8:37 AM, 58 at 9:02 AM, and 59 at 10:21 AM. There was no evidence of the PCT’s notification to the registered nurse (RN) of the out-of-range vital signs. Review of a “Treatment Sheet” for Patient #4 on 08/26/2025 indicated that PCT #3 took blood pressure readings of 187/100 at 7:37 AM, 135/101 at 10:03 AM, and 135/101 at 10:40 AM. There was no evidence of the PCT’s notification to the RN of the out-of-range vital signs. 4. Review of a “Treatment Sheet” for Patient #6 on 08/23/2025 indicated Patient Care Technician (PCT) #6 took the patient’s heart rate of 53 at 1:33 PM, and PCT #4 took a heart rate reading of 59 at 2:32 PM. There was no evidence of the PCTs’ notification to the registered nurse (RN) of the out-of-range vital signs. Review of a “Treatment Sheet” for Patient #6 on 08/26/2025 indicated that PCT #3 took the patient’s heart rate of 53 at 1:10 PM, 56 at 1:30 PM, and 55 at 3:00 PM. There was no evidence of the PCT’s notification to the RN of the out-of-range vital signs. 5. Review of a “Treatment Sheet” for Patient #7 on 08/14/2025 showed no evidence of monitoring the patient’s vital signs from 2:04 PM till 3:35 PM (1 hour and 21 minutes). Additionally, review of a “Treatment Sheet” for Patient #7 on 08/19/2025 showed no evidence of monitoring the patient’s vital signs from 12:03 PM till 1:05 PM (1 hour and 2 minutes). During interview on 08/29/2025 at 12:08 PM, Patient Care Technician (PCT) #3 stated the staff should check the patient’s blood pressure, heart rate, access, and if the patient had any complaints or problems. The PCT stated if the blood pressure was lower than 100/60 or higher than 140/90, and if the heart rate was lower than 60 or higher than 100, the registered nurse (RN) should be notified and the notification should be documented. During interview on 08/27/2025 at 4:20 PM, the Clinic Manager (CM) confirmed the facility expectation that patient monitoring occur at a minimum of every 30 minutes not to exceed 45 minutes and that any notification made by staff such as the RN to the physician or the PCT to the RN should be documented. The CM also stated the facility did not have facility-specific reporting parameters for staff, and the staff should follow the Patient Assessment and Monitoring Policy. On 08/29/2025 at 4:06 PM, the Medical Director confirmed the facility expectation that staff notify the RN of out-of-range vital signs per policy and document the notification.”

    Rule V0543. Standard-level.

  • Vascular Access - Monitor/Referrals

    The inspectors’ words, 291 words

    “POC-VASCULAR ACCESS-MONITOR/REFERRALS CFR(s): 494.90(a)(5) The interdisciplinary team must provide vascular access monitoring and appropriate, timely referrals to achieve and sustain vascular access. The hemodialysis patient must be evaluated for the appropriate vascular access type, taking into consideration co-morbid conditions, other risk factors, and whether the patient is a potential candidate for arteriovenous fistula placement. This Standard is not met as evidenced by: 50873 Based on observation, staff interview, and facility policy review, the facility failed to assess patients’ accesses prior to cannulation per facility policy for 1 of 2 observations of access cannulation. The findings included: A facility policy titled, “Patient Assessment and Monitoring,” dated 05/01/2023, indicated that the pre-treatment access assessment included, “Look. Listen. Feel.” On 08/26/2025 at 11:49 AM, Patient Care Technician (PCT) #5 was observed at patient treatment station #13 initiating dialysis treatment for a patient with an arteriovenous fistula (AVF) or arteriovenous graft (AVG). The PCT palpitated the access, applied alcohol to the access, changed gloves, applied a tourniquet, palpated the access, applied numbing spray, and cannulated the access. The PCT failed to auscultate the access prior to cannulation. During interview on 08/27/2025 at 1:35 PM, PCT #7 stated that AVF and AVG should be assessed prior to cannulating and that to assess an access, the PCT would look, listen, and feel. The PCT stated that should be done every time the access was cannulated. The PCT stated the staff should listen with a stethoscope and that the facility had provided stethoscopes for staff use. During interview on 08/29/2025 at 3:27 PM, the Clinic Manager confirmed that the staff should auscultate every AVF and AVG prior to cannulation. On 08/29/2025 at 4:06 PM, the Medical Director confirmed the facility expectation that auscultation be performed before every cannulation.”

    Rule V0550. Standard-level.

The one inspection in the last three years
Inspections on record
DateVisitWhat the record says
Aug 29, 2025Standard inspection4 deficiencies cited

Is it certified?

  • Medicare-certified dialysis facility, certified or last recertified on Sep 19, 2003.
  • Run for profit.
  • No deficiency on record in the last three years.
  • Chain: Fresenius Medical Care.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.

Has it been penalized?

  • CMS doesn’t publish fines or other penalties for dialysis facilities.
  • None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.

What does it offer?

  • Offers in-center hemodialysis.
  • Doesn’t offer peritoneal dialysis, home hemodialysis training and a shift starting at 5 p.m. or later.
  • 16 dialysis stations.
  • CMS doesn’t publish staffing levels for dialysis facilities.
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Who owns it?

  • Part of the Fresenius Medical Care chain, as CMS lists it.
  • CMS publishes no owners file for dialysis facilities, so no other owner is named.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

How do patients fare?

  • CMS rates it 3 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
  • Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, as expected; patients dialysing through a fistula, as expected; patients put on a kidney transplant waitlist in their first year of dialysis, as expected; patients on a kidney transplant waitlist, as expected.
  • CMS gives no : “Too few completed survey responses to report.”
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Ratings and measures, as published
MeasureRating
Star ratingCMS’s star rating for dialysis facilities, 1 to 53 of 5
Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5Not rated

How does it compare nearby?

  • Of the 27 dialysis facilities CMS lists in Jefferson County, 24 have a star rating from CMS: 5 rated 4 of 5, 11 rated 3 of 5, 6 rated 2 of 5, 2 rated 1 of 5.
  • CMS rates this one 3 of 5.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
  • CMS doesn’t publish staffing levels for dialysis facilities.
  • CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Oct 19, 2026.

From the facility

The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 28, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.