Danville State Hospital
A psychiatric hospital in Danville, Pennsylvania 17821
50 Kirkbride Drive, Danville, Pennsylvania 17821. (570) 271-4500.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 20, 2026.
- Not rated CMS’s overall rating
- Not rated patient survey rating
- 17 deficiencies cited in the last three years
- 161 beds
Each figure’s source sits beside it, in its section below.
What these words mean2
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Aug 18, 2026: a standard inspection.
17 deficiencies cited in the last three years.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
When those deficiencies happened
17 deficiencies in 2 months of the last 36. Last cited Aug 2026. Most serious: Standard-level. The last 3 years, to Nov 5, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Dec | |||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Aug 18, 2026: standard inspection6 deficiencies
-
Initial Comments - Not A Deficiency Citation
“Facility ID# 56100100 Component 78 Building 03 North Block Building Based on an unannounced Medicare Recertification Survey completed August 18, 2026, it was determined that Danville State Hospital was not in compliance with the requirements of the Life Safety Code an existing acute care health care occupancy. Compliance with the National Fire Protection Association’s Life Safety Code is required by 42 CFR 482.41(b). This is a three story, Type III (211) protected, ordinary building, with attic and basement, that is fully sprinklered.”
-
Building Construction Type And Height
The inspectors’ words, 248 words
“Building Construction Type and Height CFR(s): NFPA 101 Building Construction Type and Height 2012 EXISTING Building construction type and stories meets Table 19.1.6.1, unless otherwise permitted by 19.1.6.2 through 19.1.6.7 19.1.6.4, 19.1.6.5 Construction Type 1 I (442), I (332), II (222) Any number of stories non-sprinklered and sprinklered 2 II (111) One story non-sprinklered Maximum 3 stories sprinklered 3 II (000) Not allowed non-sprinklered 4 III (211) Maximum 2 stories sprinklered 5 IV (2HH) 6 V (111) 7 III (200) Not allowed non-sprinklered 8 V (000) Maximum 1 story sprinklered Sprinklered stories must be sprinklered throughout by an approved, supervised automatic system in accordance with section 9.7. (See 19.3.5) Give a brief description, in REMARKS, of the construction, the number of stories, including basements, floors on which patients are located, location of smoke or fire barriers and dates of approval. Complete sketch or attach small floor plan of the building as appropriate. This Standard is not met as evidenced by: 50182 Based on observation and interview, it was determined the facility failed to maintain building construction requirements, affecting four of four floors within this component. Findings include: 1. Observation on August 18, 2026, between 10:00 am, and 11:45 am, revealed this component exceeded the maximum allowable story height for this type of construction. Exit interview with the Facility CEO, the Facility Executive Director, and the Facilities Manager, on August 18, 2026, at 12:00 pm, confirmed this component exceeded the maximum allowable story height for this type of construction.”
-
Emergency Lighting
The inspectors’ words, 120 words
“Emergency Lighting CFR(s): NFPA 101 Emergency Lighting Emergency lighting of at least 1-1/2-hour duration is provided automatically in accordance with 7.9. 18.2.9.1, 19.2.9.1 This Standard is not met as evidenced by: 50182 Based on observation and interview, it was determined that the facility failed to maintain emergency lighting in one location, affecting one of two floors. Findings include: 1. Observation on August 18, 2026, at 10:10 am, 1st floor, revealed the emergency lights on the exit sign, inside the exit enclosure behind door 1100B, failed to illuminate when tested. Exit interview with the Facility CEO, the Facility Executive Director, and the Facilities Manager, on August 18, 2026, at 12:00 pm, confirmed this the emergency lights failed to illuminate when tested.”
-
Hazardous Areas - Enclosure
The inspectors’ words, 251 words
“Hazardous Areas - Enclosure CFR(s): NFPA 101 Hazardous Areas - Enclosure Hazardous areas are protected by a fire barrier having 1-hour fire resistance rating (with 3/4 hour fire rated doors) or an automatic fire extinguishing system in accordance with 8.7.1 or 19.3.5.9. When the approved automatic fire extinguishing system option is used, the areas shall be separated from other spaces by smoke resisting partitions and doors in accordance with 8.4. Doors shall be self-closing or automatic-closing and permitted to have nonrated or field-applied protective plates that do not exceed 48 inches from the bottom of the door. Describe the floor and zone locations of hazardous areas that are deficient in REMARKS. 19.3.2.1, 19.3.5.9 Area Automatic Sprinkler Separation N/A a. Boiler and Fuel-Fired Heater Rooms b. Laundries (larger than 100 square feet) c. Repair, Maintenance, and Paint Shops d. Soiled Linen Rooms (exceeding 64 gallons) e. Trash Collection Rooms (exceeding 64 gallons) f. Combustible Storage Rooms/Spaces (over 50 square feet) g. Laboratories (if classified as Severe Hazard - see K322) This Standard is not met as evidenced by: 19375 Based on observation and interview, it was determined the facility failed to maintain one hazardous area enclosure, affecting one of three floors. Findings include: 1. Observation on August 18, 2026, at 11:11 a.m., revealed the undercut of the 212, (Room 21-C) Housekeeping Closet, exceeded one inch. Exit interview with the Facility CEO, the Facility Executive Director, and the Facilities Manager, on August 18, 2026, at 12:00 pm, confirmed the hazardous area enclosure deficiency.”
-
Corridor - Doors
The inspectors’ words, 360 words
“Corridor - Doors CFR(s): NFPA 101 Corridor - Doors Doors protecting corridor openings in other than required enclosures of vertical openings, exits, or hazardous areas resist the passage of smoke and are made of 1 3/4 inch solid-bonded core wood or other material capable of resisting fire for at least 20 minutes. Doors in fully sprinklered smoke compartments are only required to resist the passage of smoke. Corridor doors and doors to rooms containing flammable or combustible materials have positive latching hardware. Roller latches are prohibited by CMS regulation. These requirements do not apply to auxiliary spaces that do not contain flammable or combustible material. Clearance between bottom of door and floor covering is not exceeding 1 inch. Powered doors complying with 7.2.1.9 are permissible if provided with a device capable of keeping the door closed when a force of 5 lbf is applied. There is no impediment to the closing of the doors. Hold open devices that release when the door is pushed or pulled are permitted. Nonrated protective plates of unlimited height are permitted. Dutch doors meeting 19.3.6.3.6 are permitted. Door frames shall be labeled and made of steel or other materials in compliance with 8.3, unless the smoke compartment is sprinklered. Fixed fire window assemblies are allowed per 8.3. In sprinklered compartments there are no restrictions in area or fire resistance of glass or frames in window assemblies. 19.3.6.3, 42 CFR Parts 403, 418, 460, 482, 483, and 485 Show in REMARKS details of doors such as fire protection ratings, automatics closing devices, etc. This Standard is not met as evidenced by: 19375 Based on observation and interview, it was determined the facility failed to maintain two corridor openings, affecting one of three floors. Findings include: 1. Observation on August 18, 2026, between 9:57 a.m., and 10:02 a.m., revealed the following: a. 9:57 a.m., the first floor, 211 Medication Room door required adjustment to fully close and latch. b. 10:02 a.m., the 211 Day Room door required adjustment to fully latch. Exit interview with the Facility CEO, the Facility Executive Director, and the Facilities Manager, on August 18, 2026, at 12:00 pm, confirmed the corridor opening deficiencies.”
-
Subdivision Of Building Spaces - Smoke Barrie
The inspectors’ words, 195 words
“Subdivision of Building Spaces - Smoke Barrie CFR(s): NFPA 101 Subdivision of Building Spaces - Smoke Barrier Construction 2012 EXISTING Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier. 19.3.7.3, 8.6.7.1(1) Describe any mechanical smoke control system in REMARKS. This Standard is not met as evidenced by: 50182 Based on observation and interview, it was determined the facility failed to maintain the smoke resistance of smoke barrier walls in one location, affecting one of four floors. Findings include: 1. Observation on August 18, 2026, at 10:21 am, Unit 310, revealed two penetrations of the smoke barrier wall, one unsealed penetration around two blue data wires and a yellow data wire. A second unsealed penetration next to the first, above smoke doors 1200A on the 1st floor. Exit interview with the Facility CEO, the Facility Executive Director, and the Facilities Manager, on August 18, 2026, at 12:00 pm, confirmed this the unsealed penetrations.”
Dec 14, 2023: standard inspection11 deficiencies
-
Initial Comments - Not A Deficiency Citation
“Facility ID# 56100100 Component 89 Building 02 South Block Building Based on an unannounced Medicare Recertification Survey completed December 14, 2023, it was determined that Danville State Hospital was not in compliance with the requirements of the Life Safety Code an existing acute care health care occupancy. Compliance with the National Fire Protection Association’s Life Safety Code is required by 42 CFR 482.41(b). This is a three story, Type III (211) protected, ordinary building, with attic and basement, that is fully sprinklered.”
-
Multiple Occupancies
The inspectors’ words, 207 words
“Multiple Occupancies CFR(s): NFPA 101 Multiple Occupancies - Sections of Health Care Facilities Sections of health care facilities classified as other occupancies meet all of the following: o They are not intended to serve four or more inpatients for purposes of housing, treatment, or customary access. o They are separated from areas of health care occupancies by construction having a minimum two hour fire resistance rating in accordance with Chapter 8. o The entire building is protected throughout by an approved, supervised automatic sprinkler system in accordance with Section 9.7. Hospital outpatient surgical departments are required to be classified as an Ambulatory Health Care Occupancy regardless of the number of patients served. 19.1.3.3, 42 CFR 482.41, 42 CFR 485.623 This Standard is not met as evidenced by: 19375 Based on observation and interview, it was determined the facility failed to maintain one common wall, affecting one of four floors. Findings include: 1. Observation on December 14, 2023, at 11:40 a.m., revealed the Unit 311, Visiting Room door required adjustment to fully latch within the door frame assembly. Exit interview with the Facility C.E.O., the Facility Executive Director, and the Facilities Manager, on December 14, 2023, between 1:15 p.m., and 1:30 p.m., confirmed the common wall door deficiency.”
-
Building Construction Type And Height
The inspectors’ words, 251 words
“Building Construction Type and Height CFR(s): NFPA 101 Building Construction Type and Height 2012 EXISTING Building construction type and stories meets Table 19.1.6.1, unless otherwise permitted by 19.1.6.2 through 19.1.6.7 19.1.6.4, 19.1.6.5 Construction Type 1 I (442), I (332), II (222) Any number of stories non-sprinklered and sprinklered 2 II (111) One story non-sprinklered Maximum 3 stories sprinklered 3 II (000) Not allowed non-sprinklered 4 III (211) Maximum 2 stories sprinklered 5 IV (2HH) 6 V (111) 7 III (200) Not allowed non-sprinklered 8 V (000) Maximum 1 story sprinklered Sprinklered stories must be sprinklered throughout by an approved, supervised automatic system in accordance with section 9.7. (See 19.3.5) Give a brief description, in REMARKS, of the construction, the number of stories, including basements, floors on which patients are located, location of smoke or fire barriers and dates of approval. Complete sketch or attach small floor plan of the building as appropriate. This Standard is not met as evidenced by: 19375 Based on observation and interview, it was determined the facility failed to maintain building construction requirements, affecting four of four floors within this component. Findings include: 1. Observation on December 14, 2023, between 11:30 a.m., and 1:15 p.m., revealed this component exceeded the maximum allowable story height for this type of construction. Exit interview with the Facility C.E.O., the Facility Executive Director, and the Facilities Manager, on December 14, 2023, between 1:15 p.m., and 1:30 p.m., confirmed this component exceeded the maximum allowable story height for this type of construction.”
-
Stairways And Smokeproof Enclosures
The inspectors’ words, 112 words
“Stairways and Smokeproof Enclosures CFR(s): NFPA 101 Stairways and Smokeproof Enclosures Stairways and Smokeproof enclosures used as exits are in accordance with 7.2. 18.2.2.3, 18.2.2.4, 19.2.2.3, 19.2.2.4, 7.2 This Standard is not met as evidenced by: 19375 Based on observation and interview, it was determined the facility failed to maintain one stair tower enclosure, affecting three of three floors. Findings include: 1. Observation on December 14, 2023, at 12:44 p.m., revealed the Unit 214, door 2055, stair tower enclosure door was not fire-tight. Exit interview with the Facility C.E.O., the Facility Executive Director, and the Facilities Manager, on December 14, 2023, between 1:15 p.m., and 1:30 p.m., confirmed the stair tower deficiency.”
-
Exit Signage
The inspectors’ words, 135 words
“Exit Signage CFR(s): NFPA 101 Exit Signage 2012 EXISTING Exit and directional signs are displayed in accordance with 7.10 with continuous illumination also served by the emergency lighting system. 19.2.10.1 (Indicate N/A in one-story existing occupancies with less than 30 occupants where the line of exit travel is obvious.) This Standard is not met as evidenced by: 19375 Based on observation and interview, it was determined the facility failed to maintain exit signage in one location, affecting one of four floors. Findings include: 1. Observation on December 14, 2023, at 9:14 a.m., revealed exit signage had been removed from the second floor, Unit 214 construction area. Exit interview with the Facility C.E.O., the Facility Executive Director, and the Facilities Manager, on December 14, 2023, between 1:15 p.m., and 1:30 p.m., confirmed the exit signage deficiency.”
-
Vertical Openings - Enclosure
The inspectors’ words, 205 words
“Vertical Openings - Enclosure CFR(s): NFPA 101 Vertical Openings - Enclosure 2012 EXISTING Stairways, elevator shafts, light and ventilation shafts, chutes, and other vertical openings between floors are enclosed with construction having a fire resistance rating of at least 1 hour. An atrium may be used in accordance with 8.6. 19.3.1.1 through 19.3.1.6 If all vertical openings are properly enclosed with construction providing at least a 2-hour fire resistance rating, also check this box. This Standard is not met as evidenced by: 19375 Based on observation and interview, it was determined the facility failed to maintain vertical openings in three locations, affecting three of three floors. Findings include: 1. Observation on December 14, 2023, between 10:23 a.m., and 10:42 a.m., revealed the following: a. 10:23 a.m., a penetration of the floor slab assembly, located within the third floor room, closest to stair tower door 3072. b. 10:40 a.m., at the floor slab assembly, located within the Unit 209 Shower Room. c. 10:42 a.m., an unprotected, three story, vertical opening, located within the Unit 209 Shower Room. Exit interview with the Facility C.E.O., the Facility Executive Director, and the Facilities Manager, on December 14, 2023, between 1:15 p.m., and 1:30 p.m., confirmed the vertical opening deficiencies.”
-
Hazardous Areas - Enclosure
The inspectors’ words, 254 words
“Hazardous Areas - Enclosure CFR(s): NFPA 101 Hazardous Areas - Enclosure Hazardous areas are protected by a fire barrier having 1-hour fire resistance rating (with 3/4 hour fire rated doors) or an automatic fire extinguishing system in accordance with 8.7.1 or 19.3.5.9. When the approved automatic fire extinguishing system option is used, the areas shall be separated from other spaces by smoke resisting partitions and doors in accordance with 8.4. Doors shall be self-closing or automatic-closing and permitted to have nonrated or field-applied protective plates that do not exceed 48 inches from the bottom of the door. Describe the floor and zone locations of hazardous areas that are deficient in REMARKS. 19.3.2.1, 19.3.5.9 Area Automatic Sprinkler Separation N/A a. Boiler and Fuel-Fired Heater Rooms b. Laundries (larger than 100 square feet) c. Repair, Maintenance, and Paint Shops d. Soiled Linen Rooms (exceeding 64 gallons) e. Trash Collection Rooms (exceeding 64 gallons) f. Combustible Storage Rooms/Spaces (over 50 square feet) g. Laboratories (if classified as Severe Hazard - see K322) This Standard is not met as evidenced by: 19375 Based on observation and interview, it was determined the facility failed to maintain one hazardous area enclosure, affecting one of four floors. Findings include: 1. Observation on December 14, 2023, at 9:02 a.m., revealed the Unit 211, Room 1100F, Janitor’s Closet door lacked a self-closing device. Exit interview with the Facility C.E.O., the Facility Executive Director, and the Facilities Manager, on December 14, 2023, between 1:15 p.m., and 1:30 p.m., confirmed the hazardous area enclosure deficiency.”
-
Sprinkler System - Installation
The inspectors’ words, 205 words
“Sprinkler System - Installation CFR(s): NFPA 101 Spinkler System - Installation 2012 EXISTING Nursing homes, and hospitals where required by construction type, are protected throughout by an approved automatic sprinkler system in accordance with NFPA 13, Standard for the Installation of Sprinkler Systems. In Type I and II construction, alternative protection measures are permitted to be substituted for sprinkler protection in specific areas where state or local regulations prohibit sprinklers. In hospitals, sprinklers are not required in clothes closets of patient sleeping rooms where the area of the closet does not exceed 6 square feet and sprinkler coverage covers the closet footprint as required by NFPA 13, Standard for Installation of Sprinkler Systems. 19.3.5.1, 19.3.5.2, 19.3.5.3, 19.3.5.4, 19.3.5.5, 19.4.2, 19.3.5.10, 9.7, 9.7.1.1(1) This Standard is not met as evidenced by: 19375 Based on observation and interview, it was determined the facility failed to install automatic sprinkler protection in one location, affecting one of four floors. Findings include: 1. Observation on December 14, 2023, at 8:37 a.m., revealed the Unit 211, electrical closet, lacked automatic sprinkler protection. Exit interview with the Facility C.E.O., the Facility Executive Director, and the Facilities Manager, on December 14, 2023, between 1:15 p.m., and 1:30 p.m., confirmed automatic sprinkler protection deficiency.”
-
Subdivision Of Building Spaces - Smoke Barrie
The inspectors’ words, 195 words
“Subdivision of Building Spaces - Smoke Barrie CFR(s): NFPA 101 Subdivision of Building Spaces - Smoke Barrier Construction 2012 EXISTING Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier. 19.3.7.3, 8.6.7.1(1) Describe any mechanical smoke control system in REMARKS. This Standard is not met as evidenced by: 19375 Based on observation and interview, it was determined the facility failed to maintain smoke barrier walls in two locations, affecting two of four floors. Findings include: 1. Observation on December 14, 2023, between 9:31 a.m., and 10:10 a.m., revealed penetrations of the smoke barrier separation walls in the following locations: a. 9:31 a.m., within the second floor, Unit 213, above the 2016 door. b. 10:10 a.m., above third floor, smoke barrier door 3300. Exit interview with the Facility C.E.O., the Facility Executive Director, and the Facilities Manager, on December 14, 2023, between 1:15 p.m., and 1:30 p.m., confirmed the smoke barrier separation wall deficiencies.”
-
Subdivision Of Building Spaces - Smoke Barrie
The inspectors’ words, 189 words
“Subdivision of Building Spaces - Smoke Barrie CFR(s): NFPA 101 Subdivision of Building Spaces - Smoke Barrier Doors 2012 EXISTING Doors in smoke barriers are 1-3/4-inch thick solid bonded wood-core doors or of construction that resists fire for 20 minutes. Nonrated protective plates of unlimited height are permitted. Doors are permitted to have fixed fire window assemblies per 8.5. Doors are self-closing or automatic-closing, do not require latching, and are not required to swing in the direction of egress travel. Door opening provides a minimum clear width of 32 inches for swinging or horizontal doors. 19.3.7.6, 19.3.7.8, 19.3.7.9 This Standard is not met as evidenced by: 19375 Based on observation and interview, it was determined the facility failed to maintain one set of smoke barrier separation doors, affecting one of four floors. Findings include: 1. Observation on December 14, 2023, at 9:22 a.m., revealed the 2200A, smoke barrier separation door, was lacking a portion of the self-closing assembly. Exit interview with the Facility C.E.O., the Facility Executive Director, and the Facilities Manager, on December 14, 2023, between 1:15 p.m., and 1:30 p.m., confirmed the smoke barrier separation door deficiency.”
-
Hvac
The inspectors’ words, 130 words
“HVAC CFR(s): NFPA 101 HVAC Heating, ventilation, and air conditioning shall comply with 9.2 and shall be installed in accordance with the manufacturer’s specifications. 18.5.2.1, 19.5.2.1, 9.2 This Standard is not met as evidenced by: 19375 Based on observation and interview, it was determined the facility failed to maintain the heating, ventilation, and air conditioning system in one location, affecting two of four floors. Findings include: 1. Observation on December 14, 2023, at 8:45 a.m., revealed a fresh air duct penetration of the floor slab assembly, located within the first floor, Unit 211, Room 1100C, lacked retaining angles and a fire damper. Exit interview with the Facility C.E.O., the Facility Executive Director, and the Facilities Manager, on December 14, 2023, between 1:15 p.m., and 1:30 p.m., confirmed the HVAC deficiency.”
All 4 inspections in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Aug 18, 2026 | Standard inspection | 6 deficiencies cited |
| Aug 6, 2026 | Standard inspection | No deficiencies cited |
| Dec 14, 2023 | Standard inspection | 11 deficiencies cited |
| Dec 7, 2023 | Standard inspection | No deficiencies cited |
How do patients fare?
- CMS gives no overall CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.: “Data are shown only for hospitals that participate in the Inpatient Quality Reporting (IQR) and Outpatient Quality Reporting (OQR) programs.”
- CMS publishes no patient survey results for it.
CMS, Hospital General Information, Patient survey (HCAHPS) - Hospital, Healthcare Associated Infections - Hospital, Timely and Effective Care - Hospital and Medicare Spending Per Beneficiary - Hospital. Released Aug 13, 2026. Updated quarterly.
CMS, Complications and Deaths - Hospital and Unplanned Hospital Visits - Hospital. Released Sep 30, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Overall ratingCMS’s overall hospital quality star rating, 1 to 5 | Not rated |
| Patient survey ratingCMS star rating from its survey of the hospital’s patients (HCAHPS), 1 to 5 | Not rated |
Is it certified, and in good standing?
- Medicare-certified psychiatric hospital since Jul 1, 1966.
- Ownership: government - state.
- It is not accredited by a private organisation, so the state carries out its routine inspections for Medicare.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Government - State.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for hospitals.
- CMS’s HAC Reduction Program file has no result for it: the program covers general acute care hospitals Medicare pays under its inpatient prospective payment system.
- None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
CMS, Hospital-Acquired Condition (HAC) Reduction Program. Released Aug 13, 2026. Updated yearly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
What do patients say about their care?
- CMS doesn’t publish staffing levels for hospitals.
CMS, Patient survey (HCAHPS) - Hospital and Timely and Effective Care - Hospital. Released Aug 13, 2026. Updated quarterly.
Who owns it?
- Pennsylvania Department of Human Services runs it.
- 12 owners or officers are people: Tricia Carpenter (managing employee (on the payroll)); Joseph Caulfield (managing employee (on the payroll)); Joseph Caulfield (runs it (operational or managerial control)); Myra Lynn Mcswain Kamran (managing employee (under contract)); Myra Lynn Mcswain Kamran (managing employee (on the payroll)); Cheryl Tressler (managing employee (on the payroll)); Cheryl Tressler (runs it (operational or managerial control)); Diane Dalberto (managing employee (on the payroll)); Diane Dalberto (runs it (operational or managerial control)); Kathy Light (managing employee (on the payroll)); Thomas Burk (managing employee (on the payroll)); Thomas Burk (runs it (operational or managerial control)).
- CMS’s Provider of Services file records 1 change of ownership.
- No private-equity firm among the owners CMS lists.
- No real-estate investment trust among the owners CMS lists.
CMS, Hospital All Owners and Hospital Enrollments. Released Sep 29, 2026. Updated monthly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
How does it compare nearby?
- Of the 3 hospitals CMS lists in Montour County, 1 has an overall star rating from CMS: 1 rated 4 of 5.
- CMS gives this hospital no overall star rating to compare.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
| Place | Overall star rating |
|---|---|
| Geisinger Behavioral Health Center Danville | Not given |
| Geisinger Medical Center | 4 |
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for hospitals, so none are shown. The one payment cut CMS publishes for each hospital, under its Hospital-Acquired Condition Reduction Program, is shown where it applies.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- Most hospitals are accredited by a private organisation (The Joint Commission, DNV and others) whose routine inspections stand in for the state’s; those reports aren’t public, and QCOR holds only the state’s surveys: no inspection on record here doesn’t mean none took place.
- QCOR says its hospital inspection data are complete only through September 17, 2026, while it moves to a new system.
- CMS doesn’t publish staffing levels for hospitals.
Sources
-
Centers for Medicare & Medicaid Services, Hospital General Information (xubh-q36u).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (HCAHPS) - Hospital.
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Healthcare Associated Infections - Hospital (77hc-ibv8).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Complications and Deaths - Hospital (ynj2-r877).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Unplanned Hospital Visits - Hospital (632h-zaca).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Timely and Effective Care - Hospital (yv7e-xc69).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Medicare Spending Per Beneficiary - Hospital (rrqw-56er).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital-Acquired Condition (HAC) Reduction Program (yq43-i98g).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated yearly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Provider of Services File - Hospital & Non-Hospital Facilities (Hospital_and_other.DATA.Q3_2026.csv).
Released Oct 14, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Hospital 2567 statements of deficiencies (Hospital_2567s_2010_to_2026YTD.xlsx).
Released Oct 20, 2026 and checked Oct 27, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital All Owners (Hospital_All_Owners_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital Enrollments (Hospital_Enrollments_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Nov 5, 2026.
From the hospital
The public record above comes first. Anything the hospital adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the hospital will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the hospital”, and paying will never change a finding, a rating or the order of results.