Hearth Record

The Good Shepherd Rehabilitation Hospital

An inpatient rehabilitation facility in Center Valley, Pennsylvania 18034

3200 Center Valley Parkway, Center Valley, Pennsylvania 18034. (610) 242-0345.

CMS’s own record, on Care Compare

Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.

The short answer

Record last released by CMS on Oct 20, 2026.

The last 24 months 9 deficiencies in 1 month of the last 36. Last cited May 2024. Most serious: Standard-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean2
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.

What did inspectors find?

The last inspection on record was on May 22, 2024: a standard inspection.

9 deficiencies cited in the last three years.

Source:

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

When those deficiencies happened

9 deficiencies in 1 month of the last 36. Last cited May 2024. Most serious: Standard-level. The last 3 years, to Nov 5, 2026.

9 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 Dec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOctNov

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

May 22, 2024: standard inspection9 deficiencies
  • Initial Comments - Not A Deficiency Citation

    “Facility ID# 070801 Component 20 Building 04 Schoenersville Road Facility Based on an unannounced Medicare Recertification Survey completed May 21-22, 2024, it was determined that The Good Shepherd Rehabilitation Hospital, was not in compliance with the requirements of the Life Safety Code for an existing rehabilitation care health care occupancy. Compliance with the National Fire Protection Association’s Life Safety Code is required by 42 CFR 482.41(b). This is a three story, Type II (000), unprotected, noncombustible building, with a basement, that is fully sprinklered.”

    Rule K0000. Standard-level.

  • Initial Comments - Not A Deficiency Citation

    “Facility ID# 070801 Component 40 Good Shepherd Rehab New Campus Based on an unannounced Medicare Recertification Survey completed on May 21-22, 2024, it was determined that The Good Shepherd Rehabilitation Hospital was not in compliance with the requirements of the Life Safety Code for a new rehabilitation care health care occupancy. Compliance with the National Fire Protection Association’s Life Safety Code is required by 42 CFR 482.41(b). This is a four story, Type II (222), protected noncombustible building, that is fully sprinklered.”

    Rule K0000. Standard-level.

  • Doors With Self-Closing Devices

    The inspectors’ words, 229 words

    “Doors with Self-Closing Devices CFR(s): NFPA 101 Doors with Self-Closing Devices Doors in an exit passageway, stairway enclosure, or horizontal exit, smoke barrier, or hazardous area enclosure are self-closing and kept in the closed position, unless held open by a release device complying with 7.2.1.8.2 that automatically closes all such doors throughout the smoke compartment or entire facility upon activation of: *Required manual fire alarm system; and *Local smoke detectors designed to detect smoke passing through the opening or a required smoke detection system; and *Automatic sprinkler system, if installed; and *Loss of power. 18.2.2.2.7, 18.2.2.2.8, 19.2.2.2.7, 19.2.2.2.8 This Standard is not met as evidenced by: 32692 Based on observation and interview, it was determined the facility failed to maintain required self closing doors on two of four floors. Findings include; 1. Observation on May 22, 2024, between 9:22 a.m., and 10:53 a.m., revealed the following; a. At 9:22 a.m., 3rd floor, stairtower # 1 had a gap in excess of tolerance on the strike side. b. At 10:30 a.m., 1st floor, double doors into the soiled linen staging area failed to latch when tested. c. At 10:53 a.m., 1st floor, double doors into the electric room, #155 were not self closing and lacked self closing devices. Interview with the facilities director and facility maintenance representative on May 22, 2024, at 11:30 a.m., confirmed the self closing door deficiencies.”

    Rule K0223. Standard-level.

  • Hazardous Areas - Enclosure

    The inspectors’ words, 287 words

    “Hazardous Areas - Enclosure CFR(s): NFPA 101 Hazardous Areas - Enclosure 2012 New Hazardous areas are protected in accordance with 18.3.2.1. The areas shall be enclosed with a 1-hour fire-rated barrier, with a 3/4-hour fire-rated door without windows (in accordance with 8.7.1.1). Doors shall be self-closing or automatic-closing in accordance with 7.2.1.8. Hazardous areas are protected by a sprinkler system in accordance with 9.7, 18.3.2.1, and 8.4. Describe the floor and zone locations of hazardous areas that are deficient in REMARKS. 18.3.2.1, 7.2.1.8, 8.4, 8.7, 9.7 Area Automatic Sprinkler Separation N/A a. Boiler and Fuel-Fired Heater Rooms b. Laundries (larger than 100 square feet) c. Repair, Maintenance, and Paint Shops d. Soiled Linen Rooms (exceeding 64 gallons) e. Trash Collection Rooms (exceeding 64 gallons) f. Combustible Storage Rooms/Spaces (over 50 and less than 100 square feet) g. Combustible Storage Rooms/Spaces (over 100 square feet) h. Laboratories (if classified as Severe Hazard - see K322) This Standard is not met as evidenced by: 32692 Based on observation and interview, it was determined the facility failed to maintain hazardous areas on one of four floors. Findings include; 1. Observation on May 22, 2024, at 10:44 a.m., revealed an open wiring penetration around a blue wire above the exit doors in the boiler room, 1st floor. Interview with the facilities director and facility maintenance representative on May 22, 2024, at 11:30 a.m., confirmed the open wiring penetration. 2. Observation on May 22, 2024, at 11:00 a.m., revealed an open 3 inch square hole in the wall above the door in electrical room 118, on the 1st floor. Interview with the facilities director and facility maintenance representative on May 22, 2024, at 11:30 a.m., confirmed the open penetration of the wall.”

    Rule K0321. Standard-level.

  • Cooking Facilities

    The inspectors’ words, 210 words

    “Cooking Facilities CFR(s): NFPA 101 Cooking Facilities Cooking equipment is protected in accordance with NFPA 96, Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations, unless: *residential cooking equipment (i.e., small appliances such as microwaves, hot plates, toasters) are used for food warming or limited cooking in accordance with 18.3.2.5.2, 19.3.2.5.2. *cooking facilities open to the corridor in smoke compartments with 30 or fewer patients comply with the conditions under 18.3.2.5.3, 19.3.2.5.3, or *cooking facilities in smoke compartments with 30 or fewer patients comply with conditions under 18.3.2.5.4, 19.3.2.5.4. Cooking facilities protected according to NFPA 96 per 9.2.3 are not required to be enclosed as hazardous areas, but shall not be open to the corridor. 18.3.2.5.1 through 18.3.2.5.4, 19.3.2.5.1 through 19.3.2.5.5, 9.2.3, TIA 12-2 This Standard is not met as evidenced by: 32692 Based on document review and interview, it was determined the facility failed to maintain one of one kitchen hood suppression systems. Findings include; 1. Document review and interview on May 21, 2024, revealed the facility could not produce documentation that the kitchen hood suppression system had been inspected since June 2023. Interview with the facilities director and facility maintenance representative on May 22, 2024, at 11:30 a.m., confirmed the suppression system inspection was not completed.”

    Rule K0324. Standard-level.

  • Corridor - Doors

    The inspectors’ words, 260 words

    “Corridor - Doors CFR(s): NFPA 101 Doors protecting corridor openings shall be constructed to resist the passage of smoke. Corridor doors and doors to rooms containing flammable or combustible materials have self-latching and positive latching hardware. Roller latches are prohibited by CMS regulation. These requirements do not apply to auxiliary spaces that do not contain flammable or combustible material. Clearance between bottom of door and floor covering is not exceeding 1 inch. Powered doors complying with 7.2.1.9 are permissible if provided with a device capable of keeping the door closed when a force of 5 lbf is applied. There is no impediment to the closing of the doors. Hold open devices that release when the door is pushed or pulled are permitted. Nonrated protective plates of unlimited height are permitted. Dutch doors meeting 18.3.6.3.6 are permitted. 18.3.6.3, 42 CFR Parts 403, 418, 460, 482, 483, and 485 Show in REMARKS details of doors such as fire protection ratings, automatic closing devices, etc. This Standard is not met as evidenced by: 32692 Based on observation and interview, it was determined the facility failed to maintain corridor doors on two of four floors. Findings include: 1. Observation on May 22, 2024, between 9:00 a.m., and 9:40 a.m., revealed the following; a. At 9:00 a.m., 3rd floor, the double doors at elevator 3 failed to latch. b. At 9:40 a.m., 2nd floor, dining room 267 failed to latch in the frame. Interview with the facilities director and facility maintenance representative on May 22, 2024, at 11:30 a.m., confirmed the doors lacked positive latching.”

    Rule K0363. Standard-level.

  • Gas And Vacuum Piped Systems - Other

    The inspectors’ words, 161 words

    “Gas and Vacuum Piped Systems - Other CFR(s): NFPA 101 Gas and Vacuum Piped Systems - Other List in the REMARKS section any NFPA 99 Chapter 5 Gas and Vacuum Systems requirements that are not addressed by the provided K-Tags, but are deficient. This information, along with the applicable Life Safety Code or NFPA standard citation, should be included on Form CMS-2567. Chapter 5 (NFPA 99) This Standard is not met as evidenced by: 32692 Based on observation and interview, it was determined the facility failed to maintain the piped in medical gas system in one of five smoke compartments. Findings include: 1. Observation on May 21, 2024, at 1:34 p.m., revealed steel metallic cabling in contact with the copper medical gas lines above the ceiling near the clean supply room on the 1st floor. Interview with the facilities director and facility maintenance representative on May 22, 2024, at 11:30 a.m., confirmed the dissimilar metal in contact with the copper tubing.”

    Rule K0902. Standard-level.

  • Gas And Vacuum Piped Systems - Maintenance Pr

    The inspectors’ words, 187 words

    “Gas and Vacuum Piped Systems - Maintenance Pr CFR(s): NFPA 101 Gas and Vacuum Piped Systems - Maintenance Program Medical gas, vacuum, WAGD, or support gas systems have documented maintenance programs. The program includes an inventory of all source systems, control valves, alarms, manufactured assemblies, and outlets. Inspection and maintenance schedules are established through risk assessment considering manufacturer recommendations. Inspection procedures and testing methods are established through risk assessment. Persons maintaining systems are qualified as demonstrated by training and certification or credentialing to the requirements of AASE 6030 or 6040. 5.1.14.2.1, 5.1.14.2.2, 5.1.15, 5.2.14, 5.3.13.4.2 (NFPA 99) This Standard is not met as evidenced by: 32692 Based on observation and interview, it was determined the facility failed to maintain the medical gas system on one of four floors. Findings include: 1. Observation on May 22, 2024, revealed the medical gas alarm panel at the NE nurse station, near room 410, 4th floor was not powered and the display was not showing any function. Interview with the facilities director and facility maintenance representative on May 22, 2024, at 11:30 a.m., confirmed the med-gas alarm panel was not functioning.”

    Rule K0907. Standard-level.

  • Electrical Equipment - Power Cords And Extens

    The inspectors’ words, 253 words

    “Electrical Equipment - Power Cords and Extens CFR(s): NFPA 101 Electrical Equipment - Power Cords and Extension Cords Power strips in a patient care vicinity are only used for components of movable patient-care-related electrical equipment (PCREE) assembles that have been assembled by qualified personnel and meet the conditions of 10.2.3.6. Power strips in the patient care vicinity may not be used for non-PCREE (e.g., personal electronics), except in long-term care resident rooms that do not use PCREE. Power strips for PCREE meet UL 1363A or UL 60601-1. Power strips for non-PCREE in the patient care rooms (outside of vicinity) meet UL 1363. In non-patient care rooms, power strips meet other UL standards. All power strips are used with general precautions. Extension cords are not used as a substitute for fixed wiring of a structure. Extension cords used temporarily are removed immediately upon completion of the purpose for which it was installed and meets the conditions of 10.2.4. 10.2.3.6 (NFPA 99), 10.2.4 (NFPA 99), 400-8 (NFPA 70), 590.3(D) (NFPA 70), TIA 12-5 This Standard is not met as evidenced by: 32692 Based on observation and interview, it was determined the facility failed to maintain power cords in one of five smoke compartments. Findings include: 1. Observation on May 21, 2024, at 1:07 p.m., revealed the bed cord in exam room 2 on the 1st floor was pinched to the floor by the bed. Interview with the facilities director and facility maintenance representative on May 22, 2024, at 11:30 a.m., confirmed the cord was pinched.”

    Rule K0920. Standard-level.

All 2 inspections in the last three years
Inspections on record
DateVisitWhat the record says
May 22, 2024Standard inspection9 deficiencies cited
Apr 18, 2024Standard inspectionNo deficiencies cited

How do patients fare?

  • 63.54% of its patients returned home or to the community: worse than the national rate, as CMS compares it (Oct 1, 2023 to Sep 30, 2025).
  • Compared by CMS: potentially preventable readmissions within 30 days after discharge, no different than the national rate (9.91%); potentially preventable readmissions during the stay, no different than the national rate (5.57%); catheter urinary tract infections (CAUTI), no different than the national benchmark (standardized infection ratio 1.044); C. diff infections, no different than the national benchmark (standardized infection ratio 0.824).
  • As CMS gives them: patients with one or more falls with major injury, 0.17%; patients with new or worsened pressure ulcers or injuries, 1.23%; patients at or above an expected ability to care for themselves and move around at discharge, 68.96%; Medicare spending per patient (1 is the national median), 0.96.
Source:

CMS, Inpatient Rehabilitation Facility - Provider Data. Released Sep 23, 2026. Updated quarterly.

Is it certified?

  • Medicare-certified inpatient rehabilitation facility since Jul 1, 1984.
  • Ownership: non-profit.
  • It is not accredited by a private organisation, so the state carries out its routine inspections for Medicare.
  • No deficiency on record in the last three years.
  • Non-profit.
Source:

CMS, Inpatient Rehabilitation Facility - General Information. Released Sep 23, 2026. Updated quarterly.

CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

Has it been penalized?

  • CMS doesn’t publish fines or other penalties for these facilities.
  • None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
Source:

CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

Who does the caring?

  • CMS doesn’t publish staffing levels for these facilities.
  • 96.55% of its health care workers got a flu shot (Oct 1, 2024 to Mar 31, 2025).
Source:

CMS, Inpatient Rehabilitation Facility - Provider Data. Released Sep 23, 2026. Updated quarterly.

Who owns it?

  • 22 owners or officers are people: David Fessler (corporate director); Matthew Green (corporate director); Victor Salicetti (corporate director); David G Decampli (corporate director); Maura Topper (corporate officer); Maura Topper (corporate director); Mitchell G. Possinger (corporate director); Thomas Lynch (corporate officer); Thomas Lynch (corporate director); Robin Fritsch (managing employee (on the payroll)); Jo-Ann Mendles (corporate director); Anne D Beste (corporate director); Blake C Marles (corporate director); Lori H Gustave (corporate director); Pamela Decampli (corporate director); Michael Spigel (corporate officer); Michael Spigel (managing employee (on the payroll)); Elsbeth Haymon (corporate director); Paul Emrick (corporate director); Eric Todd Young (corporate director); Michael Pessina (corporate officer); Michael Pessina (corporate director).
  • CMS’s Provider of Services file records 1 change of ownership.
  • No private-equity firm among the owners CMS lists.
  • No real-estate investment trust among the owners CMS lists.
Source:

CMS, Hospital All Owners and Hospital Enrollments. Released Sep 29, 2026. Updated monthly.

CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.

How does it compare nearby?

  • Of the 2 inpatient rehabilitation facilities CMS lists in Lehigh County, 2 have CMS’s comparison of their discharges to the community with the national rate: 1 better than the national rate, 1 worse than the national rate.
  • CMS rates this one worse than the national rate for returning patients to the community.
Source:

CMS, Inpatient Rehabilitation Facility - Provider Data. Released Sep 23, 2026. Updated quarterly.

1 compared
PlaceDischarged to the community
Lehigh Valley Hospital71.1

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for inpatient rehabilitation facilities or long-term care hospitals, so none are shown.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • Many of these facilities are accredited by a private organisation (The Joint Commission, DNV and others) whose routine inspections stand in for the state’s; those reports aren’t public, and QCOR holds only the state’s surveys: no inspection on record here doesn’t mean none took place.
  • QCOR says its hospital inspection data are complete only through September 17, 2026, while it moves to a new system.
  • CMS doesn’t publish staffing levels for these facilities.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Nov 5, 2026.

From the facility

The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 28, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.