Hearth Record

Fkc Secaucus

A dialysis facility in Secaucus, New Jersey 07094

200 Meadowslands Parkway, Suite 200a, Secaucus, New Jersey 07094. (201) 583-6650.

CMS’s own record, on Care Compare

Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.

The short answer

Record last released by CMS on Oct 28, 2026. We couldn’t read Centers for Medicare & Medicaid Services’ list since Nov 2, 2026: qcor.cms.gov now refuses our reader. This record is as of then.

The last 24 months 2 deficiencies in 1 month of the last 36. Last cited Jan 2024. Most serious: Standard-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean3
Star ratings
CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.

What did inspectors find?

The last inspection on record was on Jan 12, 2024: a standard inspection.

2 deficiencies cited in the last three years.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

When those deficiencies happened

2 deficiencies in 1 month of the last 36. Last cited Jan 2024. Most serious: Standard-level. The last 3 years, to Oct 30, 2026.

2 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 NovDec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOct

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

Jan 12, 2024: standard inspection2 deficiencies
  • Primary/Alternate Means For Communication

    The inspectors’ words, 279 words

    “Primary/Alternate Means for Communication CFR(s): §403.748(c)(3), §416.54(c)(3), §418.113(c)(3), §441.184(c)(3), §460.84(c)(3), §482.15(c)(3), §483.73(c)(3), §483.475(c)(3), §484.102(c)(3), §485.68(c)(3), §485.542(c)(3), §485.625(c)(3), §485.727(c)(3), §485.920(c)(3), §486.360(c)(3), §491.12(c)(3), §494.62(c)(3). [(c) The [facility] must develop and maintain an emergency preparedness communication plan that complies with Federal, State and local laws and must be reviewed and updated at least every 2 years [annually for LTC facilities]. The communication plan must include all of the following: (3) Primary and alternate means for communicating with the following: (i) [Facility] staff. (ii) Federal, State, tribal, regional, and local emergency management agencies. *[For ICF/IIDs at §483.475(c):] (3) Primary and alternate means for communicating with the ICF/IID’s staff, Federal, State, tribal, regional, and local emergency management agencies. This Standard is not met as evidenced by: 30177 Based on review of the “Facility Emergency Management Plan” and interview, it was determined that the facility failed to ensure the “Emergency Management Plan” included an alternate means for communicating with staff in the event of an emergency. Failure to ensure the facility had means for contacting facility staff in the event of an emergency had the potential to hinder the facility’s ability to respond promptly to an emergency and had the potential to negatively affect all 50 in-center hemodialysis patients receiving care at this facility. Findings include: A review of the facility’s undated emergency preparedness plan titled, “Fresenius Kidney Care Emergency Preparedness” revealed the “Emergency Contact Roster” the document contained 15 staff members and failed to include an alternate means for communicating with the 15 staff members. During an interview on 01/11/24 at 10:35 AM, the Facility Administrator confirmed the emergency contact roster did not contain an alternate communication method for 15 of 15 staff members.”

    Rule E0032. Standard-level.

  • Pe - Equipment Maintenance - Manufacturer’S Dfu

    The inspectors’ words, 410 words

    “PE-EQUIPMENT MAINTENANCE-MANUFACTURER’S DFU CFR(s): 494.60(b) The dialysis facility must implement and maintain a program to ensure that all equipment (including emergency equipment, dialysis machines and equipment, and the water treatment system) are maintained and operated in accordance with the manufacturer’s recommendations. This Standard is not met as evidenced by: 30177 Based on interview, document review, and review of the manufacturer’s prescribed preventative maintenance procedures, it was determined that the facility failed to ensure the 2008T BlueStar Premium hemodialysis machines underwent two-year preventative maintenance. This failed practice did not ensure the hemodialysis machines were maintained in optimum operating conditions. The failure to ensure hemodialysis machines underwent preventative maintenance had the potential to negatively affect the 50 in-center hemodialysis patients receiving care at this facility. Findings include: In a joint interview with the Area Technical Operations Manager (ATOM) and the Biomedical Technician (BMT) on 01/11/24 at 11:10 AM, the ATOM revealed the facility uses 2008T BlueStar Premium hemodialysis machines equipped with extended life components. When questioned about the installation date of the hemodialysis machines, the ATOM responded that all machines were put into service on 05/10/18. The ATOM was asked if the hemodialysis machines required two-year maintenance, which included rebuilding the concentrate (acid), bicarbonate, and ultrafiltration (UF) pumps with extended life components every two years or after 8000 hours of operation. He/she replied, “Yes.” During review of the “Machine/Equipment/Maintenance Technician Worksheet,” six of 22 hemodialysis machines (C [8TOS219122], F [8TOS219303], J [8TOS219389], N [8TOS218698], S [8TOS218419], and V [8TOS221118]) were selected for preventative maintenance review for the six-month, annual, and two-year or after 8000 hours of operation maintenance. Of the six sampled hemodialysis machines, there was no documented evidence that four (C, J, N, and V) of the hemodialysis machines received the required two-year or after 8000 hours of operation preventative maintenance. In a follow-up interview on 01/11/24 at 2:00 PM, the ATOM confirmed that four of six sampled hemodialysis machines (C, J, N, and V) had not undergone the 8000 hours of preventative maintenance required. Review of the manufacturer’s preventative maintenance procedures recommendations revealed, “Preventive maintenance for the 2008T hemodialysis system is simple and straightforward. Schedule maintenance is performed based on time intervals or a number of hours a machine is operated, whichever comes first. The time and hour intervals are as follows ...2008T Bluestar Premium machines concentrate (acid), bicarbonate, and ultrafiltration (UF) pumps with extended life components are rebuilt every two years or after 8000 hours of operation. N.J.A.C. 8:43A-24.11(c)”

    Rule V0403. Standard-level.

The one inspection in the last three years
Inspections on record
DateVisitWhat the record says
Jan 12, 2024Standard inspection2 deficiencies cited

Is it certified?

  • Medicare-certified dialysis facility, certified or last recertified on Dec 24, 2018.
  • Run for profit.
  • No deficiency on record in the last three years.
  • Chain: Fresenius Medical Care.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

Has it been penalized?

  • CMS doesn’t publish fines or other penalties for dialysis facilities.
  • None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

What does it offer?

  • Offers in-center hemodialysis.
  • Doesn’t offer peritoneal dialysis, home hemodialysis training and a shift starting at 5 p.m. or later.
  • 19 dialysis stations.
  • CMS doesn’t publish staffing levels for dialysis facilities.
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Who owns it?

  • Part of the Fresenius Medical Care chain, as CMS lists it.
  • CMS publishes no owners file for dialysis facilities, so no other owner is named.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

How do patients fare?

  • CMS rates it 2 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
  • Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; emergency department visits, worse than expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, better than expected; patients dialysing through a fistula, as expected; patients put on a kidney transplant waitlist in their first year of dialysis, as expected; patients on a kidney transplant waitlist, as expected.
  • CMS gives no : “Too few completed survey responses to report.”
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Ratings and measures, as published
MeasureRating
Star ratingCMS’s star rating for dialysis facilities, 1 to 52 of 5
Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5Not rated

How does it compare nearby?

  • Of the 13 dialysis facilities CMS lists in Hudson County, 11 have a star rating from CMS: 4 rated 5 of 5, 4 rated 4 of 5, 1 rated 3 of 5, 2 rated 2 of 5.
  • CMS rates this one 2 of 5.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
  • CMS doesn’t publish staffing levels for dialysis facilities.
  • CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Oct 30, 2026.

From the facility

The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 28, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.