Select Specialty Hospital - Erie
A long-term care hospital in Erie, Pennsylvania 16501
252 West 11th Street, Erie, Pennsylvania 16501. (814) 874-5300.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 20, 2026.
- 19.6% of its patients went home or back to the community No different than the national rate
- 8 deficiencies cited in the last three years (needs attention)
- 50 beds
Each figure’s source sits beside it, in its section below.
What these words mean3
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
- Condition-level deficiency
- For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual.
What did inspectors find?
The last inspection on record was on Jul 17, 2025: a complaint inspection.
8 deficiencies cited in the last three years, 1 of them at condition level, the most serious.
1 deficiency at condition level, the more serious of CMS’s two levels
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
When those deficiencies happened
8 deficiencies in 2 months of the last 36. Last cited Mar 2025. Most serious: Condition-level. The last 3 years, to Nov 5, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Dec | |||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Mar 25, 2025: complaint inspection3 deficiencies
-
Food And Dietetic Services
The inspectors’ words, 342 words
“FOOD AND DIETETIC SERVICES CFR(s): 482.28 The hospital must have organized dietary services that are directed and staffed by adequate qualified personnel. However, a hospital that has a contract with an outside food management company may be found to meet this Condition of Participation if the company has a dietitian who serves the hospital on a full-time, part-time, or consultant basis, and if the company maintains at least the minimum standards specified in this section and provides for constant liaison with the hospital medical staff for recommendations on dietetic policies affecting patient treatment. This Condition is not met as evidenced by: 39271 Based on review of facility documentation, personnel file review (PF), and a facility tour, it was determined that there was a risk for patients, visitors, and staff of developing food born illness/illnesses when the facility failed to ensure there was a system being implemented for monitoring of temperature regulation and expiration of food products within the Dietary Department. Findings include: 1. On March 21, 2025, a tour of the Dietary Department did not reveal food items within the Dietary Department to include consistent documentation of expiration dates. Further observation revealed approximately 21 boxes of food sitting on the floor of the walk-in freezer, blocking easy access to the freezer entryway. Additional expired food items were identified during a tour of the nutritional rooms on the patient care units. 2. An Immediate Jeopardy was called at 1:28 PM on March 21, 2025, when it was determined that patients, visitors, and/or staff were at risk for developing food born illness/illnesses based on the practices being implemented within the Dietary Department. 3. The Immediate Jeopardy (IJ) was resolved at 5:04 PM on March 21, 2025, when the facility submitted an immediate action plan which included an immediate internal tour of the Dietary Department, education of applicable facility policies for applicable employees prior to the next scheduled shift, and immediate initiation of daily and monthly audits. State Survey Agency verified implementation of an acceptable IJ removal plan. Cross referenced: §482.28(a)(1) Director of Dietary Services”
-
Director Of Dietary Services
The inspectors’ words, 1,476 words
“DIRECTOR OF DIETARY SERVICES CFR(s): 482.28(a)(1) The hospital must have a full-time employee who- (i) Serves as director of the food and dietetic services; (ii) Is responsible for daily management of the dietary services; and (iii) Is qualified by experience or training. This Standard is not met as evidenced by: 39272 Based on review of facility documentation and a facility tour, as well as employee interviews (EMP), it was determined that the facility failed to ensure that the established policies for food safety were being implemented within the Dietary Department and nutrition rooms. Findings include: Review, at approximately 12:30 PM on March 21, 2025, of facility policy FN-FP03 “Storage of Food and Supplies,” revised January 1, 2021, revealed, “... Food and supplies shall be stored in such a manner as to prevent chemical, bacterial or other contamination and to ensure safety and preserve their quality. ... 1. Dry Storage: ... f. Food must be rotated using the First-In, First-Out (FIFO) method so that those with the earliest use-by or expiration dates are used first. ... h. Food will be clearly labeled as to content and opened food will be date marked according to Policy FN-FP04; i. Discard food that has reached its used-by or expiration date; ... 2. Cooler and Freezer: ... f. Do not overload or crowd cooler or freezer which prevents the free circulation of cooled air. ... h. Store items at least 6 inches from the floor or above on clean shelves, racks, or other clean surfaces. Food and supplies are to be protected from splash, dust or other contamination; i. Opened food shall be date marked and stored in containers intended for food which are durable, leak proof and able to be sealed or covered; j. Discard food that has reached it’s use-by or expiration date. ...” Review, at approximately 12:41 PM on March 21, 2025, of facility policy FN-FP04 “Food Safety,” revised January 1, 2021, revealed, “... 3. Handling Leftovers: a. Only use leftover TCS if cooked, held, cooled and stored properly; b. Leftovers should be placed in covered containers and date marker; c. Use leftover TCS foods within 7 days with day 1 being the day the food was prepared; d. For opened foods follow the USDA Food and Beverage storage guidelines; 4. Date Marking: a. After opening or placing in container, food is to be marked with the following information: i. Common name of food; ii. Date opened or prepared; iii. Use by or discard date; b. It is the responsibility of the Food Service Director/Manager to follow their local and state guidelines. ...” Review, at approximately 12:48 PM on March 21, 2025, of facility policy FN-FP05 “Food Preparation,” revised January 1, 2021, revealed, “... To establish general guidelines to ensure prepared food is of highest quality, flavor, appearance and temperature, conserving nutritional value and minimizing bacterial contamination. ...” Review, at approximately 1:00 PM on March 21, 2025, of facility policy FN-FD04 “Retail Food Service,” revised January 1, 2021, revealed, “... To ensure a high-quality dining experience for customers, the retail area will be properly staffed to maintain cleanliness and handle and display food in a safe manner to maintain freshness and quality. Facilities will follow all local, state and federal guidelines. ... 8. Temperatures of food are taken at the start and end of service or at least every 4 hours. A. Hot foods shall be kept 135 degrees F or above. B. Cold foods shall be pre-chilled to a temperature of 41 degrees F or below when placed on display for service and displayed in or on a refrigerated unit that maintains a temperature at 41 degrees F or below. C. Discard TCS food that is not 41 degrees F or lower or 135 degrees F or higher at 4 hour intervals. ...” A tour of the Dietary Department was conducted between approximately 10:30 AM -11:10 AM on March 21, 2025. 1. Observation of a shelving unit located outside of the walk-in freezer and refrigerator revealed the contents to include a full box of original coffee creamer with an expiration date of September 27, 2024, 91 packages of single serve crackers within a storage container with a labeled expiration date of October 28, 2024, five single serve cereal containers with an expiration date of March 9, 2024, three single serve Italian dressing packages with an expiration date of October 22, 2024, six single serve fat free Italian dressing packages with an expiration date of February 24, 2025, and six single serve syrups within a storage container, with a labeled expiration date of January 16, 2025. EMP2 confirmed this finding at the time of observation. Further confirmed that the identified food items should have previously been discarded. 2. Observation of the walk-in freezer revealed the contents to include approximately 21 boxes of food products on the floor. Further observation of the area revealed an opened/non-sealed bag of sausage patties with no open and/or expiration date, a container with approximately 24 in-house packaged sliced ham, dated March 11, 2025, and a tray of approximately nine in-house packaged pork chops, labeled February 9, 2025. EMP1 was unable to verify if the labeled dates on the food items were the dates the items were prepared or the date the items should have been used by. EMP1 was unable to demonstrate knowledge of facility policy for monitoring of food products within the freezer. 3. Observation of the walk-in cooler revealed the contents to include seven bags of in-house sliced ham, dated March 7, 2025, two bowls of pre-pulled uncooked/thawed chicken without an expiration date, one bag of in-house sliced mozzarella cheese, dated March 8, 2025, three bags of in-house sliced mozzarella cheese dated January 13, 2025, one block of cheddar cheese, dated February 22, 2025, five blocks of hot pepper cheese, dated March 8, 2025, and three packages of non-labeled strawberry packages. EMP1 was unable to verify if the labeled dates on the food items were the date the items were prepared or the date the items should have been used by. EMP1 was unable to demonstrate knowledge of facility policy for monitoring of food products within the cooler. 4. Observation of the prep line area revealed the contents of the prep line cooler to include an uncovered and non-labeled tray containing three chicken nuggets and approximately two cups of French fries. Observation of and additional cooler revealed the contents to include approximately 12 unopened bags of frozen foods, including chicken tenders, tater tots, and zucchini sticks. Expiration dates were unable to be identified on the frozen foods included in the cooler. EMP1 confirmed this finding at the time of the observation. 5. Observation of the Café serving line did not reveal completion of current temperature logs for hot or cold foods. EMP1 confirmed temperature logs were not being completed at the time of the observation. A tour of the nutrition rooms on the second and third floor (Patient Care Units), was conducted between approximately 11:10 AM and 11:30 AM on March 21, 2025. 6. A tour of the nutrition room on the second floor revealed six single serve grape jelly containers, seven single serve strawberry jelly containers, 12 single serve sugar free syrups, and 11 single serve containers of peanut butter. Expiration/discard dates were unable to be identified. EMP2 confirmed this finding at the time of observation. Further confirmed that the identified food items should have previously been discarded. 7. A tour of the nutrition room on the third floor revealed four single serve containers of reduced sugar grape jelly, three single serve containers of reduced sugar strawberry jelly and four single serve containers of cereal with an expiration date of March 9, 2025. Further observation of the area revealed an opened package of cookies, 12 single serve containers of honey, and 22 single serve containers of syrup. Expiration date/discard dates on the food items unable to be identified. EMP2 confirmed this finding at the time of observation. Further confirmed that the identified food items should have previously been discarded. 8. Review, at approximately 12:08 PM on March 21, 2025, of the expense receipts provided for the Dietary Department between May 23, 2023, and February 12, 2025, confirmed that foods were being purchased from retail grocery stores, which included but was not limited to foods requiring refrigeration. EMP1 confirmed that he/she was purchasing and transporting the foods from the retail grocery store to the facility. Further confirmed that temperature monitoring between time of purchase and arrival to the facility was not completed. 9. Review, at approximately 2:20 PM on March 21, 2025, of the personnel file for EMP1 revealed that he/she was placed on a 30-day action plan, effective November 1, 2023, for failure to complete duties as required. This finding was confirmed by EMP6 at the time of review. Cross referenced: §482.28 Food And Dietetic Services §482.42(a)(2) Infection Control Program”
-
Infection Control Program
The inspectors’ words, 624 words
“INFECTION CONTROL PROGRAM CFR(s): 482.42(a)(1) The hospital infection prevention and control program, as documented in its policies and procedures, employs methods for preventing and controlling the transmission of infections within the hospital and between the hospital and other institutions and settings; This Standard is not met as evidenced by: 39272 Based on review of facility documentation and a facility tour, as well as employee interviews (EMP), it was determined that the facility failed to maintain a sanitary environment within the Dietary and nutrition rooms of the hospital. Findings include: Review, at approximately 1:55 PM on March 21, 2025, of facility policy FN-S02 “Cleaning & Sanitizing Food Service Equipment/Work Areas,” revised January 1, 2021, revealed, “... C. Nonfood-contact surfaces, such as walls, ceilings, table legs, drains, floors, garbage cans and equipment exteriors must be cleaned regularly to prevent dust, soil and food residue build-up. i. Wash the surface with prepared cleaning solution; ii. Rinse with clean water. ... 7. Monitoring of the cleaning program, by informal inspection of the department, cleaning routine, cleaning schedule and input from staff is conducted daily by the Manager. The Manager should modify the master cleaning schedule as needed. ... 8. Employees will obtain and maintain appropriate sanitation certification(s) and comply with state and local regulations. ...” Review, at approximately 2:05 PM on March 21, 2025, of facility policy FN-S03 “Ware-washing,” revised January 1, 2023, revealed, “... All dishes, three-compartment sinks and dishwashing machine equipment must be properly cleaned and sanitized. Food service staff will utilize proper technique to avoid recontamination of sanitized dishes. ... 4. Dish Machine/Room Cleaning: B. Cleaning process: ... l. Clean walls and floors daily. ...” A tour of the Dietary Department was conducted between approximately 10:30 AM -11:10 AM on March 21, 2025. 1. Observation of the dishwashing room revealed a black residue on the floor tiles surrounding the dishwasher. Further observation of the area revealed non-disposed food particles within the sink. EMP1 confirmed this finding at the time of observation. A tour of the nutrition rooms on the second and third floor (Patient Care Units), was conducted between approximately 11:10 AM and 11:30 AM on March 21, 2025. 2. Observation of the nutrition room on the second floor revealed a non-intact surface area behind the sink. Further observation revealed dried coffee-like substance on the counter. EMP2 confirmed this finding at the time of the observation. 3. Observation of the nutrition room on the third floor revealed a non-intact surface area behind the sink. EMP2 confirmed this finding at the time of the observation. 4. Review, at approximately 12:08 PM on March 21, 2025, of the expense receipts provided for the Dietary Department between May 23, 2023, and February 12, 2025, confirmed that foods were being purchased from retail grocery stores, which included but was not limited to foods requiring refrigeration. EMP1 confirmed that he/she was purchasing and transporting the foods from the retail grocery store to the facility. Further confirmed that temperature monitoring between time of purchase and arrival to the facility was not completed. 5. Review, at approximately 2:30 PM on March 21, 2025, of the “2024 Annual Evaluation of the IC Program and IC Plan for 2025,” no date provided, did not reveal content of the document to include review of the Dietary Department. On March 25, 2025, EMP3 confirmed that review of the Dietary Department was not routinely reviewed as part of the infection control process. 6. Review, at approximately 2:20 PM on March 21, 2025, of the personnel file for EMP1 revealed that he/she was placed on a 30-day action plan, effective November 1, 2023, for failure to complete duties as required. This finding was confirmed by EMP6 at the time of review. Cross referenced: §482.28(a)(1) Director of Dietary Services”
Feb 28, 2024: complaint inspection5 deficiencies
-
Initial Comments - Not A Deficiency Citation
“Facility ID # 08230101 Component 02 Main Building Based on an abbreviated survey that was part of a complaint investigation completed on February 22-28, 2024, it was determined that Select Specialty Hospital-Erie was not in compliance with the licensure requirements for a health care facility. This is a four-story, Type II (222), fire resistive building, with a penthouse and basement, that is fully sprinklered.”
-
Building Construction Type And Height
The inspectors’ words, 401 words
“Building Construction Type and Height CFR(s): NFPA 101 Building Construction Type and Height 2012 EXISTING Building construction type and stories meets Table 19.1.6.1, unless otherwise permitted by 19.1.6.2 through 19.1.6.7 19.1.6.4, 19.1.6.5 Construction Type 1 I (442), I (332), II (222) Any number of stories non-sprinklered and sprinklered 2 II (111) One story non-sprinklered Maximum 3 stories sprinklered 3 II (000) Not allowed non-sprinklered 4 III (211) Maximum 2 stories sprinklered 5 IV (2HH) 6 V (111) 7 III (200) Not allowed non-sprinklered 8 V (000) Maximum 1 story sprinklered Sprinklered stories must be sprinklered throughout by an approved, supervised automatic system in accordance with section 9.7. (See 19.3.5) Give a brief description, in REMARKS, of the construction, the number of stories, including basements, floors on which patients are located, location of smoke or fire barriers and dates of approval. Complete sketch or attach small floor plan of the building as appropriate. This Standard is not met as evidenced by: 43721 Based on observation and interview, the facility failed to inspect and maintain the building construction type for a Type II (222)-rated building, affecting one of over two building roof sections. Findings include: Observation and interview on February 22, 2024, at 10:17 a.m., revealed the boiler room roofline had a section of rubber roofing material (measuring approximately 80 feet squared) used as a temporary fix. The material was laying over the existing roofline, and there were weights placed to secure it from movement. Additionally, the temporary material was tight against the boiler exhaust pipe without a rated thimble in place. Through interview on a previous date, the boiler exhaust reached a temperature high enough that caused the roof material to fail/melt. The building management group was responsible for the roof repairs and had completed the temporary fix. Observation on February 28, 2024, revealed the weights were removed and the rubber roofing material was secured in place. There was also a thimble in place around the section of boiler exhaust, but it was unknown at the time of the survey if the repair or material was approved/rated for this application. Further discussions indicated that the facility failed to obtain required approval from the Department of Health State Plan Review and receive a granted occupancy from the Life Safety Division for this project. Interview with the director of plant operations and maintenance technician on February 28, 2024, at 10:17 a.m., confirmed the deficiencies.”
-
Doors With Self-Closing Devices
The inspectors’ words, 238 words
“Doors with Self-Closing Devices CFR(s): NFPA 101 Doors with Self-Closing Devices Doors in an exit passageway, stairway enclosure, or horizontal exit, smoke barrier, or hazardous area enclosure are self-closing and kept in the closed position, unless held open by a release device complying with 7.2.1.8.2 that automatically closes all such doors throughout the smoke compartment or entire facility upon activation of: * Required manual fire alarm system; and * Local smoke detectors designed to detect smoke passing through the opening or a required smoke detection system; and * Automatic sprinkler system, if installed; and * Loss of power. 18.2.2.2.7, 18.2.2.2.8, 19.2.2.2.7, 19.2.2.2.8 This Standard is not met as evidenced by: 43721 Based on observation and interview, the facility failed to maintain doors with self-closing devices on one of six building levels. Findings include: Observation on February 22, 2024, between 9:30 a.m. and 9:34 a.m., revealed the following self-closure deficiencies: A. (9:30 a.m.) Penthouse east door was damaged and would not close and latch in the frame. The facility provided an invoice that indicated that the door was in the process of being replaced; B. (9:34 a.m.) Penthouse west door was damaged and would not close and latch in the frame. The facility provided an invoice that indicated that the door was in the process of being replaced; Interview with the director of plant operations and maintenance technician on February 28, 2024, at 9:34 a.m., confirmed the door deficiencies.”
-
Exit Signage
The inspectors’ words, 149 words
“Exit Signage CFR(s): NFPA 101 Exit Signage 2012 EXISTING Exit and directional signs are displayed in accordance with 7.10 with continuous illumination also served by the emergency lighting system. 19.2.10.1 (Indicate N/A in one-story existing occupancies with less than 30 occupants where the line of exit travel is obvious.) This Standard is not met as evidenced by: 49939 Based on observation and interview, the facility failed to maintain two of more than twenty-five emergency exit signs. Observation on February 22, 2024, between 9:38 a.m. and 11:30 a.m., revealed the following exit sign deficiencies: A. (9:38 a.m.) Fourth floor elevator B lobby had a directional exit sign that lacked illumination; B. (11:30 a.m.) First-floor corridor from the elevator lobby to the back of the building (north side) lacked an illuminated directional exit sign. Interview with the maintenance technician on February 22, 2024, at 11:30 a.m., confirmed the exit sign deficiencies.”
-
Vertical Openings - Enclosure
The inspectors’ words, 196 words
“Vertical Openings - Enclosure CFR(s): NFPA 101 Vertical Openings - Enclosure 2012 EXISTING Stairways, elevator shafts, light and ventilation shafts, chutes, and other vertical openings between floors are enclosed with construction having a fire resistance rating of at least 1 hour. An atrium may be used in accordance with 8.6. 19.3.1.1 through 19.3.1.6 If all vertical openings are properly enclosed with construction providing at least a 2-hour fire resistance rating, also check this box. This Standard is not met as evidenced by: 49939 Based on observation and interview, the facility failed to maintain vertical openings in four of eight vertical shafts. Findings include: Observation on February 22, 2024, between 9:46 a.m. and 10:30 a.m., revealed the following vertical shaft doors failed to close and latch in the frame: A. (9:46 a.m.) Fourth-floor shaft door, located next to the east nurses’ station; B. (9:57 a.m.) Fourth-floor west corridor had two vertical shaft doors that were adjusted to properly close and latch at the time of the survey; C. (10:30 a.m.) Third floor shaft door, located between rooms 304 and 305. Interview with the maintenance technician on February 22, 2024, at 10:30 a.m., confirmed the vertical door deficiencies.”
All 5 inspections in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Jul 17, 2025 | Complaint inspection | No deficiencies cited |
| Mar 25, 2025 | Complaint inspection | 3 deficiencies cited |
| Jan 23, 2025 | Complaint inspection | No deficiencies cited |
| Apr 10, 2024 | Complaint inspection | No deficiencies cited |
| Feb 28, 2024 | Complaint inspection | 5 deficiencies cited |
How do patients fare?
- 19.58% of its patients returned home or to the community: no different than the national rate, as CMS compares it (Oct 1, 2023 to Sep 30, 2025).
- Compared by CMS: potentially preventable readmissions within 30 days after discharge, no different than the national rate (19.07%); catheter urinary tract infections (CAUTI), no different than the national benchmark (standardized infection ratio 1.792); central line bloodstream infections (CLABSI), no comparison (standardized infection ratio 0); C. diff infections, better than the national benchmark (standardized infection ratio 0.091).
- As CMS gives them: patients with one or more falls with major injury, 0%; patients with new or worsened pressure ulcers or injuries, 6.72%; patients successfully weaned from a ventilator, 63.96%; patients at or above an expected ability to care for themselves and move around at discharge, 46.12%; Medicare spending per patient (1 is the national median), 0.99.
CMS, Long-Term Care Hospital - Provider Data. Released Sep 23, 2026. Updated quarterly.
Is it certified?
- Medicare-certified long-term care hospital since Jun 1, 2001.
- Ownership: for profit.
- It is accredited by The Joint Commission, whose surveys stand in for the state’s routine inspections.
- Cited at For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. in the last three years: it didn’t meet a whole condition of Medicare’s rules for hospitals.
- For profit.
CMS, Long-Term Care Hospital - General Information. Released Sep 23, 2026. Updated quarterly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for these facilities.
- 8 deficiencies cited in the last three years came from inspections that included a complaint investigation.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Who does the caring?
- CMS doesn’t publish staffing levels for these facilities.
- 77.78% of its health care workers got a flu shot (Oct 1, 2024 to Mar 31, 2025).
CMS, Long-Term Care Hospital - Provider Data. Released Sep 23, 2026. Updated quarterly.
Who owns it?
- Select Specialty Hospitals Inc. owns 100% directly since Jun 1, 2011.
- Select Medical Corporation runs it.
- 10 owners or officers are people: Thomas Mullin (corporate officer); John Saich (corporate officer); Robert Breighner (managing employee (on the payroll)); Michael Malatesta (corporate officer); Robert Kido (corporate officer); John Duemmel (corporate officer); John Duemmel (managing employee (on the payroll)); John Duemmel (runs it (operational or managerial control)); John Duggan (corporate officer, 0%); John Duggan (corporate director).
- CMS’s Provider of Services file records no change of ownership.
- No private-equity firm among the owners CMS lists.
- No real-estate investment trust among the owners CMS lists.
CMS, Hospital All Owners and Hospital Enrollments. Released Sep 29, 2026. Updated monthly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
| Organisation | Role | Share | Since |
|---|---|---|---|
| Select Medical Corporation | Owns 5% or more through other companies | 100% | Jun 1, 2011 |
| Select Medical Corporation | Runs it (operational or managerial control) | 100% | Jun 1, 2001 |
| Select Specialty Hospitals Inc. | Owns 5% or more directly | 100% | Jun 1, 2011 |
How does it compare nearby?
- No other long-term care hospital CMS lists is in Erie County.
CMS, Long-Term Care Hospital - Provider Data. Released Sep 23, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for inpatient rehabilitation facilities or long-term care hospitals, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- Many of these facilities are accredited by a private organisation (The Joint Commission, DNV and others) whose routine inspections stand in for the state’s; those reports aren’t public, and QCOR holds only the state’s surveys: no inspection on record here doesn’t mean none took place.
- QCOR says its hospital inspection data are complete only through September 17, 2026, while it moves to a new system.
- CMS doesn’t publish staffing levels for these facilities.
Sources
-
Centers for Medicare & Medicaid Services, Long-Term Care Hospital - General Information (azum-44iv).
Released Sep 23, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Long-Term Care Hospital - Provider Data (fp6g-2gsn).
Released Sep 23, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Provider of Services File - Hospital & Non-Hospital Facilities (Hospital_and_other.DATA.Q3_2026.csv).
Released Oct 14, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Hospital 2567 statements of deficiencies (Hospital_2567s_2010_to_2026YTD.xlsx).
Released Oct 20, 2026 and checked Oct 27, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital All Owners (Hospital_All_Owners_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital Enrollments (Hospital_Enrollments_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Nov 5, 2026.
From the facility
The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.