- Medicare payments cut under the HAC Reduction Program (fiscal year 2026)
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 20, 2026.
- 2of 5 CMS’s overall rating
- 3of 5 patient survey rating
- 18 deficiencies cited in the last three years
- 294 beds
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on May 5, 2025: a complaint inspection.
18 deficiencies cited in the last three years.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
When those deficiencies happened
18 deficiencies in 1 month of the last 36. Last cited Oct 2024. Most serious: Standard-level. The last 3 years, to Nov 5, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Dec | |||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Oct 23, 2024: standard inspection18 deficiencies
-
Initial Comments - Not A Deficiency Citation
“Facility ID # 023701 Component 03 North Wing & X Building Based on a Recertification Survey completed on October 23, 2024, it was determined that Independence Health System Butler Memorial Hospital was not in compliance with the requirements of the Life Safety Code for an existing acute care health care occupancy. Compliance with the National Fire Protection Association’s Life Safety Code is required by 42 CFR 482.41(b). This is a six-story, Type II (222), fire resistive building, that is partially sprinklered.”
-
Means Of Egress - General
The inspectors’ words, 139 words
“Means of Egress - General CFR(s): NFPA 101 Means of Egress - General Aisles, passageways, corridors, exit discharges, exit locations, and accesses are in accordance with Chapter 7, and the means of egress is continuously maintained free of all obstructions to full use in case of emergency, unless modified by 18/19.2.2 through 18/19.2.11. 18.2.1, 19.2.1, 7.1.10.1 This Standard is not met as evidenced by: 43722 Based on observation and interview, the facility failed to maintain the means of egress, being free of all obstructions, for one of over five exits within this facility. Findings include: Observation on October 23, 2024, at 10:26 a.m., revealed the second floor cardiac cath lab exit corridor, next to S-2 stairwell, was obstructed with multiple carts. Interview with the maintenance technician on October 23, 2024, at 10:26 a.m., confirmed the exit discharge was obstructed.”
-
Vertical Openings - Enclosure
The inspectors’ words, 236 words
“Vertical Openings - Enclosure CFR(s): NFPA 101 Vertical Openings - Enclosure 2012 EXISTING Stairways, elevator shafts, light and ventilation shafts, chutes, and other vertical openings between floors are enclosed with construction having a fire resistance rating of at least 1 hour. An atrium may be used in accordance with 8.6. 19.3.1.1 through 19.3.1.6 If all vertical openings are properly enclosed with construction providing at least a 2-hour fire resistance rating, also check this box. This Standard is not met as evidenced by: 43722 Based on observation and interview, the facility failed to maintain vertical openings for one of over four chute doors. Findings include: Observation on October 23, 2024, at 12:33 p.m., revealed the fourth floor, south wing, soiled linen chute door failed to properly close and self-latch. Interview with the maintenance technician on October 23, 2024, at 12:33 p.m., confirmed the chute door deficiency. 49939 Based on observation and interview, the facility failed to maintain vertical door openings for two of two vertical door openings. Findings include: Observation on October 23, 2024, between 12:12 p.m. and 12:35 p.m., revealed the following vertically opening doors failed to properly close and self-latch: A. (12:12 p.m.) Three X, three north, third floor, soiled linen room, chute door; B. (12:35 p.m.) Three X, three south, third floor, soiled linen room, chute door. Interview with the operations manager on October 23, 2024, at 12:35 p.m., confirmed the vertical door deficiencies.”
-
Cooking Facilities
The inspectors’ words, 295 words
“Cooking Facilities CFR(s): NFPA 101 Cooking Facilities Cooking equipment is protected in accordance with NFPA 96, Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations, unless: * residential cooking equipment (i.e., small appliances such as microwaves, hot plates, toasters) are used for food warming or limited cooking in accordance with 18.3.2.5.2, 19.3.2.5.2 * cooking facilities open to the corridor in smoke compartments with 30 or fewer patients comply with the conditions under 18.3.2.5.3, 19.3.2.5.3, or * cooking facilities in smoke compartments with 30 or fewer patients comply with conditions under 18.3.2.5.4, 19.3.2.5.4. Cooking facilities protected according to NFPA 96 per 9.2.3 are not required to be enclosed as hazardous areas, but shall not be open to the corridor. 18.3.2.5.1 through 18.3.2.5.4, 19.3.2.5.1 through 19.3.2.5.5, 9.2.3, TIA 12-2 This Standard is not met as evidenced by: 42642 Based on observation, document review, and interview, the facility failed to meet ANSI/UL 300 requirements for one of one cooking facility. Findings include: Observation on October 23, 2024, at 1:40 p.m., revealed the cooking facility failed to have automatic extinguishing equipment that met UL 300 systems using wet chemicals. The facility had the first layer of protection by a wet pipe sprinkler system. Upon investigation, the kitchen was occasionally cooking using oil. A buildup of black sludge covered one silver sprinkler head over the grill. The sludge may limit the sprinkler’s ability to work properly in the event of an emergency. In addition, the facility failed to provide proper placard signage to meet NFPA 96 10.2.2 requirements, identifying the second layer of extinguishment protection of the K-type fire extinguisher. Interview with the director of facilities on October 23, 2024, at 1:40 pm., confirmed the deficiencies and stated the facility is in the process of replacing the system.”
-
Alcohol Based Hand Rub Dispenser (Abhr)
The inspectors’ words, 257 words
“Alcohol Based Hand Rub Dispenser (ABHR) CFR(s): NFPA 101 Alcohol Based Hand Rub Dispenser (ABHR) ABHRs are protected in accordance with 8.7.3.1, unless all conditions are met: * Corridor is at least 6 feet wide * Maximum individual dispenser capacity is 0.32 gallons (0.53 gallons in suites) of fluid and 18 ounces of Level 1 aerosols * Dispensers shall have a minimum of 4-foot horizontal spacing * Not more than an aggregate of 10 gallons of fluid or 135 ounces aerosol are used in a single smoke compartment outside a storage cabinet, excluding one individual dispenser per room * Storage in a single smoke compartment greater than 5 gallons complies with NFPA 30 * Dispensers are not installed within 1 inch of an ignition source * Dispensers over carpeted floors are in sprinklered smoke compartments * ABHR does not exceed 95 percent alcohol * Operation of the dispenser shall comply with Section 18.3.2.6(11) or 19.3.2.6(11) * ABHR is protected against inappropriate access 18.3.2.6, 19.3.2.6, 42 CFR Parts 403, 418, 460, 482, 483, and 485 This Standard is not met as evidenced by: 42642 Based on observation and interview, the facility failed to meet alcohol-based hand rub requirements for one of three components. Findings include: Observation on October 23, 2024, at 11:20 a.m., revealed the pharmacy storage room had over 30 gallons of 200-proof, 100% alcohol hand sanitizer stored in boxes in a single smoke compartment. Interview with the regional facilities director on October 23, 2024, at 11:20 a.m., confirmed the alcohol-based hand sanitizer stored exceeded quantity requirements.”
-
Fire Alarm System - Installation
The inspectors’ words, 200 words
“Fire Alarm System - Installation CFR(s): NFPA 101 Fire Alarm System - Installation A fire alarm system is installed with systems and components approved for the purpose in accordance with NFPA 70, National Electric Code, and NFPA 72, National Fire Alarm Code to provide effective warning of fire in any part of the building. In areas not continuously occupied, detection is installed at each fire alarm control unit. In new occupancy, detection is also installed at notification appliance circuit power extenders, and supervising station transmitting equipment. Fire alarm system wiring or other transmission paths are monitored for integrity. 18.3.4.1, 19.3.4.1, 9.6, 9.6.1.8 This Standard is not met as evidenced by: 42642 Based on observation and interview, the facility failed to meet fire alarm system requirements for one of over three fire alarm panels. Findings include: Observation on October 23, 2024, at 11:10 a.m., revealed first floor electrical closet 1 main ADD 15, outside of the pharmacy, had a fire alarm panel that was not functioning. No information was provided to indicate the panel was outdated or still in use. Interview with the facilities regional director on October 23, 2024, at 11:10 a.m., confirmed the fire alarm panel was not functioning.”
-
Fire Alarm System - Testing And Maintenance
The inspectors’ words, 170 words
“Fire Alarm System - Testing and Maintenance CFR(s): NFPA 101 Fire Alarm System - Testing and Maintenance A fire alarm system is tested and maintained in accordance with an approved program complying with the requirements of NFPA 70, National Electric Code, and NFPA 72, National Fire Alarm and Signaling Code. Records of system acceptance, maintenance and testing are readily available. 9.6.1.3, 9.6.1.5, NFPA 70, NFPA 72 This Standard is not met as evidenced by: 42642 Based on observation and interview, the facility failed to maintain the fire alarm system, affecting the main building. Findings include: Observation on October 23, 2024, at 11:22 a.m., revealed the fire alarm panel displayed multiple trouble signals. Through interview, the trouble mode was bypassed due to approved construction activities at the facility. The facility did not want the construction to inadvertently activate the alarm system. The alarm panel is still monitored by the facility dispatch center. Interview with the director of facilities on October 23, 2024 at 11:22 a.m., confirmed the fire alarm panel deficiency.”
-
Sprinkler System - Maintenance And Testing
The inspectors’ words, 254 words
“Sprinkler System - Maintenance and Testing CFR(s): NFPA 101 Sprinkler System - Maintenance and Testing Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available. a) Date sprinkler system last checked _____________________ b) Who provided system test ____________________________ c) Water system supply source __________________________ Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system. 9.7.5, 9.7.7, 9.7.8, and NFPA 25 This Standard is not met as evidenced by: 42642 Based on document review and interview, the facility failed to meet sprinkler system requirements for one of three components. Findings include: Document review on October 23, 2024, at 9:32 a.m., revealed the last annual fire pump inspection occurred on September 7, 2023. Interview with the facilities director on October 23, 2024, at 9:32 a.m., confirmed the facility lacked documentation for a more-recent inspection, and stated a vendor was scheduled to complete the inspection soon. 43722 Based on observation and interview, the facility failed to maintain the sprinkler system in one of three components. Findings include: Observation on October 23, 2024, at 9:30 a.m., revealed the seventh floor S main 7 stairwell had a sprinkler gauge with a 2015 date, without documentation that calibration took place within the last five years. Interview with the maintenance technciain on October 23, 2024, at 9:30 a.m., confirmed the sprinkler gauge deficiency.”
-
Subdivision Of Building Spaces - Smoke Barrie
The inspectors’ words, 181 words
“Subdivision of Building Spaces - Smoke Barrie CFR(s): NFPA 101 Subdivision of Building Spaces - Smoke Barrier Construction 2012 EXISTING Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier. 19.3.7.3, 8.6.7.1(1) Describe any mechanical smoke control system in REMARKS. This Standard is not met as evidenced by: 49939 Based on observation and interview, the facility failed to maintain the smoke barrier requirements in two of over ten rooms. Findings include: Observation on October 23, 2024, between 8:59 a.m. and 9:07 a.m., revealed the following deficiencies: A. (8:59 a.m.) Ground floor corridor connecting to the new addition, near door 36, had two penetrations in the wallboard; B. (9:07 a.m.) Ground floor electrical room had cinderblock and wall joint openings, allowing smoke passage. Interview with the maintenance supervisor on October 23, 2024, at 9:07 a.m., confirmed the smoke barrier deficiencies.”
-
Fire Drills
The inspectors’ words, 154 words
“Fire Drills CFR(s): NFPA 101 Fire Drills Fire drills include the transmission of a fire alarm signal and simulation of emergency fire conditions. Fire drills are held at expected and unexpected times under varying conditions, at least quarterly on each shift. The staff is familiar with procedures and is aware that drills are part of established routine. Where drills are conducted between 9:00 PM and 6:00 AM, a coded announcement may be used instead of audible alarms. 19.7.1.4 through 19.7.1.7 This Standard is not met as evidenced by: 42642 Based on document review and interview, the facility failed to meet fire drill requirements for three of three components. Findings include: Document review on October 23, 2024, at 9:44 a.m., revealed the facility lacked documentation for incorporating fire drills with all staff members each shift, per quarter. Interview with the facility director on October 23, 2024, at 9:44 a.m., confirmed the facility lacked the documentation.”
-
Combustible Decorations
The inspectors’ words, 178 words
“Combustible Decorations CFR(s): NFPA 101 Combustible Decorations Combustible decorations shall be prohibited unless one of the following is met: o Flame retardant or treated with approved fire-retardant coating that is listed and labeled for product. o Decorations meet NFPA 701. o Decorations exhibit heat release less than 100 kilowatts in accordance with NFPA 289. o Decorations, such as photographs, paintings and other art are attached to the walls, ceilings and non-fire-rated doors in accordance with 18.7.5.6(4) or 19.7.5.6(4). o The decorations in existing occupancies are in such limited quantities that a hazard of fire development or spread is not present. 19.7.5.6 This Standard is not met as evidenced by: 49939 Based on observation and interview, the facility failed to maintain combustible decorations on seven of over fourteen doors. Findings include: Observation on October 23, 2024, at 12:32 p.m., revealed building three X, third floor, three south, had seven doors with decorations that exceeded the allowable rate of coverage (= thirty percent). Interview with the maintenance supervisor on October 23, 2024, at 12:32 p.m., confirmed the combustible decoration deficiencies.”
-
Soiled Linen And Trash Containers
The inspectors’ words, 236 words
“Soiled Linen and Trash Containers CFR(s): NFPA 101 Soiled Linen and Trash Containers Soiled linen or trash collection receptacles shall not exceed 32 gallons in capacity. The average density of container capacity in a room or space shall not exceed 0.5 gallons/square feet. A total container capacity of 32 gallons shall not be exceeded within any 64 square feet area. Mobile soiled linen or trash collection receptacles with capacities greater than 32 gallons shall be located in a room protected as a hazardous area when not attended. Containers used solely for recycling are permitted to be excluded from the above requirements where each container is less than or equal to 96 gallons unless attended, and containers for combustibles are labeled and listed as meeting FM Approval Standard 6921 or equivalent. 18.7.5.7, 19.7.5.7 This Standard is not met as evidenced by: 49939 Based on observation and interview, the facility failed to manage quantities of soiled linen/trash in approved containers in one of more than seven soiled linen/trash rooms. Findings include: Observation on October 23, 2024, at 9:10 a.m., First floor, soiled linen/trash room, chute discharge area, revealed excessive amounts, and overflowing trash bins onto the floor and not in approved containers, from the trash discharge of the trash chute. Plastic bags and loose trash was on the floor, creating a fire hazard. Interview with the maintenance supervisor on October 23, 2024, at 9:10 a.m., confirmed the deficiency.”
-
Maintenance, Inspection And Testing - Doors
The inspectors’ words, 187 words
“Maintenance, Inspection & Testing - Doors CFR(s): Maintenance, Inspection & Testing - Doors Fire doors assemblies are inspected and tested annually in accordance with NFPA 80, Standard for Fire Doors and Other Opening Protectives. Non-rated doors, including corridor doors to patient rooms and smoke barrier doors, are routinely inspected as part of the facility maintenance program. Individuals performing the door inspections and testing possess knowledge, training or experience that demonstrates ability. Written records of inspection and testing are maintained and are available for review. 19.7.6, 8.3.3.1 (LSC) 5.2, 5.2.3 (2010 NFPA 80) This Standard is not met as evidenced by: 42642 Based on document review and interview, the facility failed to meet door maintenance, inspection, and testing requirements for three of three components. Findings include: Document review on October 23, 2024, at 10:00 a.m., revealed the facility’s 2023 and 2024 inspection reports listed multiple doors that were not inspected due to access issues and multiple doors with deficiencies. The facility lacked corrective documentation at the time of the survey. Interview with the facility director on October 23, 2024, at 10:00 a.m., confirmed the facility lacked corrective documentation.”
-
Gas And Vacuum Piped Systems - Inspection And
The inspectors’ words, 215 words
“Gas and Vacuum Piped Systems - Inspection and CFR(s): NFPA 101 Gas and Vacuum Piped Systems - Inspection and Testing Operations The gas and vacuum systems are inspected and tested as part of a maintenance program and include the required elements. Records of the inspections and testing are maintained as required. 5.1.14.2.3, B.5.2, 5.2.13, 5.3.13, 5.3.13.4 (NFPA 99) This Standard is not met as evidenced by: 42642 Based on document review and interview, the facility failed to meet gas and vacuum-piped system requirements for one of one system. Findings include: Document review on October 23, 2024, at 9:01 a.m., revealed the following system deficiencies were documented on the April 24, 2024, inspection report. Corrective documentation was unavailable at the time of the survey: Outlets/Inlets A. Seventh floor, med surg - medical vacuum, W#2 bent faceplate; B. Seventh floor, med surg - oxygen, leak with the connector in; C. Third floor, OR 10 - nitrogen, CB#1 regulator knob broken; D. First floor, OR 3 - medical vacuum, medpipe boom service to further investigate low flow; E. Third floor, OR7- nitrogen, cb31 - N2 regulator knob missing; F. Third floor, peri op room 6- oxygen, CO#1 faceplate replacement required. Interview with the facilities director on October 23, 2024, at 9:01 a.m., confirmed the facility lacked corrective documentation.”
-
Electrical Systems - Other
The inspectors’ words, 141 words
“Electrical Systems - Other CFR(s): NFPA 101 Electrical Systems - Other List in the REMARKS section any NFPA 99 Chapter 6 Electrical Systems requirements that are not addressed by the provided K-Tags, but are deficient. This information, along with the applicable Life Safety Code or NFPA standard citation, should be included on Form CMS-2567. Chapter 6 (NFPA 99) This Standard is not met as evidenced by: 42642 Based on observation and interview, the facility failed to meet electrical system requirements in one of over ten storage rooms. Findings include: Observation on October 23, 2024, at 11:00 a.m., revealed the first floor storage room, located across from the lab window entrance, had blocked access to electrical panel “UPS C”. Reference: 70-110.26(A) Interview with the facility regional director on October 23, 2024, at 11:00 a.m., confirmed access to the electric panel was blocked.”
-
Electrical Systems - Receptacles
The inspectors’ words, 175 words
“Electrical Systems - Receptacles CFR(s): NFPA 101 Electrical Systems - Receptacles Power receptacles have at least one, separate, highly dependable grounding pole capable of maintaining low-contact resistance with its mating plug. In pediatric locations, receptacles in patient rooms, bathrooms, play rooms, and activity rooms, other than nurseries, are listed tamper-resistant or employ a listed cover. If used in patient care room, ground-fault circuit interrupters (GFCI) are listed. 6.3.2.2.6.2 (F), 6.3.2.2.4.2 (NFPA 99) This Standard is not met as evidenced by: 49939 Based on observation and interview, the facility failed to maintain two of more than twenty electrical receptacles. Findings include: Observation on October 23, 2024, between 12:36 p.m. and 12:38 p.m., revealed the facility could not verify that ground fault circuit interrupter (GFCI) receptacles were installed in the following locations: 1. (12:36 p.m.) Three south, third floor, clean utility room, receptacle within six feet of the sink; 2. (12:38 p.m.) Three south, third floor, laundry room, washing machine. Interview with the maintenance supervisor on October 23, 2024, at 12:38 p.m., confirmed the electrical outlet deficiencies.”
-
Electrical Equipment - Power Cords And Extens
The inspectors’ words, 247 words
“Electrical Equipment - Power Cords and Extens CFR(s): NFPA 101 Electrical Equipment - Power Cords and Extension Cords Power strips in a patient care vicinity are only used for components of movable patient-care-related electrical equipment (PCREE) assembles that have been assembled by qualified personnel and meet the conditions of 10.2.3.6. Power strips in the patient care vicinity may not be used for non-PCREE (e.g., personal electronics), except in long-term care resident rooms that do not use PCREE. Power strips for PCREE meet UL 1363A or UL 60601-1. Power strips for non-PCREE in the patient care rooms (outside of vicinity) meet UL 1363. In non-patient care rooms, power strips meet other UL standards. All power strips are used with general precautions. Extension cords are not used as a substitute for fixed wiring of a structure. Extension cords used temporarily are removed immediately upon completion of the purpose for which it was installed and meets the conditions of 10.2.4. 10.2.3.6 (NFPA 99), 10.2.4 (NFPA 99), 400-8 (NFPA 70), 590.3(D) (NFPA 70), TIA 12-5 This Standard is not met as evidenced by: 49939 Based on observation and interview, the facility failed to maintain electrical power cords in one of over twenty rooms. Findings include: Observation on October 23, 2024, at 12:19 p.m., revealed the three X, three north, third floor employee lounge had a microwave oven plugged into a surge protector power strip. Interview with the maintenance supervisor on October 23, 2024, at 12:19 p.m., confirmed the power cord deficiency.”
-
Gas Equipment - Cylinder And Container Storag
The inspectors’ words, 335 words
“Gas Equipment - Cylinder and Container Storag CFR(s): NFPA 101 Gas Equipment - Cylinder and Container Storage Greater than or equal to 3,000 cubic feet Storage locations are designed, constructed, and ventilated in accordance with 5.1.3.3.2 and 5.1.3.3.3. >300 but <3,000 cubic feet Storage locations are outdoors in an enclosure or within an enclosed interior space of non- or limited- combustible construction, with door (or gates outdoors) that can be secured. Oxidizing gases are not stored with flammables, and are separated from combustibles by 20 feet (5 feet if sprinklered) or enclosed in a cabinet of noncombustible construction having a minimum 1/2 hr. fire protection rating. Less than or equal to 300 cubic feet In a single smoke compartment, individual cylinders available for immediate use in patient care areas with an aggregate volume of less than or equal to 300 cubic feet are not required to be stored in an enclosure. Cylinders must be handled with precautions as specified in 11.6.2. A precautionary sign readable from 5 feet is on each door or gate of a cylinder storage room, where the sign includes the wording as a minimum “CAUTION: OXIDIZING GAS(ES) STORED WITHIN NO SMOKING.” Storage is planned so cylinders are used in order of which they are received from the supplier. Empty cylinders are segregated from full cylinders. When facility employs cylinders with integral pressure gauge, a threshold pressure considered empty is established. Empty cylinders are marked to avoid confusion. Cylinders stored in the open are protected from weather. 11.3.1, 11.3.2, 11.3.3, 11.3.4, 11.6.5 (NFPA 99) This Standard is not met as evidenced by: 49939 Based on observation and interview, the facility failed to maintain gas equipment storage requirements in one of four cylinder storage areas. Findings include: Observation on October 23, 2024, at 9:59 a.m., revealed the Tower building first-floor oxygen storage room, located near the chapel and outpatient nutritional room, contained six oxygen cylinders without quantity labeling. Interview with the maintenance supervisor on October 23, 2024, at 9:59 a.m., confirmed the deficiency.”
All 3 inspections in the last three years
| Date | Visit | What the record says |
|---|---|---|
| May 5, 2025 | Complaint inspection | No deficiencies cited |
| Oct 23, 2024 | Standard inspection | 18 deficiencies cited |
| Oct 16, 2024 | Standard inspection | No deficiencies cited |
How do patients fare?
- CMS’s overall CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System. for it is 2 of 5.
- Of the measures behind its CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System., CMS counts against the national value: mortality, 0 better and 0 worse of 8; safety of care, 1 better and 0 worse of 7; readmission, 0 better and 1 worse of 10.
- Patients rate it 3 of 5 in CMS’s patient survey (781 surveys completed, Oct 1, 2024 to Sep 30, 2025): 69% rated it 9 or 10 out of 10, and 68% would definitely recommend it.
- Infections, compared by CMS with the national benchmark (Oct 1, 2024 to Sep 30, 2025): central line bloodstream infections (CLABSI), no different than national benchmark; catheter urinary tract infections (CAUTI), no different than national benchmark; surgical site infections after colon surgery, no different than national benchmark; MRSA bloodstream infections, no different than national benchmark; C. diff infections, better than the national benchmark.
- CMS’s patient safety composite for serious complications, PSI 90, Jul 1, 2022 to Jun 30, 2024: no different than the national value.
- Deaths within 30 days, as CMS gives them (Jul 1, 2022 to Jun 30, 2025): heart attack 13.7%, heart failure 13%, pneumonia 16.2%, COPD 9.9%, stroke 12.4%, heart bypass surgery 3%. CMS gives no comparison with the national rate for them in this release.
- Readmissions within 30 days, as CMS gives them (Jul 1, 2023 to Jun 30, 2025): heart attack 14.6%, heart failure 21.9%, pneumonia 17.5%, COPD 20%, heart bypass surgery 10.3%, hip or knee replacement 5.8%. CMS gives no comparison with the national rate for them in this release.
- After outpatient care, compared by CMS: unplanned hospital visits after a colonoscopy, no different than the national rate; hospital admissions after outpatient chemotherapy, no different than the national rate; emergency visits after outpatient chemotherapy, no different than the national rate; unplanned hospital visits after outpatient surgery, no different than expected.
- Emergency department patients spent a median of 194 minutes there before leaving (Oct 1, 2024 to Sep 30, 2025), and 3% left before being seen.
- 53% of patients with severe sepsis or septic shock got the care CMS measures, SEP-1 (Oct 1, 2024 to Sep 30, 2025).
- Medicare’s spending per patient here is 0.94 times the national median (Jan 1, 2024 to Dec 31, 2024).
CMS, Hospital General Information, Patient survey (HCAHPS) - Hospital, Healthcare Associated Infections - Hospital, Timely and Effective Care - Hospital and Medicare Spending Per Beneficiary - Hospital. Released Aug 13, 2026. Updated quarterly.
CMS, Complications and Deaths - Hospital and Unplanned Hospital Visits - Hospital. Released Sep 30, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Overall ratingCMS’s overall hospital quality star rating, 1 to 5 | 2 of 5 |
| Patient survey ratingCMS star rating from its survey of the hospital’s patients (HCAHPS), 1 to 5 | 3 of 5 |
Is it certified, and in good standing?
- Medicare-certified acute care hospital since Jul 1, 1966.
- Ownership: voluntary non-profit - private.
- It is not accredited by a private organisation, so the state carries out its routine inspections for Medicare.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Voluntary non-profit - Private.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for hospitals.
- CMS cut its Medicare payments by 1% for fiscal year 2026 under the Hospital-Acquired Condition Reduction Program, which does so for the quarter of hospitals that fare worst on conditions patients get in hospital.
- None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
CMS, Hospital-Acquired Condition (HAC) Reduction Program. Released Aug 13, 2026. Updated yearly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
| Date | What | Detail |
|---|---|---|
| Medicare payment reduction (HAC Reduction Program) | Fiscal year 2026: 1% of Medicare payments |
What do patients say about their care?
- CMS doesn’t publish staffing levels for hospitals.
- In CMS’s patient survey, patients rate how well its nurses communicated 4 of 5.
- 68% of its health care workers got a flu shot (Oct 1, 2024 to Mar 31, 2025).
CMS, Patient survey (HCAHPS) - Hospital and Timely and Effective Care - Hospital. Released Aug 13, 2026. Updated quarterly.
Who owns it?
- Butler Health System owns 100% directly since Jun 13, 1983.
- 15 owners or officers are people: Debra Thompson (corporate officer); Julia Mccandless (managing employee (on the payroll)); Jeffrey Curry (corporate officer); Karen Campbell (managing employee (on the payroll)); John Sphon (corporate officer); James E Adisey (corporate officer); John C Reefer (corporate officer, 0%); William Scott Madden (corporate officer); Larry Richert (corporate officer, 0%); Teresa G Petrick (corporate officer); Timothy Morgus (corporate officer, 0%); Paul Bacharach (corporate officer); Kenneth Defurio (corporate officer); Kenneth Defurio (corporate director); Kenneth Defurio (managing employee (on the payroll)).
- CMS’s Provider of Services file records no change of ownership.
- No private-equity firm among the owners CMS lists.
- No real-estate investment trust among the owners CMS lists.
CMS, Hospital All Owners and Hospital Enrollments. Released Sep 29, 2026. Updated monthly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
| Organisation | Role | Share | Since |
|---|---|---|---|
| Butler Health System | Owns 5% or more directly | 100% | Jun 13, 1983 |
| Independence Health System | Owns 5% or more through other companies | 100% | Jan 1, 2023 |
How does it compare nearby?
- No other hospital CMS lists is in Butler County.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for hospitals, so none are shown. The one payment cut CMS publishes for each hospital, under its Hospital-Acquired Condition Reduction Program, is shown where it applies.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- Most hospitals are accredited by a private organisation (The Joint Commission, DNV and others) whose routine inspections stand in for the state’s; those reports aren’t public, and QCOR holds only the state’s surveys: no inspection on record here doesn’t mean none took place.
- QCOR says its hospital inspection data are complete only through September 17, 2026, while it moves to a new system.
- CMS doesn’t publish staffing levels for hospitals.
- In its September 2026 release CMS gives no comparison with the national rate for death and readmission rates, though it gives the rates.
Sources
-
Centers for Medicare & Medicaid Services, Hospital General Information (xubh-q36u).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (HCAHPS) - Hospital.
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Healthcare Associated Infections - Hospital (77hc-ibv8).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Complications and Deaths - Hospital (ynj2-r877).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Unplanned Hospital Visits - Hospital (632h-zaca).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Timely and Effective Care - Hospital (yv7e-xc69).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Medicare Spending Per Beneficiary - Hospital (rrqw-56er).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital-Acquired Condition (HAC) Reduction Program (yq43-i98g).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated yearly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Provider of Services File - Hospital & Non-Hospital Facilities (Hospital_and_other.DATA.Q3_2026.csv).
Released Oct 14, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Hospital 2567 statements of deficiencies (Hospital_2567s_2010_to_2026YTD.xlsx).
Released Oct 20, 2026 and checked Oct 27, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital All Owners (Hospital_All_Owners_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital Enrollments (Hospital_Enrollments_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Nov 5, 2026.
From the hospital
The public record above comes first. Anything the hospital adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the hospital will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the hospital”, and paying will never change a finding, a rating or the order of results.