Record last released by CMS on Oct 28, 2026.

The last 24 months 9 deficiencies in 1 month of the last 36. Last cited Feb 2025. Most serious: Standard-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean3
Star ratings
CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.

What did inspectors find?

The last inspection on record was on Jan 28, 2026: a standard inspection.

9 deficiencies cited in the last three years.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

When those deficiencies happened

9 deficiencies in 1 month of the last 36. Last cited Feb 2025. Most serious: Standard-level. The last 3 years, to Oct 30, 2026.

9 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 NovDec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOct

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

Feb 26, 2025: standard inspection9 deficiencies
  • Dialysate Proportioning - Monitor Ph/Conductivity

    The inspectors’ words, 254 words

    “DIALYS PROPORT-MONITOR PH/CONDUCTIVITY CFR(s): 494.40(a) 5.6 Dialysate proportioning: monitor pH/conductivity It is necessary for the operator to follow the manufacturer’s instructions regarding dialysate conductivity and to measure approximate pH with an independent method before starting the treatment of the next patient. This Standard is not met as evidenced by: 47632 Based on reviwe of policy and procedure and observations made in the treatment area on 02/25/2025, it was determined that the facility failed to ensure that nursing staff verified the pH of the test water appropriately used for dialysis prior to starting treatment on a patient. Findings include: The following was observed while the personnel were preparing hemodialysis machines for the first shift on 02/25/2025 from 8:30 AM through 2:00 PM: 1. On 02/25/2025 at 1:15 PM, registered nurse (RN) (employee #2) observed performed the pH and conductivity test on the hemodialysis machines located at station #25. RN # 2 upon performing the pH on the machine, inserted the strip to reactivate with the pH of the dialysate, but did not wait fifteen (15) seconds to perform the pH reading. 2. On 02/25/2025 at 1:35 PM, registered nurse (RN) employee #7 observed, performed pH and conductivity test on the hemodialysis machines located at station #22. RN #7 upon performing the pH on the machine, inserted the strip to reactivate with the pH of the dialysate, but did not wait fifteen (15) seconds to perform the pH reading. 3.The facility failed to ensure that registered nurses properly perform dialysate pH in accordance with facility policy.”

    Rule V0250. Standard-level.

  • Personnel - Training Program/Periodic Audits

    The inspectors’ words, 214 words

    “PERSONNEL-TRAINING PROGRAM/PERIODIC AUDITS CFR(s): 494.40(a) 9 Personnel: training program/periodic audits A training program that includes quality testing, the risks and hazards of improperly prepared concentrate, and bacterial issues is mandatory. Operators should be trained in the use of the equipment by the manufacturer or should be trained using materials provided by the manufacturer. The training should be specific to the functions performed (i.e., mixing, disinfection, maintenance, and repairs). Periodic audits of the operators’ compliance with procedures should be performed. The user should establish an ongoing training program designed to maintain the operator’s knowledge and skills. This Standard is not met as evidenced by: 15884 Based on personnel files reviewed conducted on February 26, 2025, at 9:30 AM with the director of nursing (employee #5), it was determined that the facility failed to maintain an ongoing training program designed to maintain the operator’s knowledge and skills. This deficient practice had the potential to affect 32 out of 32 admitted patients receiving services. 51637 Findings include: a. Through review of the water treatment technician supervisor’s file (employee #4), it was determined that the employee did not have training by the manufacturer (Fresenius) in either year 2023 or year 2024. b. Facility failed to ensure that water treatment technicians are trained annually by the machine manufacturer (Fresenius).”

    Rule V0260. Standard-level.

  • Pe - Building - Constructed/Maintained To Ensure Safety

    The inspectors’ words, 138 words

    “PE-BUILDING-CONSTRUCT/MAINTAIN FOR SAFETY CFR(s): 494.60(a) The building in which dialysis services are furnished must be constructed and maintained to ensure the safety of the patients, the staff and the public. This Standard is not met as evidenced by: 47632 Based on observations made in the medication room on 02/25/2025, it was determined that the facility failed to ensure that the building in which dialysis services are furnished must be constructed and maintained to ensure the safety of the patients, the staff and the public. Findings include: During observations made in the medicine room on 02/11/2025, the following was observed: 1. On 02/25/2025 at 9:07 AM, in the medicine room, the water protection wall of the sink was observed with dark stains. 47384 2. On 02/25/2025 at 8:45AM, peeling paint was observed on columb next to treatment station #26.”

    Rule V0402. Standard-level.

  • Pe - Equipment Maintenance - Manufacturer’S Dfu

    The inspectors’ words, 390 words

    “PE-EQUIPMENT MAINTENANCE-MANUFACTURER’S DFU CFR(s): 494.60(b) The dialysis facility must implement and maintain a program to ensure that all equipment (including emergency equipment, dialysis machines and equipment, and the water treatment system) are maintained and operated in accordance with the manufacturer’s recommendations. This Standard is not met as evidenced by: 47384 Based on observations made in the tratment area on 02/25/2025, it was determined that the facility failed to ensure that all equipment is maintained and operated in accordance with the manufacturer’s recommendations. Findings include: During inspection of the emergency evacuation bag it was observed: 1. Two (2) Sodium Chloride 0.45% of 1000 milliliters found expired January 2025. 2. Two (2) Sodium Chloride 0.45% of 500 milliliters found expired November 2024 3. Two (2) Sodium Chloride 0.45% of 100 milliliters found expired December 2024 4. Ten (10) Compound dressings found expired June 2024 5. Three (3) syringes found expired December 2024 6. Nine (9) 21 gauge needles found expired December 2024 7. No inspection worksheet was found for this equipmnet. 47632 Based on observations made in the medication room and isolation area on 02/25/2025, it was determined that the facility failed to ensure that all equipment is maintained and operated in accordance with the manufacturer’s recommendations. Findings include: During the observations made in the medicine room on 02/25/2025 at 8:55 AM through 9:20 AM, the following were found: 1. On 02/25/2025 at 9:02 AM, Sodium Chloride 0.45% of 1000 milliliters one (1) of eighteen (18) expired January 2025. During the observations made in the isolation room on the crash cart with the employee #3 on 02/25/2025 at 9:22 AM through 9:50 AM, the following were found: 1. On 02/25/2025 at 9:24 AM, two (2) blood collection tubes with blue cap expired on 10/31/2024 were observed. 2. On 02/25/2025 at 9:28 AM, two (2) blood collection tubes with red cap expired on 05/31/2024 were observed. 3. On 02/25/2025 at 9:31 AM, two (2) blood collection tubes with violet cap expired on 10/31/2024 were observed. 4. On 02/25/2025 at 9:35 AM, one (1) suction catheter #16 FR expired 04/2016 was observed. 5. On 02/25/2025 at 9:38 AM, two (2) clave connectors were observed expired on 02/01/2025. 6. On 02/25/2025 at 9:40 AM, two (2) vyaire humidifiers observed expired 02/01/2025. 7. On 02/25/2025 at 9:45 AM, one (1) XL surgical gown expired on 12/01/2024.”

    Rule V0403. Standard-level.

  • Pe - Hemodialysis Patients In View During Treatments

    The inspectors’ words, 224 words

    “PE-HD PTS IN VIEW DURING TREATMENTS CFR(s): 494.60(c)(4) Patients must be in view of staff during hemodialysis treatment to ensure patient safety, (video surveillance will not meet this requirement). This Standard is not met as evidenced by: 47632 Based on observations made in the treatment area on 02/25/2025, it was determined that the facility failed to ensure that patients receive treatment in a manner that allows staff to have full view of patients access site for the first shift at patients stations #25, #27, and #29. This deficient effect 3 out of 7 patients observed receiving treatment. Findings include: During the observations made in the treatment area on 02/25/2025 at 8:30 AM through 2:00 PM, the following were found: 1. On 02/25/2025 at 8:25 AM, the patient was located on station # 25, it was observed that the vascular access was covered with sheets. 2. On 02/25/2025 at 8:35 AM, the patient was located on station # 27; it was observed that the vascular access was covered with sheets. 3. On 02/25/2025 at 8:50 AM, the patient was located on station # 29, it was observed that the vascular access was covered with sheets. The facility failed to ensure vascular access sites should be seen by staff members during all dialysis treatment. Allowing patients to cover access provides an opportunity for accidents of needle.”

    Rule V0407. Standard-level.

  • Pe-Fire Safety-Life Safety Code

    The inspectors’ words, 216 words

    “PE-FIRE SAFETY-LIFE SAFETY CODE CFR(s): 494.60(e)(1) (1) Except as provided in paragraph (d)(2) of this section, dialysis facilities that do not provide one or more exits to the outside at grade level from the patient treatment area level must comply with provisions of the Life Safety Code (NFPA 101 and its Tentative Interim Amendments TIA 12-1, TIA 12-2, TIA 12-3, and TIA 12-4) applicable to Ambulatory Health Care Occupancies, regardless of the number of patients served. This Standard is not met as evidenced by: 47384 Based on observations made during the survey for fire safety with the facility’s technical supervisor (Employee #4 ) at 11:20 AM, it was determined that the facility failed to have a fire alarm system that is tested and maintained in accordance with an approved program complying with the requirements of NFPA 70, National Electric Code, and NFPA 72, National Fire Alarm and Signaling Code and NFPA 80 Standard for Fire Doors and Other Opening Protectives. 19.7.6, 8.3.3.1 (LSC) / 5.2, 5.2.3 (2010 NFPA 80) which could affect 32 out of 32 admitted residents. Findings include: 1) Fire alarm annunciator reported 7 trouble signals that were not restored to normal within 200 seconds. 2) Doors #1, #2 and #4 did not pass internal inspection due to perforations, self-closing mechanisms and paint problems.”

    Rule V0417. Standard-level.

  • Manage Volume Status

    The inspectors’ words, 225 words

    “POC-MANAGE VOLUME STATUS CFR(s): 494.90(a)(1) The plan of care must address, but not be limited to, the following: (1) Dose of dialysis. The interdisciplinary team must provide the necessary care and services to manage the patient’s volume status; This Standard is not met as evidenced by: 47632 Based on policies, procedure reviewed, and four (4) records reviewed (RR) on 02/25/2025 through 02/26/2025, it was determined that the facility failed to ensure monitor and document the patients’ blood pressure (B/P) and document nurse action when patients present hypotension during dialysis treatment for 1 out of 4 record review (R.R #4). Findings include: 1. R.R #4 is a 70-year-old male admitted to the facility on 02/02/2021 with a diagnostic End Stage Renal Disease. During the record review performed on 02/05/2025 at 2:23 PM, the hemodialysis treatment three a week for four hours, Dializaer 180 Optiflux NRe, Blood Flow Rate (BFR) of 400, Dialysis Flow Rate (DFR) of 800 and Patient Dry Weight (EDW) of 64.0 kilograms (kg). a. On 02/11/2025 at 1:17 PM, it was revealed that the Blood Pressure (BP) was 188/102mg/Hg. b. On 02/13/2025 at 4:43 PM, it was revealed that the Blood Pressure (BP) was 186/98mg/Hg. c. On 02/22/2025 at 3:34 PM, it was revealed that the Blood Pressure (BP) was 182/95mg/Hg. 2. No evidence was found of nursing interventions or documentation for hypertension.”

    Rule V0543. Standard-level.

  • Water Treatment System Techs Training

    The inspectors’ words, 162 words

    “PQ-H20 TREATMENT SYSTEM TECHS TRAINING CFR(s): 494.140(f) Technicians who perform monitoring and testing of the water treatment system must complete a training program that has been approved by the medical director and the governing body. This Standard is not met as evidenced by: 15884 Based on personnel file review conducted on February 26, 2025, at 9:30 AM with the director of nursing (employee #5), it was determined that the facility failed to ensure that technicians who perform monitoring and testing of the water treatment system are evaluated in order to determine the appropriateness of their executory. This deficient practice had the potential to affect 32 out of patients 32 admitted receiving services. 51637 Findings include: a.Through review of the file of the water treatment technician supervisor (employee #4) it was found facility did not evidence that the employee had a performance evaluation (annual evaluation) of his stated duties during the annual period January through December for the year 2022 either year 2023.”

    Rule V0696. Standard-level.

  • Identifiable Governing Body W/Full Authority/Responsibility

    The inspectors’ words, 332 words

    “GOV-ID GOV BODY W/FULL AUTHORITY/RESPONS CFR(s): 494.180 The ESRD facility is under the control of an identifiable governing body, or designated person(s) with full legal authority and responsibility for the governance and operation of the facility. The governing body adopts and enforces rules and regulations relative to its own governance and to the health care and safety of patients, to the protection of the patients ’ personal and property rights, and to the general operation of the facility. This Standard is not met as evidenced by: 15884 Based on interview with the Facility Nursing Director (employee #5), and review of policies/procedures, it was determined that the facility failed to adopt and enforce rules and regulations relative to its own governance for the general operation of the facility. This deficient practice had the potential to affect 32 out of patients 32 admitted receiving services. Findings include: 1.During the review of Governing Body activities with the Facility Nursing Director (employee #5), on 02/26/2025 at 9:45 AM the following was identified: a.On year 2023 the facility performs a governing body meeting on January 17, 2023. The governing board only met once that year. b. On year 2024 facility performs a governing body meeting on July 16, 2024. The governing board only met once that year. c. Upon review of the facility’s by laws Reference # 5002 Governing Body of Dialysis Services last update on February 17, 2023, on 02/27/2025 at 10:20 AM. Policy clearly stated on the governing body responsibilities that meetings are going to be performed twice a year. d. Facility Nursing Director (employee #5), stated on interview on 02/26/2025 at 10:45 AM that the governing body must held meetings twice a year accordingly with facility’s by laws Reference # 5002 Governing Body of Dialysis Services. Nursing Director (employee #5) stated that it is the governing body responsibility to enforce rules and regulations relating to its own governance and to the healthcare, safety, protection of patients and to the general operation of the facility.”

    Rule V0751. Standard-level.

All 2 inspections in the last three years
Inspections on record
DateVisitWhat the record says
Jan 28, 2026Standard inspectionNo deficiencies cited
Feb 26, 2025Standard inspection9 deficiencies cited

Is it certified?

  • Medicare-certified dialysis facility, certified or last recertified on Sep 1, 1977.
  • Run as a non-profit.
  • No deficiency on record in the last three years.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

Has it been penalized?

  • CMS doesn’t publish fines or other penalties for dialysis facilities.
  • None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

What does it offer?

  • Offers in-center hemodialysis.
  • Doesn’t offer peritoneal dialysis, home hemodialysis training and a shift starting at 5 p.m. or later.
  • 34 dialysis stations.
  • CMS doesn’t publish staffing levels for dialysis facilities.
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Who owns it?

  • CMS lists it as independent, not owned or managed by a chain.
  • CMS publishes no owners file for dialysis facilities, so no other owner is named.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

How do patients fare?

  • CMS rates it 1 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
  • Compared by CMS with what it expects for the facility’s patients: patient survival, worse than expected; hospital admissions, as expected; readmissions to hospital, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, as expected; patients dialysing through a fistula, worse than expected; patients on a kidney transplant waitlist, as expected.
  • CMS gives no : “Too few completed survey responses to report.”
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Ratings and measures, as published
MeasureRating
Star ratingCMS’s star rating for dialysis facilities, 1 to 51 of 5
Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5Not rated

How does it compare nearby?

  • Of the 7 dialysis facilities CMS lists in San Juan, 6 have a star rating from CMS: 6 rated 1 of 5.
  • CMS rates this one 1 of 5.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
  • CMS doesn’t publish staffing levels for dialysis facilities.
  • CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Oct 30, 2026.

From the facility

The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 8, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.