1 report to CPSC, the latest made Oct 29, 2020. A report isn’t a recall.

Watch it to hear when CPSC publishes new reports about it. CPSC’s own search, on saferproducts.gov

Watch and the shortlist are kept with a free account, on every device. Your watch list. CPSC’s own search is on saferproducts.gov.

At a glance

From SaferProducts.gov, released Oct 25, 2026.

  • 1report to CPSC
  • Oct 29, 2020the latest report was made
  • Oct 29, 2020the earliest
  • 1with the company’s comments
Brand
Lester Building
Maker
Lester Building Systems, LLCMakers, importers or sellers, as the reports name them
Product
DoorsCPSC’s product type: Doors, Other or Not Specified (code 1893), in Home Maintenance and Structures: Doors & Windows

By month

1 report from November 2019 to October 2020; the most in October 2020, 1.
The numbers, as a table
Reports to CPSC by the month each was made, newest first
MonthReports
October 20201

How badly anyone was hurt

  • No incident, no one hurt 1 CPSC: No Incident, No Injury

As each report says it, in short words; CPSC’s own words are under each.

The reports, as CPSC published them

Reports people made to the U.S. Consumer Product Safety Commission. CPSC publishes each one after sending it to the company named, and doesn’t guarantee they’re accurate. A report isn’t a recall.

Each report is the words of the person who made it, as CPSC published them. The company’s comments, where CPSC published any, are set apart as the company’s own.

Source:

CPSC, SaferProducts.gov public database export. Released Oct 25, 2026. Updated daily.

  1. No incident, no one hurt

    Made Oct 29, 2020, sent to the company Feb 2, 2021, published by CPSC Feb 17, 2021

    The product, in the report: A Lester Barn Building, 30 foot by 30 foot, with two covered side porches 10 foot wide by 30 foot long. Sliding double barn doors in the front and rear allowing to drive through it. Burgundy/Tan combination colors, and used for storage purposes and lawn equipment.

    I elected to have a steel pole barn building constructed on my property by Lester Building Company, a large builder of these pole barn and steel building kits they manufacture in Ohio. Through their own website, I located a local “dealer/representative” to construct this pole barn for me between the August-December 2019 timeframe. Several of the building’s components were either missing or not the correct part as they were engineered for the custom build kit as ordered by their local “dealer/representative” for this construction project. Having been shipped three separate shipments of small parts after the build kit arrived, some of these parts were damaged beyond their use, or were the incorrect parts needed. One of the serious and hazardous issues I have to this day, pertains to about 120 self-tapping sheetmetal screws of the incorrect length of 2 inches which were used to construct the kit’s 4 sliding barn doors with during their individual construction. Their own “dealer/representative” noticed them himself one day while working on an after-build punchlist of items which to this day also, have been left unfinished by him. These longer screws present a clear danger to myself, my family members, and are protruding inside all 4 of these doors by 1 inch now, with some being right next to the door handles used to slide open these doors. To compound matters, the Lester “dealer/representative” as well as the Lester Area Manager and President/CEO of Lester Building Company, have all been told that I have a serious medical condition which involved me using [REDACTED] to correct it, and which could cause me to have uncontrolled bleeding should I cut myself on one of these protruding door screws. Furthermore, the Lester “dealer/representative” said that he would come back to change these wrong door screws, but this has still not happened almost one year later, and the building has been up since November 2019. The “dealer/representative” was notified of this punchlist in November 2019, and I had to tell him at that time not once, but many times through documented emails, that I would be undergoing a blood infusion to kill off my autoimmune system, so my serious medical condition could have a chance to heal here. I also made the Lester Area Manager, and Lester Building Company President/CEO know about it, and directly requested a meeting twice now to have the Lester Area Manager meet with me to no avail. I even asked to have the correct length 1 inch long screws sent to me via mail, so I could have another outside contractor finally fix this serious hazard. I have worked personally in the Occupational Safety and Health field now for 29 years, have a B.S. in Occupational Safety and Health, and I am considered an expert in Construction Safety to this day, providing training to others who manage safety programs in this field. I have never seen a company disregard a blatant hazardous safety issue such as this, especially so when they have been provided many photographs of this problem. The Lester Area Manager and Lester President/CEO’s position on this-they are saying that this problem is between the customer and their respective Lester Building “dealer/representative”. Now if logic is used here, the company which manufactures this engineered building kit, supplies all of the components to construct this building on any of their customer’s property, has the legal responsibility to provide a safe product here, especially when the top management of this company has been provided with the additonal information of photographs and the customer’s serious medical condition whereas blood thinner is used. In my professional and expert opinion here, Lester Building Company separates themselves on these issues when there are clear problems with their own “dealer/representatives” who they willingly list on their website to use. Since the current Lester “dealer/representative” has not finished his job for me, but instead was too focused on starting new Lester Building jobs around our area, I also requested to have another nearby Lester Building Company “dealer/representative” sent to my home to finish this steel building once and for all. Lester Building Company refuses to do this as well, and without a reason, and would instead, assume the liability upon their company if something should happen to me or a family member. So the problem here starts at the President/CEO level of the Lester Building Company, and each person that seems to be involved here with this product they sell, seems to point the finger of the issues at the other. The customer/consumer here still has an unsafe product by this company. All that we wanted was a completed and safe barn building.

    Model
    30’x30’ Pole Barn
    UPC
    None
    Serial number
    30’x30’
    Bought from
    Lester Building Dealer/Representative
    Bought
    Aug 19, 2019
    Where
    Suffolk, Virginia: Home/Apartment/Condominium
    Who was involved
    Age 52, Unspecified
    The reporter’s relation to them
    My Spouse
    As this report names them
    Brand Lester Building, made or sold by Lester Building Systems, LLC
    How badly, in CPSC’s words
    No Incident, No Injury

CPSC’s disclaimer

Disclaimer: CPSC does not guarantee the accuracy, completeness, or adequacy of the contents of the Publicly Available Consumer Product Safety Information Database on SaferProducts.gov, particularly with respect to information submitted by people outside of CPSC.

Source:

Word for word, from the disclaimer in CPSC’s export.

Sources

Sources
  • U.S. Consumer Product Safety Commission, SaferProducts.gov public database export.

    Released Oct 25, 2026 and checked Oct 25, 2026. Updated daily. Public domain (U.S. Government work). CPSC asks to be credited, and that no endorsement be implied.

Source:

Reports of harm are from the U.S. Consumer Product Safety Commission (CPSC), on SaferProducts.gov. CPSC does not endorse Hearth Record.

Back to Doors

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 8, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.