The short answer

Record last released by CMS on Oct 20, 2026.

The last 24 months 6 deficiencies in 1 month of the last 36. Last cited Nov 2025. Most serious: Standard-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean2
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.

What did inspectors find?

The last inspection on record was on Aug 12, 2026: a complaint inspection.

6 deficiencies cited in the last three years.

Source:

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

When those deficiencies happened

6 deficiencies in 1 month of the last 36. Last cited Nov 2025. Most serious: Standard-level. The last 3 years, to Nov 5, 2026.

6 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 Dec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOctNov

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

Nov 17, 2025: standard inspection6 deficiencies
  • Local, State, Tribal Collaboration Process

    The inspectors’ words, 289 words

    “Local, State, Tribal Collaboration Process CFR(s): §403.748(a)(4), §416.54(a)(4), §418.113(a)(4), §441.184(a)(4), §460.84(a)(4), §482.15(a)(4), §483.73(a)(4), §483.475(a)(4), §484.102(a)(4), §485.68(a)(4), §485.542(a)(4), §485.625(a)(4), §485.727(a)(5), §485.920(a)(4), §486.360(a)(4), §491.12(a)(4), §494.62(a)(4) [(a) Emergency Plan. The [facility] must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least every 2 years [annually for LTC facilities]. The plan must do the following:] (4) Include a process for cooperation and collaboration with local, tribal, regional, State, and Federal emergency preparedness officials’ efforts to maintain an integrated response during a disaster or emergency situation. * * [For ESRD facilities only at §494.62(a)(4)]: (4) Include a process for cooperation and collaboration with local, tribal, regional, State, and Federal emergency preparedness officials’ efforts to maintain an integrated response during a disaster or emergency situation. The dialysis facility must contact the local emergency preparedness agency at least annually to confirm that the agency is aware of the dialysis facility’s needs in the event of an emergency. This Standard is not met as evidenced by: 36414 Based on record review, the facility failed to include a process for cooperation and collaboration with local, tribal, regional, state, and federal Emergency Preparedness (EP) officials in efforts to maintain an integrated response during a disaster or emergency situation, including documentation of the facility’s efforts to contact such officials and, when applicable, of its participation in collaborative and cooperative planning efforts. The finding included: Record review of the facility’s Emergency Preparedness plan on 11/17/25 at 11:00 AM, revealed the facility failed to document it’s efforts to contact emergency preparedness officials and, when applicable, participate in collaborative and cooperative emergency planning efforts. This finding was verified by the maintenance director during the survey and was acknowledged by the administrator during the exit conference on 11/17/25.”

    Rule E0009. Standard-level.

  • Ep Testing Requirements

    The inspectors’ words, 2,036 words

    “EP Testing Requirements CFR(s): §416.54(d)(2), §418.113(d)(2), §441.184(d)(2), §460.84(d)(2), §482.15(d)(2), §483.73(d)(2), §483.475(d)(2), §484.102(d)(2), §485.68(d)(2), §485.542(d)(2), §485.625(d)(2), §485.727(d)(2), §485.920(d)(2), §491.12(d)(2), §494.62(d)(2). *[For ASCs at §416.54, CORFs at §485.68, REHs at §485.542, OPO, “Organizations” under §485.727, CMHCs at §485.920, RHCs/FQHCs at §491.12, and ESRD Facilities at §494.62]: (2) Testing. The [facility] must conduct exercises to test the emergency plan annually. The [facility] must do all of the following: (i) Participate in a full-scale exercise that is community-based every 2 years; or (A) When a community-based exercise is not accessible, conduct a facility-based functional exercise every 2 years; or (B) If the [facility] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required community-based or individual, facility-based functional exercise following the onset of the actual event. (ii) Conduct an additional exercise at least every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or individual, facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the [facility’s] response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [facility’s] emergency plan, as needed. *[For Hospices at 418.113(d):] (2) Testing for hospices that provide care in the patient’s home. The hospice must conduct exercises to test the emergency plan at least annually. The hospice must do the following: (i) Participate in a full-scale exercise that is community based every 2 years; or (A) When a community based exercise is not accessible, conduct an individual facility based functional exercise every 2 years; or (B) If the hospice experiences a natural or man-made emergency that requires activation of the emergency plan, the hospital is exempt from engaging in its next required full scale community-based exercise or individual facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or a facility based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (3) Testing for hospices that provide inpatient care directly. The hospice must conduct exercises to test the emergency plan twice per year. The hospice must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual facility-based functional exercise; or (B) If the hospice experiences a natural or man-made emergency that requires activation of the emergency plan, the hospice is exempt from engaging in its next required full-scale community based or facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional annual exercise that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or a facility based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop led by a facilitator that includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the hospice’s response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the hospice’s emergency plan, as needed. *[For PRFTs at §441.184(d), Hospitals at §482.15(d), CAHs at §485.625(d):] (2) Testing. The [PRTF, Hospital, CAH] must conduct exercises to test the emergency plan twice per year. The [PRTF, Hospital, CAH] must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or (B) If the [PRTF, Hospital, CAH] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an [additional] annual exercise or and that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or individual, a facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the [facility’s] response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the [facility’s] emergency plan, as needed. *[For PACE at §460.84(d):] (2) Testing. The PACE organization must conduct exercises to test the emergency plan at least annually. The PACE organization must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or (B) If the PACE experiences an actual natural or man-made emergency that requires activation of the emergency plan, the PACE is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional exercise every 2 years opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or individual, a facility based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the PACE’s response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the PACE’s emergency plan, as needed. *[For LTC Facilities at §483.73(d):] (2) The [LTC facility] must conduct exercises to test the emergency plan at least twice per year, including unannounced staff drills using the emergency procedures. The [LTC facility, ICF/IID] must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise. (B) If the [LTC facility] facility experiences an actual natural or man-made emergency that requires activation of the emergency plan, the LTC facility is exempt from engaging its next required a full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional annual exercise that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or an individual, facility based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the [LTC facility] facility’s response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [LTC facility] facility’s emergency plan, as needed. *[For ICF/IIDs at §483.475(d)]: (2) Testing. The ICF/IID must conduct exercises to test the emergency plan at least twice per year. The ICF/IID must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or. (B) If the ICF/IID experiences an actual natural or man-made emergency that requires activation of the emergency plan, the ICF/IID is exempt from engaging in its next required full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional annual exercise that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the ICF/IID’s response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the ICF/IID’s emergency plan, as needed. *[For HHAs at §484.102] (d)(2) Testing. The HHA must conduct exercises to test the emergency plan at least annually. The HHA must do the following: (i) Participate in a full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise every 2 years; or. (B) If the HHA experiences an actual natural or man-made emergency that requires activation of the emergency plan, the HHA is exempt from engaging in its next required full-scale community-based or individual, facility based functional exercise following the onset of the emergency event. (ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the HHA’s response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the HHA’s emergency plan, as needed. *[For OPOs at §486.360] (d)(2) Testing. The OPO must conduct exercises to test the emergency plan. The OPO must do the following: (i) Conduct a paper-based, tabletop exercise or workshop at least annually. A tabletop exercise is led by a facilitator and includes a group discussion, using a narrated, clinically relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. If the OPO experiences an actual natural or man-made emergency that requires activation of the emergency plan, the OPO is exempt from engaging in its next required testing exercise following the onset of the emergency event. (ii) Analyze the OPO’s response to and maintain documentation of all tabletop exercises, and emergency events, and revise the [RNHCI’s and OPO’s] emergency plan, as needed. *[ RNCHIs at §403.748]: (d)(2) Testing. The RNHCI must conduct exercises to test the emergency plan. The RNHCI must do the following: (i) Conduct a paper-based, tabletop exercise at least annually. A tabletop exercise is a group discussion led by a facilitator, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (ii) Analyze the RNHCI’s response to and maintain documentation of all tabletop exercises, and emergency events, and revise the RNHCI’s emergency plan, as needed. This Standard is not met as evidenced by: 36414 Based on record review, the facility failed to conduct and document exercises to test the emergency plan. The finding included: Record review of the facility’s Emergency Preparedness plan on 11/17/25 at 11:00 AM, revealed the facility had not conducted two (2) full-scale drills or (1) full-scale drill and (1) table-top exercises involving local, state, or federal officials that tested elements of the facility’s EP Plan. This finding was verified by the maintenance director during the survey and was acknowledged by the administrator during the exit conference on 11/17/25.”

    Rule E0039. Standard-level.

  • Initial Comments - Not A Deficiency Citation

    “Stories: 1 Construction Type: II (000) Constructed: 2010 Sprinklered: Yes A Life Safety Code Survey was conducted by the Tennessee Health Facilities Commission on 11/17/2025. During this Life Safety Code Survey, Unity Phychiatric Care was found not in substantial compliance with the requirements for participation in Medicare/Medicaid Title 42 CFR Subpart 482.41 (b), Life Safety from Fire, and the related National Fire Protection Association (NFPA) 101 Life Safety Code (2012 Edition). The requirement at 42 (CFR), Subpart 482.41 (b) is NOT met as evidenced by:”

    Rule K0000. Standard-level.

  • Exit Signage

    The inspectors’ words, 139 words

    “Exit Signage CFR(s): NFPA 101 Exit Signage 2012 EXISTING Exit and directional signs are displayed in accordance with 7.10 with continuous illumination also served by the emergency lighting system. 19.2.10.1 (Indicate N/A in one-story existing occupancies with less than 30 occupants where the line of exit travel is obvious.) This Standard is not met as evidenced by: 36414 Based on record review, the facility failed to maintain the exit signs. The finding included: Record review on 11/17/2025 at 10:30 AM, revealed the facility failed to provide documentation for the annual 90 min testing on the exit signs. National Fire Protection Association NFPA 101, 19.2.10.1 (2012 Ed), NFPA 101, 7.10.9.2 (2012 Ed), NFPA 101, 7.9.3.1.1 (3) (2012 Ed) This finding was verified by the maintenance director during the survey and was acknowledged by administrator during the exit conference on 11/17/2025.”

    Rule K0293. Standard-level.

  • Maintenance, Inspection And Testing - Doors

    The inspectors’ words, 182 words

    “Maintenance, Inspection & Testing - Doors CFR(s): Maintenance, Inspection & Testing - Doors Fire doors assemblies are inspected and tested annually in accordance with NFPA 80, Standard for Fire Doors and Other Opening Protectives. Non-rated doors, including corridor doors to patient rooms and smoke barrier doors, are routinely inspected as part of the facility maintenance program. Individuals performing the door inspections and testing possess knowledge, training or experience that demonstrates ability. Written records of inspection and testing are maintained and are available for review. 19.7.6, 8.3.3.1 (LSC) 5.2, 5.2.3 (2010 NFPA 80) This Standard is not met as evidenced by: 36414 Based on record review, the facility failed to maintain the fire doors. The finding included: Record review on 11/17/2025 at 10:35 AM, revealed the facility failed to provide documentation for the annual fire door inspection. National Fire Protection Association NFPA 101, 19.7.6 (2012 Ed), NFPA 101, 4.6.12.1 (2012 Ed), NFPA 101, 8.3.3.1 (2012 Ed), NFPA 80, 5.2.1 (2010 Ed) This finding was verified by the maintenance director during the survey and was acknowledged by administrator during the exit conference on 11/17/2025.”

    Rule K0761. Standard-level.

  • Electrical Systems - Essential Electric Syste

    The inspectors’ words, 317 words

    “Electrical Systems - Essential Electric Syste CFR(s): NFPA 101 Electrical Systems - Essential Electric System Maintenance and Testing The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110. Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations. 6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) This Standard is not met as evidenced by: 36414 Based on record review, the facility failed to maintain the emergency generator. The finding included: Record review on 11/17/2025 at 10:40 AM, revealed the facility failed to provide documentation for the annual load bank testing of the emergency generator. National Fire Protection Association NFPA 101, 19.5.1.1 (2012 Ed), NFPA 101, 9.1.3.1 (2012 Ed), NFPA 110, 8.4.2.3 (2010 Ed) This finding was verified by the maintenance director during the survey and was acknowledged by administrator during the exit conference on 11/17/2025.”

    Rule K0918. Standard-level.

All 9 inspections in the last three years
Inspections on record
DateVisitWhat the record says
Aug 12, 2026Complaint inspectionNo deficiencies cited
Apr 6, 2026Complaint inspectionNo deficiencies cited
Nov 19, 2025Standard inspectionNo deficiencies cited
Nov 19, 2025Complaint inspectionNo deficiencies cited
Nov 17, 2025Standard inspection6 deficiencies cited
Oct 9, 2025Complaint inspectionNo deficiencies cited
Feb 24, 2025Complaint inspectionNo deficiencies cited
Sep 23, 2024Complaint inspectionNo deficiencies cited
Sep 19, 2024Complaint inspectionNo deficiencies cited

How do patients fare?

  • CMS gives no overall : “Data are shown only for hospitals that participate in the Inpatient Quality Reporting (IQR) and Outpatient Quality Reporting (OQR) programs.”
  • CMS publishes no patient survey results for it.
Ratings and measures, as published
MeasureRating
Overall ratingCMS’s overall hospital quality star rating, 1 to 5Not rated
Patient survey ratingCMS star rating from its survey of the hospital’s patients (HCAHPS), 1 to 5Not rated

Is it certified, and in good standing?

  • Medicare-certified psychiatric hospital since Aug 19, 2010.
  • Ownership: proprietary.
  • It is not accredited by a private organisation, so the state carries out its routine inspections for Medicare.
  • No deficiency on record in the last three years.
  • Proprietary.
Source:

CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.

CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

Has it been penalized?

  • CMS doesn’t publish fines or other penalties for hospitals.
  • CMS’s HAC Reduction Program file has no result for it: the program covers general acute care hospitals Medicare pays under its inpatient prospective payment system.
  • None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
Source:

CMS, Hospital-Acquired Condition (HAC) Reduction Program. Released Aug 13, 2026. Updated yearly.

CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

What do patients say about their care?

  • CMS doesn’t publish staffing levels for hospitals.
Source:

CMS, Patient survey (HCAHPS) - Hospital and Timely and Effective Care - Hospital. Released Aug 13, 2026. Updated quarterly.

Who owns it?

  • American Health Companies LLC owns 100% directly since Jan 7, 2010.
  • American Health Partners Management LLC runs it.
  • 8 owners or officers are people: Mark T Mitchell (owns 5% or more through other companies, 47.07%); Robin Bradley (corporate officer); Robin Bradley (corporate director); Juanita Dufour (managing employee (on the payroll)); Michael D Bailey (corporate officer); Michael D Bailey (corporate director); Jeffrey Bogle (corporate officer); Jeffrey Bogle (corporate director).
  • CMS’s Provider of Services file records no change of ownership.
  • No private-equity firm among the owners CMS lists.
  • No real-estate investment trust among the owners CMS lists.
Source:

CMS, Hospital All Owners and Hospital Enrollments. Released Sep 29, 2026. Updated monthly.

CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.

Organisations CMS lists
OrganisationRoleShareSince
Flp Limited PartnershipOwns 5% or more through other companies100%Apr 6, 2021
American Health Companies LLCOwns 5% or more directly100%Jan 7, 2010
Mfo Ahp LLCOwns 5% or more through other companies99.02%Apr 6, 2021
Ahp Orchards LLCOwns 5% or more through other companies93.32%Apr 6, 2021
Orchard Holdings LLCOwns 5% or more through other companies47.07%Apr 6, 2021
Mitchell Family Irr Gst Tr Ua Dated December 28 2012Owns 5% or more through other companies23.54%Apr 6, 2021
Orchard Holdings II LLCOwns 5% or more through other companies23.54%Apr 6, 2021
Orchard Holdings III, LLCOwns 5% or more through other companies23.54%Apr 6, 2021
Mitchell Family II Irrv Gst Tr Uad 10-26-16Owns 5% or more through other companies11.77%Apr 6, 2021
Mitchell Family III Irrevocable Trust U/A Dated July 14, 2017Owns 5% or more through other companies11.77%Apr 6, 2021
American Health Partners Management LLCRuns it (operational or managerial control)Jan 17, 2020

How does it compare nearby?

  • Of the 2 hospitals CMS lists in Montgomery County, 1 has an overall star rating from CMS: 1 rated 1 of 5.
  • CMS gives this hospital no overall star rating to compare.
Source:

CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.

1 compared
PlaceOverall star rating
Vanderbilt Clarksville Hospital1

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for hospitals, so none are shown. The one payment cut CMS publishes for each hospital, under its Hospital-Acquired Condition Reduction Program, is shown where it applies.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • Most hospitals are accredited by a private organisation (The Joint Commission, DNV and others) whose routine inspections stand in for the state’s; those reports aren’t public, and QCOR holds only the state’s surveys: no inspection on record here doesn’t mean none took place.
  • QCOR says its hospital inspection data are complete only through September 17, 2026, while it moves to a new system.
  • CMS doesn’t publish staffing levels for hospitals.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Nov 5, 2026.

From the hospital

The public record above comes first. Anything the hospital adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the hospital will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the hospital”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 28, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.