Ascension St Vincent’s Southside
An acute care hospital in Jacksonville, Florida 32216
4201 Belfort Rd, Jacksonville, Florida 32216. (904) 296-3700.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 20, 2026.
- 4of 5 CMS’s overall rating
- 2of 5 patient survey rating
- 4 deficiencies cited in the last three years
- 295 beds
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Feb 20, 2025: a complaint inspection.
4 deficiencies cited in the last three years.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
When those deficiencies happened
4 deficiencies in 1 month of the last 36. Last cited Feb 2025. Most serious: Standard-level. The last 3 years, to Nov 5, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Dec | |||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Feb 20, 2025: complaint inspection4 deficiencies
-
Patient Rights: Informed Consent
The inspectors’ words, 678 words
“PATIENT RIGHTS: INFORMED CONSENT CFR(s): 482.13(b)(2) The patient or his or her representative (as allowed under State law) has the right to make informed decisions regarding his or her care. The patient’s rights include being informed of his or her health status, being involved in care planning and treatment, and being able to request or refuse treatment. This right must not be construed as a mechanism to demand the provision of treatment or services deemed medically unnecessary or inappropriate. This Standard is not met as evidenced by: 42310 Based on review of medical records, hospital policies, and staff interviews, the facility failed to obtain proper informed consent from a legally designated representative, as required when a patient is incapacitated or otherwise unable to communicate. Hospitals must seek the consent of the legal representative whenever consent is required for care. This deficiency was identified in 1 (Patient #2) of 3 patients sampled. Findings include: 1) From December 29, 2024, through January 12, 2025, the patient was readmitted with acute changes in mental status that ultimately led to a fatal outcome. She arrived via EMS on December 29 at 16:45, unresponsive, and was triaged at 16:51 with an ESI acuity level of 3 (Urgent). An 80-year-old female with ESRD on a Tuesday/Thursday/Saturday dialysis schedule, she had decreased mentation of unknown onset, and family, noted increased fatigue and poor oral intake over the past two days. A CT scan of her head showed no acute intracranial abnormality, though mild atrophy was present. The emergency physician started empiric antibiotics-despite no overt hypotension or lactic acidosis-and consulted both Nephrology and Cardiology, given concern for a high troponin (20.94) and a possible cardiac etiology. The patient’s mental status improved slightly but remained below baseline. By 9:30 PM, she was transferred to the Intensive Care Unit (ICU). The facility discovered the Quinton central line was still in place from the prior admission approximately six weeks prior. In the ICU, her labs revealed a hemoglobin of 7.4 g/dL and platelets of 43 × 10^3/?L. She deteriorated further, developing hypotension consistent with septic shock. Blood cultures returned positive for coagulase-negative Staphylococcus and Proteus, and catheter-tip culture also confirmed those organisms, implicating the central line as the likely source of infection. The old catheter was removed and replaced, and she was treated with broad-spectrum antibiotics (vancomycin and cefepime). Despite these measures, she worsened, with CT evidence suggestive of new bilateral occipital infarcts. She required vasopressors, developed persistent thrombocytopenia and anemia necessitating multiple transfusions, and tested positive for Clostridium difficile again, receiving oral vancomycin. By January 12, 2025, the patient’s prognosis was extremely poor. The family was informed of her grave condition and chose to proceed with comfort measures. Nurse notes indicate that at 14:35, the daughter requested a compassionate extubation; by 14:57, she was extubated to room air with family present. She subsequently became apneic, was pronounced asystole at 15:42, and was officially declared deceased. Her final diagnoses included septic shock secondary to a central line-associated bloodstream infection, multifactorial encephalopathy, acute respiratory failure, ESRD, thrombocytopenia, multifactorial anemia, Type II Diabetes Mellitus, C. diff colitis, and heart failure with preserved ejection fraction. This clinical course and ultimate outcome were traced largely to the infected Quinton catheter that had been left in place. On February 19, 2025, at approximately 1:00 PM, an interview was conducted with the Accreditation and Regulatory Quality Manager, who confirmed that no informed consent had been obtained. She explained the facility proceeded under the assumption of implied consent because the patient was incapacitated upon arrival to the Emergency Department. On February 24, 2025, an email from the same Accreditation and Regulatory Quality Manager confirmed there was no signed informed consent by the patient’s daughter at any point during the admission. She indicated this deficiency was recognized as an opportunity for improvement. A review of the facility policy titled “Informed Consent,” last approved July 2024, revealed that on page 3 under “Incapacitated Adult Patients,” the policy specifies the facility will seek direction from various forms of legal representatives when patients are unable to consent on their own.”
-
Patient Rights: Care In Safe Setting
The inspectors’ words, 382 words
“PATIENT RIGHTS: CARE IN SAFE SETTING CFR(s): 482.13(c)(2) The patient has the right to receive care in a safe setting. This Standard is not met as evidenced by: 42310 Based on record review, policy review, and staff interviews, the facility failed to provide care in a safe setting by leaving a temporary Quinton catheter in place at discharge, resulting in a readmission due to sepsis, and died for 1 (Patient #2) out of 3 patients sampled. The Findings include: 1) From November 8 through November 14, 2024, the patient, an 80-year-old female with End-Stage Renal Disease (ESRD) on a Tuesday/Thursday/Saturday hemodialysis schedule, was admitted following complications with her arteriovenous (AV) fistula. She arrived by ambulance from a skilled nursing facility with a nonfunctioning fistula that prevented her scheduled dialysis session on a Thursday. A duplex ultrasound of her upper extremity confirmed an occluded brachial vein fistula graft. Despite this, she remained hemodynamically stable, and laboratory values were acceptable, so there was no immediate indication for emergent dialysis. On November 11, 2024, at 4:05 PM, a temporary (non-tunneled) hemodialysis catheter was placed in her right internal jugular vein due to the occlusion of her AV fistula. Subsequently, on November 13, 2024, at 1:10 PM, Interventional Radiology performed a successful fistulagram and angioplasty that restored her fistula’s function, allowing the resumption of hemodialysis through the repaired site. At discharge on November 14, 2024, at approximately 5:22 PM, nursing documentation indicated that the patient was sent via ground ambulance to an Assisted Living or Intermediate Care Facility. The notes specifically mentioned that all lines and tubes were intact, including a Quinton catheter that remained in her right neck. This temporary dialysis catheter was not removed prior to discharge. Failure to remove the catheter resulted in the patient becoming septic and readmitted approximately 5-6 weeks later and ultimately death. On 2/19/25 at approximately 11:00 AM an interview with the Manager of Risk Management was conducted. She confirmed the successful fistualgram should have triggered the removal of the temporary dialysis catheter. It was also confirmed the temporary dialysis catheter was not removed prior to discharge. A review of the facility policy titled “Central Venous Access Device & Management” with a last approved date of 06/2024, revealed on page 25, Registered Nurses are allowed to remove non-tunneled catheters.”
-
Staffing And Delivery Of Care
The inspectors’ words, 1,142 words
“STAFFING AND DELIVERY OF CARE CFR(s): 482.23(b) The nursing service must have adequate numbers of licensed registered nurses, licensed practical (vocational) nurses, and other personnel to provide nursing care to all patients as needed. There must be supervisory and staff personnel for each department or nursing unit to ensure, when needed, the immediate availability of a registered nurse for care of any patient. This Standard is not met as evidenced by: 42310 Based on record review, policy review, staff interviews, the facility failed to ensure an adequate number of licensed registered nurses were available to meet the needs of patients based on acuity (number of patients, severity of illness, training/experience of nurses, and readily available resources that are not assigned other duties), resulting in a non-tunneled central line dialysis catheter not being discontinued at discharge that resulted in sepsis and subsequent death for 1 (Patient #2) of 3 patients sampled. Findings include: 1) From November 8 through November 14, 2024, the patient, an 80-year-old female with End-Stage Renal Disease (ESRD) on a Tuesday/Thursday/Saturday hemodialysis schedule, was admitted following complications with her arteriovenous (AV) fistula. She arrived by ambulance from a skilled nursing facility with a nonfunctioning fistula that prevented her scheduled dialysis session on Thursday. A duplex ultrasound of her upper extremity confirmed an occluded brachial vein fistula graft. Despite this, she remained hemodynamically stable, and laboratory values were acceptable, so there was no immediate indication for emergent dialysis. On November 11, 2024, at 4:05 PM, a temporary (non-tunneled) hemodialysis catheter was placed in her right internal jugular vein due to the occlusion of her AV fistula. Subsequently, on November 13, 2024, at 1:10 PM, Interventional Radiology performed a successful fistulagram and angioplasty that restored her fistula’s function, allowing the resumption of hemodialysis through the repaired site. At discharge on November 14, 2024, at approximately 5:22 PM, nursing documentation indicated that the patient was sent via ground ambulance to an Assisted Living or Intermediate Care Facility. The notes specifically mentioned that all lines and tubes were intact, including a Quinton catheter that remained in her right neck. This temporary dialysis catheter was not removed prior to discharge. From December 29, 2024, through January 12, 2025, the patient was readmitted with acute changes in mental status that ultimately led to a fatal outcome. She arrived via EMS on December 29 at 16:45, unresponsive, and was triaged at 4:51 PM with an ESI acuity level of 3 (Urgent). An 80-year-old female with ESRD on a Tuesday/Thursday/Saturday dialysis schedule, she had decreased mentation of unknown onset, and family noted increased fatigue and poor oral intake over the past two days. A CT scan of her head showed no acute intracranial abnormality, though mild atrophy was present. The emergency physician started empiric antibiotics-despite no overt hypotension or lactic acidosis-and consulted both Nephrology and Cardiology, given concern for a high troponin (20.94) and a possible cardiac etiology. The patient’s mental status improved slightly but remained below baseline. By 9:30 PM, she was transferred to the ICU for closer monitoring. While in the ICU, her labs revealed a hemoglobin of 7.4 g/dL and platelets of 43 × 10^3/?L. She deteriorated further, developing hypotension consistent with septic shock. It became apparent that her old temporary Quinton catheter, placed approximately five or six weeks prior, remained. Blood cultures returned positive for coagulase-negative Staphylococcus and Proteus, and catheter-tip culture also confirmed those organisms, implicating the line as the likely source of infection. The old catheter was removed and replaced, and she was treated with broad-spectrum antibiotics (vancomycin and cefepime). Despite these measures, she worsened, with CT evidence suggestive of new bilateral occipital infarcts. She required vasopressors, developed persistent thrombocytopenia and anemia necessitating transfusions. By January 12, 2025, the patient’s prognosis was extremely poor. The family was informed of her grave condition and chose to proceed with comfort measures. Nurse notes indicate that at 14:35, the daughter requested a compassionate extubation; by 2:57 PM, she was extubated to room air with family present. She subsequently became apneic, was pronounced asystole at 3:42 PM, and was officially declared deceased. Her final diagnoses included septic shock secondary to a central line-associated bloodstream infection, multifactorial encephalopathy, acute respiratory failure, ESRD, thrombocytopenia, multifactorial anemia, Type II Diabetes Mellitus, C. diff colitis, and heart failure with preserved ejection fraction. This clinical course and ultimate outcome were traced largely to the infected Quinton catheter that had been left in place. On February 21, 2025, at 4:27 PM, an email from the Accreditation and Regulatory Quality Manager included acuity documentation from the day Patient #2 was discharged without catheter removal. The facility used the American Nurses Association (ANA) Acuity tool to assign scores. On November 14, 2024, 4 East had 18 patients, mostly telemetry, with a total acuity of 42 points, including Patient #2 at level 3 on a 1-to-4 scale. CMS regulations require staffing to patient complexity rather than a fixed ratio, ANA reccommends it. Based on the total acuity of 42 across 18 patients (about 3.5 care hours per patient per 12-hour shift), the unit needed approximately six nurses. However, only three nurses were scheduled, creating insufficient staffing to meet higher acuity needs. On February 20, 2025, at 10:45 AM, Employee B (Registered Nurse) was interviewed. She confirmed working the day in question, describing it as “very busy.” She admitted difficulty completing patient-care tasks and was unsure if central lines were covered during her orientation. She felt uncomfortable with central lines due to limited exposure and minimal experience, stating the need for more detailed training on various central lines. On February 20, 2025 at 8:00 PM, a phone interview was conducted with Employee A, who served as Patient #2’s primary nurse. She did not remove the central line prior to discharge. Although she was not a new nurse, she was new to the facility and on her final orientation day. Her preceptor was managing other responsibilities and unavailable to assist. Employee A reported no central line training during orientation, no 90-day skills competency follow-up from leadership or education staff, and no one verifying that she was signed off on central line management before being assigned a patient with one in place. On February 24, 2025, at 6:00 PM, a phone interview was conducted with the Vice President of Nursing, who confirmed that patients are placed in a level of care ordered by the admitting physician, rather than via a shift-by-shift acuity assessment. She indicated that while “resources” existed, those individuals had existing assignments and were not readily available. Therefore, they could not effectively augment coverage for higher-acuity patients. A review of the facility’s policy titled “Staffing/Scheduling - Hospital Campus Locations,” last approved in February 2024, referenced “acuity” on page 6, indicating that schedule patterns should be planned to minimize daily staffing adjustments by prescheduling personnel in anticipation of acuity and census variations each day of the week.”
-
Patient Care Assignments
The inspectors’ words, 948 words
“PATIENT CARE ASSIGNMENTS CFR(s): 482.23(b)(5) A registered nurse must assign the nursing care of each patient to other nursing personnel in accordance with the patient’s needs and the specialized qualifications and competence of the nursing staff available. This Standard is not met as evidenced by: 42310 Based on policy review, record review, and staff interviews, the facility failed to ensure assigned staff had the proper education and competency to provide proficient care to a patient with a temporary non-tunneled dialysis catheter that contributing to a retained temporary non-tunneled dialysis Quinton catheter at discharge for 1 (Patient #2) of 3 patients sampled. Findings include: 1)From November 8 through November 14, 2024, the patient, an 80-year-old female with End-Stage Renal Disease (ESRD) on a Tuesday/Thursday/Saturday hemodialysis schedule, was admitted following complications with her arteriovenous (AV) fistula. She arrived by ambulance from a skilled nursing facility with a nonfunctioning fistula that prevented her scheduled dialysis session on a Thursday. A duplex ultrasound of her upper extremity confirmed an occluded brachial vein fistula graft. Despite this, she remained hemodynamically stable, and laboratory values were acceptable, so there was no immediate indication for emergent dialysis. On November 11, 2024, at 4:05 PM, a temporary (non-tunneled) hemodialysis catheter was placed in her right internal jugular vein due to the occlusion of her AV fistula. Subsequently, on November 13, 2024, at 1:10 PM, Interventional Radiology performed a successful fistulagram and angioplasty that restored her fistula’s function, allowing the resumption of hemodialysis through the repaired site. At discharge on November 14, 2024, at approximately 5:22 PM, nursing documentation indicated that the patient was sent via ground ambulance to an Assisted Living or Intermediate Care Facility. The notes specifically mentioned that all lines and tubes were intact, including a Quinton catheter that remained in her right neck. This temporary dialysis catheter was not removed prior to discharge. 2) A review of personnel education files revealed that 5 out of 10 sampled staff members had not received the required central line training. Among those 5 was Registered Nurse (RN) A, who served as the primary RN for Patient #2 and failed to remove the centralline prior to discharge. On February 20, 2025, at 10:45 AM, an interview was conducted with Employee B, Registered Nurse. She stated that she worked on the floor the day of the incident and described it as “very busy.” She was helping other nurses and could not finish her own patient?care tasks. She did not recall whether central lines were included in her orientation. She felt uncomfortable with central lines due to limited exposure and minimal nursing experience, indicating a need for more comprehensive training on various central lines. On February 20, 2025, at 2:00 PM, Employee C, Nurse Educator, was interviewed. She stated that she and one other educator were responsible for all educational initiatives across six facilities in three different counties, including one under construction. She estimated she could spend only one to two hours per month, per facility, which she admitted was insufficient to fulfill all educational requirements. She noted that unit leadership was expected to follow up on any post?orientation education needs. On February 20, 2025, at 2:20 PM, an interview was conducted with Employee D, Nurse Educator. She confirmed that she and another educator oversaw new?graduate nurse training for six facilities. The new?graduate program spanned six months, featuring four eight?hour days of hands?on instruction with her. She mentioned that the national Clinical Practice Development (CPD) team had visited all Ascension healthcare facilities in the past to evaluate training, though she could not recall if any changes were made because of those visits. On February 20, 2025, at 3:30 PM, the Market Clinical Professional Manager was interviewed. She acknowledged missing education components for central lines and incomplete 90?day competency books. She stated that Ascension National recognized a system?wide education gap back in October 2024. She could not produce any documentation indicating actions taken to ensure staff were sufficiently trained after that discovery. On February 20, 2025, at 3:50 PM, the Market Clinical Professional Director confirmed awareness of the educational gap, noting she reported completion percentages monthly at national meetings. However, she could not provide documentation reflecting these reported percentages or any steps taken to resolve the issue since October 2024. On February 20, 2025, at 6:30 PM, the Vice President of Nursing confirmed knowledge of the education gaps across Ascension National, explaining she was notified via email in October 2024, along with the Market Clinical Professional Manager and Director. She could not produce documentation suggesting the facility had taken any action in response to this information. On February 20, 2025, at 6:45 PM, a group interview with Risk Management, Quality, Education, the Director of Nursing, and the Vice President of Nursing took place. The Risk Management Director, the Quality Director, and the Director of Nursing each denied having prior knowledge of the identified gap, stating this group meeting was the first time they had been informed. On February 20, 2025, at 8:00 PM, a phone interview was conducted with Employee A, the primary nurse for Patient #2. She confirmed that she did not remove the central line before discharge. Although she was not a new nurse, she was new to the facility and on her final day of orientation with a preceptor. Due to high acuity and the preceptor’s own patient load, she received minimal oversight. She denied receiving any central line training during orientation or having a 90?day skills competency follow?up by education or leadership. She also stated no one-charge nurse or preceptor-verified she had been signed off on central lines before assigning her to a patient who had one in place. Education specific policy was unavailable for review.”
The one inspection in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Feb 20, 2025 | Complaint inspection | 4 deficiencies cited |
How do patients fare?
- CMS’s overall CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System. for it is 4 of 5.
- Of the measures behind its CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System., CMS counts against the national value: mortality, 0 better and 0 worse of 6; safety of care, 1 better and 0 worse of 4; readmission, 1 better and 1 worse of 8.
- Patients rate it 2 of 5 in CMS’s patient survey (414 surveys completed, Oct 1, 2024 to Sep 30, 2025): 68% rated it 9 or 10 out of 10, and 66% would definitely recommend it.
- Infections, compared by CMS with the national benchmark (Oct 1, 2024 to Sep 30, 2025): central line bloodstream infections (CLABSI), no different than national benchmark; catheter urinary tract infections (CAUTI), no different than national benchmark; surgical site infections after colon surgery, no different than national benchmark; MRSA bloodstream infections, better than the national benchmark; C. diff infections, better than the national benchmark.
- CMS’s patient safety composite for serious complications, PSI 90, Jul 1, 2022 to Jun 30, 2024: no different than the national value.
- Deaths within 30 days, as CMS gives them (Jul 1, 2022 to Jun 30, 2025): heart attack 11.3%, heart failure 11.6%, pneumonia 16.7%, COPD 8.6%, stroke 12.2%. CMS gives no comparison with the national rate for them in this release.
- Readmissions within 30 days, as CMS gives them (Jul 1, 2023 to Jun 30, 2025): heart attack 14.3%, heart failure 21.3%, pneumonia 17.2%, COPD 19.1%, hip or knee replacement 5.4%. CMS gives no comparison with the national rate for them in this release.
- After outpatient care, compared by CMS: unplanned hospital visits after a colonoscopy, no different than the national rate; unplanned hospital visits after outpatient surgery, no different than expected.
- Emergency department patients spent a median of 126 minutes there before leaving (Oct 1, 2024 to Sep 30, 2025).
- 77% of patients with severe sepsis or septic shock got the care CMS measures, SEP-1 (Oct 1, 2024 to Sep 30, 2025).
- Medicare’s spending per patient here is 1.11 times the national median (Jan 1, 2024 to Dec 31, 2024).
CMS, Hospital General Information, Patient survey (HCAHPS) - Hospital, Healthcare Associated Infections - Hospital, Timely and Effective Care - Hospital and Medicare Spending Per Beneficiary - Hospital. Released Aug 13, 2026. Updated quarterly.
CMS, Complications and Deaths - Hospital and Unplanned Hospital Visits - Hospital. Released Sep 30, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Overall ratingCMS’s overall hospital quality star rating, 1 to 5 | 4 of 5 |
| Patient survey ratingCMS star rating from its survey of the hospital’s patients (HCAHPS), 1 to 5 | 2 of 5 |
Is it certified, and in good standing?
- Medicare-certified acute care hospital since May 6, 2008.
- Ownership: voluntary non-profit - private.
- It is accredited by The Joint Commission, whose surveys stand in for the state’s routine inspections.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- It has an inpatient rehabilitation unit of 22 beds, which CMS lists apart as a rehabilitation facility.
- Voluntary non-profit - Private.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for hospitals.
- Not among the hospitals whose Medicare payments CMS cut under the Hospital-Acquired Condition Reduction Program for fiscal year 2026.
- 4 deficiencies cited in the last three years came from inspections that included a complaint investigation.
CMS, Hospital-Acquired Condition (HAC) Reduction Program. Released Aug 13, 2026. Updated yearly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
What do patients say about their care?
- CMS doesn’t publish staffing levels for hospitals.
- In CMS’s patient survey, patients rate how well its nurses communicated 3 of 5.
- 94% of its health care workers got a flu shot (Oct 1, 2024 to Mar 31, 2025).
CMS, Patient survey (HCAHPS) - Hospital and Timely and Effective Care - Hospital. Released Aug 13, 2026. Updated quarterly.
Who owns it?
- St Lukes - St Vincents Healthcare owns 100% directly since Apr 12, 2008.
- 11 owners or officers are people: Jeremy Kraft (corporate director); Jeremy Kraft (managing employee (on the payroll)); Coba Cornejo (corporate officer); Coba Cornejo (managing employee (on the payroll)); Coba Cornejo (runs it (operational or managerial control)); Scott Kashman (corporate officer); Scott Kashman (managing employee (on the payroll)); Scott Kashman (runs it (operational or managerial control)); Patrick George (corporate officer); Patrick George (managing employee (on the payroll)); Patrick George (runs it (operational or managerial control)).
- CMS’s Provider of Services file records no change of ownership.
- No private-equity firm among the owners CMS lists.
- No real-estate investment trust among the owners CMS lists.
CMS, Hospital All Owners and Hospital Enrollments. Released Sep 29, 2026. Updated monthly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
| Organisation | Role | Share | Since |
|---|---|---|---|
| St Lukes - St Vincents Healthcare | Owns 5% or more directly | 100% | Apr 12, 2008 |
| St. Vincent’s Health System, Inc. | Owns 5% or more through other companies | 100% | Apr 12, 2008 |
| Us Bank, N.A. | Holds 5% or more security interest | 100% | May 22, 2013 |
How does it compare nearby?
- Of the 10 hospitals CMS lists in Duval County, 7 have an overall star rating from CMS: 1 rated 5 of 5, 4 rated 4 of 5, 1 rated 3 of 5, 1 rated 2 of 5.
- CMS rates this one 4 of 5.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
| Place | Overall star rating |
|---|---|
| HCA Florida Memorial Hospital | 2 |
| River Point Behavioral Health | Not given |
| Wekiva Springs | Not given |
| Shands Jacksonville | 4 |
| Ascension St Vincent’s Riverside | 3 |
| Baptist Health Medical Center - Jacksonville | 4 |
| Baptist Medical Center Beaches | 4 |
| NH Jacksonville | Not given |
| Mayo Clinic | 5 |
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for hospitals, so none are shown. The one payment cut CMS publishes for each hospital, under its Hospital-Acquired Condition Reduction Program, is shown where it applies.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- Most hospitals are accredited by a private organisation (The Joint Commission, DNV and others) whose routine inspections stand in for the state’s; those reports aren’t public, and QCOR holds only the state’s surveys: no inspection on record here doesn’t mean none took place.
- QCOR says its hospital inspection data are complete only through September 17, 2026, while it moves to a new system.
- CMS doesn’t publish staffing levels for hospitals.
- In its September 2026 release CMS gives no comparison with the national rate for death and readmission rates, though it gives the rates.
Sources
-
Centers for Medicare & Medicaid Services, Hospital General Information (xubh-q36u).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (HCAHPS) - Hospital.
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Healthcare Associated Infections - Hospital (77hc-ibv8).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Complications and Deaths - Hospital (ynj2-r877).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Unplanned Hospital Visits - Hospital (632h-zaca).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Timely and Effective Care - Hospital (yv7e-xc69).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Medicare Spending Per Beneficiary - Hospital (rrqw-56er).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital-Acquired Condition (HAC) Reduction Program (yq43-i98g).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated yearly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Provider of Services File - Hospital & Non-Hospital Facilities (Hospital_and_other.DATA.Q3_2026.csv).
Released Oct 14, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Hospital 2567 statements of deficiencies (Hospital_2567s_2010_to_2026YTD.xlsx).
Released Oct 20, 2026 and checked Oct 27, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital All Owners (Hospital_All_Owners_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital Enrollments (Hospital_Enrollments_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Nov 5, 2026.
From the hospital
The public record above comes first. Anything the hospital adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the hospital will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the hospital”, and paying will never change a finding, a rating or the order of results.