Childress Regional Medical Center
An acute care hospital in Childress, Texas 79201
Hwy 83 North, Childress, Texas 79201. (940) 937-6371.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 20, 2026.
- Not rated CMS’s overall rating
- Not rated patient survey rating
- 7 deficiencies cited in the last three years
- 39 beds
Each figure’s source sits beside it, in its section below.
What these words mean2
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Jul 29, 2026: a standard inspection.
7 deficiencies cited in the last three years.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
When those deficiencies happened
7 deficiencies in 2 months of the last 36. Last cited Jul 2026. Most serious: Standard-level. The last 3 years, to Nov 5, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Dec | |||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Jul 29, 2026: standard inspection5 deficiencies
-
Initial Comments - Not A Deficiency Citation
The inspectors’ words, 213 words
“. An on-site Life Safety Code (LSC) Recertification Survey was conducted on 07/29/2026. An entrance conference was held for the Director of Maintenance, the Chief Operating Officer, and the Chief Executive Officer on the morning of 07/29/2026 to discuss the purpose of the LSC survey and the survey process was explained. Instructions were provided on writing plans of correction. An opportunity was provided for questions and discussion. The LSC survey was conducted under the authority of Chapter 2 of the State Operations Manual, Appendix A, Acute Care Hospitals, 42CFR482 to determine the Hospital ’ s compliance. An LSC exit conference was conducted on 07/29/2026 with Director of Maintenance and the Chief Executive Officer. The preliminary findings of the survey and the next steps in the survey process were explained. An opportunity was provided for questions and discussion. Note: The CMS-2567 (Statement of Deficiencies) is an official, legal document. All information must remain unchanged except for entering the plan of correction, correction dates, and the signature space. Any discrepancy in the original deficiency citation(s) will be reported to the Dallas Regional Office (RO) for referral to the Office of the Inspector General (OIG) for possible fraud. If information is inadvertently changed by the provider/supplier, the State Survey Agency (SA) should be notified immediately. .”
-
Subdivision Of Building Spaces - Smoke Barrie
The inspectors’ words, 415 words
“Subdivision of Building Spaces - Smoke Barrie CFR(s): NFPA 101 Subdivision of Building Spaces - Smoke Barrier Construction 2012 EXISTING Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier. 19.3.7.3, 8.6.7.1(1) Describe any mechanical smoke control system in REMARKS. This Standard is not met as evidenced by: 35939 . K 372 Based on observations and interviews, the facility failed to maintain smoke barrier walls to resist the passage of smoke as required by NFPA 101, Life Safety Code, 19.3.7 and 8.5. This deficient practice could result in failure to contain toxic products of combustion to all smoke compartments, thus placing the patients, staff, and visitors of multiple smoke compartments in jeopardy in the event of a fire. The inspector observed, while accompanied by the Director of Maintenance and the Chief Executive Officer on 07/29/2026 from 1:10 AM to 1:50 PM, smoke barriers had unsealed penetrations, penetrations sealed with materials of unknown fire resistivity, penetrations sealed in a manner not consistent with firestopping systems/industry standards/manufacturer’s recommendations at the following locations: 1) The smoke barrier wall by Pharmacy and MRI. 2) The smoke barrier wall by 609 Central Clean-Up, OR, Surgical Services. 3) The smoke barrier wall by Nurses Station at Back of OR going into Labor and Delivery. Verify ALL rated construction is free of defects. In an interview at the time of each finding, the Director of Maintenance was informed of each deficiency, and he was able to observe the deficiencies. Code Reference(s): NFPA 101, 2012 edition 19.3.7.3 Any required smoke barrier shall be constructed in accordance with Section 8.5 and shall have a minimum 1/2-hour fire resistance rating, unless otherwise permitted by one of the following: (1) This requirement shall not apply where an atrium is used, and both of the following criteria also shall apply: (a) Smoke barriers shall be permitted to terminate at an atrium wall constructed in accordance with 8.6.7(1)(c). (b) Not less than two separate smoke compartments shall be provided on each floor. (2) Smoke dampers shall not be required in duct penetrations of smoke barriers in fully ducted heating, ventilating, and air-conditioning systems where an approved, supervised automatic sprinkler system in accordance with 19.3.5.8 has been provided for smoke compartments adjacent to the smoke barrier. .”
-
Evacuation And Relocation Plan
The inspectors’ words, 248 words
“Evacuation and Relocation Plan CFR(s): NFPA 101 Evacuation and Relocation Plan There is a written plan for the protection of all patients and for their evacuation in the event of an emergency. Employees are periodically instructed and kept informed with their duties under the plan, and a copy of the plan is readily available with telephone operator or with security. The plan addresses the basic response required of staff per 18/19.7.2.1.2 and provides for all of the fire safety plan components per 18/19.2.2. 18.7.1.1 through 18.7.1.3, 18.7.2.1.2, 18.7.2.2, 18.7.2.3, 19.7.1.1 through 19.7.1.3, 19.7.2.1.2, 19.7.2.2, 19.7.2.3 This Standard is not met as evidenced by: 35939 . K-711 Based on record review and interview, the facility failed to produce an updated copy of a written plan for the protection of all patients and for their evacuation in the event of an emergency in accordance with NFPA 101, 2012 edition, 19.7.2.1.2 and 19.2.2. The facility did not have an updated printed copy of a written evacuation plan. This deficient practice could result in a delayed evacuation in the event of an emergency, exposing patients to smoke inhalation, or other fire related injuries. Findings included: Record Review of the printed Disaster Procedure Manual presented by the CEO included sections/pages with outdated effective dates, including the “Medical Staff Department Directors & Committees” with an effective date of 10/01/2022 through 09/30/2024. In an interview on 07/29/2026 at approximately 1:55 PM the CEO was informed of the outdated material within the Disaster Procedures Manual. .”
-
Gas And Vacuum Piped Systems - Maintenance Pr
The inspectors’ words, 218 words
“Gas and Vacuum Piped Systems - Maintenance Pr CFR(s): NFPA 101 Gas and Vacuum Piped Systems - Maintenance Program Medical gas, vacuum, WAGD, or support gas systems have documented maintenance programs. The program includes an inventory of all source systems, control valves, alarms, manufactured assemblies, and outlets. Inspection and maintenance schedules are established through risk assessment considering manufacturer recommendations. Inspection procedures and testing methods are established through risk assessment. Persons maintaining systems are qualified as demonstrated by training and certification or credentialing to the requirements of AASE 6030 or 6040. 5.1.14.2.1, 5.1.14.2.2, 5.1.15, 5.2.14, 5.3.13.4.2 (NFPA 99) This Standard is not met as evidenced by: 35939 . K-907 Based on record review and interviews, the facility failed to ensure the medical gas system was maintained free of deficiencies. The medical gas system maintenance reports indicated there was an issue with the Medical Air Purity Test’s Dew Point. This deficient practice could expose patients to a faulty medical gas system. Findings included: Record review of the 2024 and 2025 “Annual Medical Gas & Vacuum Systems, Pipeline, and Equipment Inspection” report indicated the Medical Air Purity Test’s Dew Point had failed in both consecutive years. In an interview at the time of the record review, the Director of Maintenance was made aware of the failed item in the reports. .”
-
Electrical Systems - Maintenance And Testing
The inspectors’ words, 534 words
“Electrical Systems - Maintenance and Testing CFR(s): NFPA 101 Electrical Systems - Maintenance and Testing Hospital-grade receptacles at patient bed locations and where deep sedation or general anesthesia is administered, are tested after initial installation, replacement or servicing. Additional testing is performed at intervals defined by documented performance data. Receptacles not listed as hospital-grade at these locations are tested at intervals not exceeding 12 months. Line isolation monitors (LIM), if installed, are tested at intervals of less than or equal to 1 month by actuating the LIM test switch per 6.3.2.6.3.6, which activates both visual and audible alarm. For LIM circuits with automated self-testing, this manual test is performed at intervals less than or equal to 12 months. LIM circuits are tested per 6.3.3.3.2 after any repair or renovation to the electric distribution system. Records are maintained of required tests and associated repairs or modifications, containing date, room or area tested, and results. 6.3.4 (NFPA 99) This Standard is not met as evidenced by: 35939 . K 914 Based on record review and interview, the facility failed to ensure hospital-grade AND non-hospital-grade receptacles at patient care locations were tested as required and records were maintained and available for review. There were no records available indicating receptacles in patient care areas have ever been tested. This deficient practice could result in receptacle malfunction in patient care areas, exposing patients to electrical shocks, smoke inhalation or other fire related injuries. Observations included: Record review during the inspection revealed there was no report to review inspection of electrical receptacles in all patient care areas. In an interview after the record review, the Director of Maintenance was informed of the missing document, and he was unable to provide any additional documentation indicating receptacles in patient care areas had been tested. Reference(s): NFPA 99, 2012 edition 6.3.4 Administration of Electrical System. 6.3.4.1 Maintenance and Testing of Electrical System. 6.3.4.1.1 Where hospital-grade receptacles are required at patient bed locations and in locations where deep sedation or general anesthesia is administered, testing shall be performed after initial installation, replacement, or servicing of the device. 6.3.4.1.2 Additional testing of receptacles in patient care rooms shall be performed at intervals defined by documented performance data. 6.3.4.1.3 Receptacles not listed as hospital-grade, at patient bed locations and in locations where deep sedation or general anesthesia is administered, shall be tested at intervals not exceeding 12 months. 6.3.4.1.4 The LIM circuit shall be tested at intervals of not more than 1 month by actuating the LIM test switch (see 6.3.2.6.3.6). For a LIM circuit with automated self-test and self-calibration capabilities, this test shall be performed at intervals of not more than 12 months. Actuation of the test switch shall activate both visual and audible alarm indicators. 6.3.4.1.5 After any repair or renovation to an electrical distribution system, the LIM circuit shall be tested in accordance with 6.3.3.3.2. 6.3.4.2 Record Keeping. 6.3.4.2.1* General. 6.3.4.2.1.1 A record shall be maintained of the tests required by this chapter and associated repairs or modification. 6.3.4.2.1.2 At a minimum, the record shall contain the date, the rooms or areas tested, and an indication of which items have met, or have failed to meet, the performance requirements of this chapter. .”
Jun 9, 2026: standard inspection2 deficiencies
-
Compliance With Laws
The inspectors’ words, 304 words
“COMPLIANCE WITH LAWS CFR(s): 482.11(a) The hospital must be in compliance with applicable Federal laws related to the health and safety of patients. This Standard is not met as evidenced by: 31690 Based on review of facility documents and staff interview, the facility failed to comply with local and state laws related to Title 26 505.141(g) to conduct at least 12 fire drills each year, one drill per shift per quarter, which shall include communication of alarms, simulation of evacuation and the use of fire fighting equipment. Findings were: Review of the faciity provided fire drill documentation reflected fire drills were conducted during the day shift in January, February, March, April and May 2026. There was no documentation of drills provided on the night shift. During an interview on the morning of 6/10/26, Staff #4, the Maintenance Director stated “There are 2 shifts at the hospital. 7 am to 7 pm and 7 pm to 7 am. I do four (4) fire drills on night shift per year and I do eight (8) fire drills on day shift per year. I do 12 fire drills a year and I make sure I do four (4) of them on the night shift every year.” Review of the facility policy titield “Fire Warning and Safety” effective 7/6/22 reflected in part, “...1. Hospital shall conduct at least 12 fire drills each year, one fire drill per shift per quarter, which shall include communication of alarms, simulation of evacuation of patients and other occupants, and use of fire fighting equipment...” Staff #4 confirmed there have been 0 fire drills conducted on night shift in 2026. Staff #4 confirmed there have been 5 fire drills completed in 2026 on the day shift. One in January, one in February, one in March, one in April and one in May, 2026.”
-
Facilities, Supplies, Equipment Maintenance
The inspectors’ words, 366 words
“FACILITIES, SUPPLIES, EQUIPMENT MAINTENANCE CFR(s): 482.41(c)(2) Facilities, supplies, and equipment must be maintained to ensure an acceptable level of safety and quality. This Standard is not met as evidenced by: 31690 Based on observation, interview, and record review the facility failed to ensure that the facility, supplies, and equipment were maintained to ensure an acceptable level of safety and quality. Both open supplies and supplies in the shipping corrugated boxes were observed in the large storage room. This could result in the clean open boxes contaminated by the corrugated card boxes that were shipped in to the facility. Findings included: In an article published by Spectrum Health in July 2014 it was stated “The heavier corrugated cardboard shipping boxes might harbor vermin or insects and spread the pests to areas where the boxes are stored after delivery. Corrugated cardboard boxes are not appropriate as storage units in medical or clean supply rooms. These boxes are not appropriate because they are an excellent harbor for insects and pests.” According to APIC: “Supplies must be: Removed from shipping cartons or cardboard boxes before storage to prevent contamination with soil/debris that may be on cartons ...Do not leave outer shipping boxes in clinical areas (due to risk of environmental contamination).” Preventing Infection in Ambulatory Care, Winter 2011/2012; available: http://apic.org/Resource_/TinyMecFileManager/Education/Preventing-In-in-Amb-Care-Winter2012-FINAL.PDF. Review of the facility policy Supply Receiving procedures Shelving Standards, last updated 6/1/2022 reflected the following: “ ... Shelving Standards: All supplies must be stored off the floor. Heavy-duty pallets or shelving units must keep items a minimum of 8 to 10 inches above the floor and at least 18 inches below ceiling sprinkler heads. Segregation: Clean and sterile supplies must be separated from soiled or hazardous materials ...” During a tour of the supply storage area on the afternoon of 06/9/26 multiple external shipping boxes, some still with the shipping labels, were observed stored on storage racks. There were also boxes of supplies on the shelving. Storage of supplies in this manner could potentially allow for dirt, debris, and pests from the outside shipping containers to contaminate supplies stored nearby. Staff # 23 verified these findings and reported that no outside shipping containers should be in the storage area.”
All 2 inspections in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Jul 29, 2026 | Standard inspection | 5 deficiencies cited |
| Jun 9, 2026 | Standard inspection | 2 deficiencies cited |
How do patients fare?
- CMS gives no overall CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.: “There are too few measures or measure groups reported to calculate a star rating or measure group score.”
- Of the measures behind its CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System., CMS counts against the national value: mortality, 0 better and 0 worse of 2; safety of care, 0 better and 0 worse of 2; readmission, 1 better and 0 worse of 5.
- CMS gives no CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.: “The number of cases/patients is too few to report a star rating.”
- In CMS’s patient survey (Oct 1, 2024 to Sep 30, 2025): 96% rated it 9 or 10 out of 10, and 94% would definitely recommend it.
- CMS’s patient safety composite for serious complications, PSI 90, Jul 1, 2022 to Jun 30, 2024: no different than the national value.
- Deaths within 30 days, as CMS gives them (Jul 1, 2022 to Jun 30, 2025): pneumonia 13.3%, COPD 9.9%. CMS gives no comparison with the national rate for them in this release.
- Readmissions within 30 days, as CMS gives them (Jul 1, 2023 to Jun 30, 2025): heart failure 21.4%, pneumonia 17%, COPD 19.2%. CMS gives no comparison with the national rate for them in this release.
- After outpatient care, compared by CMS: unplanned hospital visits after a colonoscopy, no different than the national rate.
- Emergency department patients spent a median of 119 minutes there before leaving (Oct 1, 2024 to Sep 30, 2025), and 0% left before being seen.
- 38% of patients with severe sepsis or septic shock got the care CMS measures, SEP-1 (Oct 1, 2024 to Sep 30, 2025).
- Medicare’s spending per patient here is 1.05 times the national median (Jan 1, 2024 to Dec 31, 2024).
CMS, Hospital General Information, Patient survey (HCAHPS) - Hospital, Healthcare Associated Infections - Hospital, Timely and Effective Care - Hospital and Medicare Spending Per Beneficiary - Hospital. Released Aug 13, 2026. Updated quarterly.
CMS, Complications and Deaths - Hospital and Unplanned Hospital Visits - Hospital. Released Sep 30, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Overall ratingCMS’s overall hospital quality star rating, 1 to 5 | Not rated |
| Patient survey ratingCMS star rating from its survey of the hospital’s patients (HCAHPS), 1 to 5 | Not rated |
Is it certified, and in good standing?
- Medicare-certified acute care hospital since Jul 1, 1966.
- Ownership: government - hospital district or authority.
- It is not accredited by a private organisation, so the state carries out its routine inspections for Medicare.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Government - Hospital District or Authority.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for hospitals.
- Not among the hospitals whose Medicare payments CMS cut under the Hospital-Acquired Condition Reduction Program for fiscal year 2026.
- None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
CMS, Hospital-Acquired Condition (HAC) Reduction Program. Released Aug 13, 2026. Updated yearly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
What do patients say about their care?
- CMS doesn’t publish staffing levels for hospitals.
- 89% of its health care workers got a flu shot (Oct 1, 2024 to Mar 31, 2025).
CMS, Patient survey (HCAHPS) - Hospital and Timely and Effective Care - Hospital. Released Aug 13, 2026. Updated quarterly.
Who owns it?
- Childress County Hospital District runs it.
- 4 owners or officers are people: Emilee Stratton (corporate officer); Emilee Stratton (managing employee (on the payroll)); Holly Holcomb (corporate officer); Holly Holcomb (managing employee (on the payroll)).
- CMS’s Provider of Services file records no change of ownership.
- No private-equity firm among the owners CMS lists.
- No real-estate investment trust among the owners CMS lists.
CMS, Hospital All Owners and Hospital Enrollments. Released Sep 29, 2026. Updated monthly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
How does it compare nearby?
- No other hospital CMS lists is in Childress County.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for hospitals, so none are shown. The one payment cut CMS publishes for each hospital, under its Hospital-Acquired Condition Reduction Program, is shown where it applies.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- Most hospitals are accredited by a private organisation (The Joint Commission, DNV and others) whose routine inspections stand in for the state’s; those reports aren’t public, and QCOR holds only the state’s surveys: no inspection on record here doesn’t mean none took place.
- QCOR says its hospital inspection data are complete only through September 17, 2026, while it moves to a new system.
- CMS doesn’t publish staffing levels for hospitals.
- In its September 2026 release CMS gives no comparison with the national rate for death and readmission rates, though it gives the rates.
Sources
-
Centers for Medicare & Medicaid Services, Hospital General Information (xubh-q36u).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (HCAHPS) - Hospital.
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Healthcare Associated Infections - Hospital (77hc-ibv8).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Complications and Deaths - Hospital (ynj2-r877).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Unplanned Hospital Visits - Hospital (632h-zaca).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Timely and Effective Care - Hospital (yv7e-xc69).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Medicare Spending Per Beneficiary - Hospital (rrqw-56er).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital-Acquired Condition (HAC) Reduction Program (yq43-i98g).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated yearly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Provider of Services File - Hospital & Non-Hospital Facilities (Hospital_and_other.DATA.Q3_2026.csv).
Released Oct 14, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Hospital 2567 statements of deficiencies (Hospital_2567s_2010_to_2026YTD.xlsx).
Released Oct 20, 2026 and checked Oct 27, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital All Owners (Hospital_All_Owners_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital Enrollments (Hospital_Enrollments_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Nov 5, 2026.
From the hospital
The public record above comes first. Anything the hospital adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the hospital will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the hospital”, and paying will never change a finding, a rating or the order of results.