Fmcna Villa Rica
A dialysis facility in Villa Rica, Georgia 30180
130 Prospector Dr, Villa Rica, Georgia 30180. (770) 459-7135.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 28, 2026.
- 4of 5 CMS’s star rating
- Not rated patient survey rating
- 1 deficiency cited in the last three years
- 16 dialysis stations
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Jan 7, 2026: a complaint inspection.
1 deficiency cited in the last three years.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
When those deficiencies happened
1 deficiency in 1 month of the last 36. Last cited Jan 2026. Most serious: Standard-level. The last 3 years, to Oct 30, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Jan 7, 2026: complaint inspection1 deficiency
-
Pe - Building - Constructed/Maintained To Ensure Safety
The inspectors’ words, 682 words
“PE-BUILDING-CONSTRUCT/MAINTAIN FOR SAFETY CFR(s): 494.60(a) The building in which dialysis services are furnished must be constructed and maintained to ensure the safety of the patients, the staff and the public. This Standard is not met as evidenced by: 50523 Based on observation, staff interviews, and a review of the facility’s Policy and Procedures (P&P), it was determined that the facility failed to ensure that the building in which dialysis services were provided, was clean and maintained free from damage and defects to ensure the safety of the patients and staff. Unsanitary environments and excessive moisture could contribute to mold growth on surfaces and materials that could cause various respiratory issues, including allergic reactions, asthma attacks, and infections. Failure to maintain the integrity of all surfaces could hinder effective cleaning and disinfection of the surfaces, thereby creating a potential environment for microbial growth. These environmental concerns were observed in one of one Patient Treatment Room, and one of one Dialysate Preparation/Storage Room. The facility census was 63. Findings include: During observation on 1/7/26 from 10:33 a.m. to 11:40 a.m., the following was revealed: In the Patient Treatment Room: - The second drawer on the left side of the laboratory (lab) refrigerator was missing. - One of the two doors was missing from the cabinet to the right of the lab refrigerator. - The medication cabinets were missing locks, that prevented the medications from being securely stored. - Dried adhesive residue with whitish and brown discoloration was present across vinyl and laminated floors in the center of the Treatment Room. Multiple cracks in the vinyl flooring were observed, that hindered effective cleaning and disinfection of the surfaces. - Duplex electrical outlets with metal faceplates behind Station (S) 8, S10, and S15 were loosely detached from the wall, that posed a potential electrical hazard. In the Dialysate Preparation Room and Storage Room: - The concrete floor beneath the Solution Delivery System (SDS - prepares, controls, and delivers dialysate to dialysis machines) was visibly wet, with pooling water and streaks. There were brown rust-colored stains on the floor surface and along the baseboard to the left of the SDS. - The wall-mounted “Sample Station” (attached to the primary and secondary concentrate tanks) was covered with a white crusty buildup. The drain basin located directly beneath the “Sample Station” was partially filled with a solid crystalline substance, with the same substance also present on the adjacent lower wall and baseboard. - The mixer motor on top of the dry acid dissolution unit (automatically mixes powdered dry acid concentrate with purified water to create liquid acid concentrate) was covered with a white chalky crust and brown colored substance. The above findings were confirmed with the Clinical Manager (CM) on 1/7/26 at 11:45 a.m. She stated that the above issues would be properly addressed, repaired, and thoroughly cleaned to ensure patient and staff safety. On 1/7/26 at 11:59 a.m. the Area Technical Operations Manager (ATOM) stated there was a leak in the pipes connected to the chase boxes built into the central counter in the Patient Treatment Room, supplying 10 hemodialysis machines. Water seeped through the floor, causing glue to rise through the vinyl and laminated flooring, which has since dried. The ATOM confirmed that the whitish substance on the floors was glue. A review of Policy: Version 2, titled, “Receiving and Stocking Medications” with latest revision date of November 7, 2022, showed the following: Stocking Medications: When putting away or stocking received medications the Licensed Nurse shall: 1. Ensure that all medications are secured in a lockable cabinet or medication refrigerator. A review of Policy: Version 9, titled, “General Cleanliness and Infection Control Guidelines” with latest revision date of September 2, 2025, showed the following: All areas must be kept clean and organized, including but not limited to treatment areas, water/supply rooms ... A review of Policy: Version 3, titled, “Electrical Receptacle Verification Procedure” with latest revision date of February 28, 2024, showed the following: 2. Inspect receptable for damage, discoloration, cover plate conditions, security of the wall box. Document the physical condition of receptacle on the RATL-1.”
The one inspection in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Jan 7, 2026 | Complaint inspection | 1 deficiency cited |
Is it certified?
- Medicare-certified dialysis facility, certified or last recertified on Aug 9, 2006.
- Run for profit.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Chain: Fresenius Medical Care.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for dialysis facilities.
- 1 deficiency cited in the last three years came from an inspection that included a complaint investigation.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
What does it offer?
- Offers in-center hemodialysis and peritoneal dialysis.
- Doesn’t offer home hemodialysis training and a shift starting at 5 p.m. or later.
- 16 dialysis stations.
- CMS doesn’t publish staffing levels for dialysis facilities.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
Who owns it?
- Part of the Fresenius Medical Care chain, as CMS lists it.
- CMS publishes no owners file for dialysis facilities, so no other owner is named.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
How do patients fare?
- CMS rates it 4 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
- Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; blood transfusions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, better than expected; patients dialysing through a fistula, as expected; patients put on a kidney transplant waitlist in their first year of dialysis, as expected; patients on a kidney transplant waitlist, as expected.
- CMS gives no CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.: “Too few completed survey responses to report.”
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Star ratingCMS’s star rating for dialysis facilities, 1 to 5 | 4 of 5 |
| Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5 | Not rated |
How does it compare nearby?
- Of the 4 dialysis facilities CMS lists in Carroll County, 4 have a star rating from CMS: 2 rated 4 of 5, 1 rated 3 of 5, 1 rated 2 of 5.
- CMS rates this one 4 of 5.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
| Place | Star rating |
|---|---|
| Fresenius Medical Care Carroll County | 3 |
| Davita North Carrollton Dialysis | 2 |
| Fresenius Kidney Care West Georgia | 4 |
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
- CMS doesn’t publish staffing levels for dialysis facilities.
- CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.
Sources
-
Centers for Medicare & Medicaid Services, Dialysis Facility - Listing by Facility (23ew-n7w9).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (ICH CAHPS) - Facility (59mq-zhts).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies (ESRD_2567s_2018_to_2026YTD.xlsx).
Released Oct 28, 2026 and checked Oct 30, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 30, 2026.
From the facility
The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.