Record last released by CMS on Oct 20, 2026.
- 2of 5 CMS’s overall rating
- 4of 5 patient survey rating
- 8 deficiencies cited in the last three years
- 46 beds
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Dec 11, 2025: a standard inspection.
8 deficiencies cited in the last three years.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
When those deficiencies happened
8 deficiencies in 1 month of the last 36. Last cited Dec 2025. Most serious: Standard-level. The last 3 years, to Nov 5, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Dec | |||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Dec 11, 2025: standard inspection8 deficiencies
-
Initial Comments - Not A Deficiency Citation
“Facility ID #297801 Component 01 Main Building Based on a Recertification Survey completed on December 11, 2025, it was determined that Independence Health System Clarion Hospital was not in compliance with the following requirements of the Life Safety Code for an existing acute and ambulatory health care occupancy. This is a two-story, Type II (222), fire resistive building, with two penthouses, that is fully sprinklered.”
-
Multiple Occupancies - Construction Type
The inspectors’ words, 242 words
“Multiple Occupancies - Construction Type CFR(s): NFPA 101 Multiple Occupancies - Construction Type Where separated occupancies are in accordance with 18/19.1.3.2 or 18/19.1.3.4, the most stringent construction type is provided throughout the building, unless a 2-hour separation is provided in accordance with 8.2.1.3, in which case the construction type is determined as follows: * The construction type and supporting construction of the health care occupancy is based on the story in which it is located in the building in accordance with 18/19.1.6 and Tables 18/19.1.6.1 * The construction type of the areas of the building enclosing the other occupancies shall be based on the applicable occupancy chapters. 18.1.3.5, 19.1.3.5, 8.2.1.3 This Standard is not met as evidenced by: 42642 Based on observation and interview, the facility failed to meet multiple occupancy requirements for one of one exit door between Component 01 and Component 99. Findings include: Observation on December 11, 2025, at 11:59 a.m., revealed the first floor building separation from Component 01 to Component 99 was the direction of egress from Component 01. The fire door does not have fire exit hardware allowing push-to-open access to the exit corridor. When the doors were closed, the left door was locked from the Component 01 side. The facility was unaware if the door could be unlocked in the event of an emergency. Interview with the maintenance technician on December 11, 2025, at 11:59 a.m., confirmed the deficiency at the time of the survey.”
-
Sprinkler System - Maintenance And Testing
The inspectors’ words, 241 words
“Sprinkler System - Maintenance and Testing CFR(s): NFPA 101 Sprinkler System - Maintenance and Testing Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available. a) Date sprinkler system last checked _____________________ b) Who provided system test ____________________________ c) Water system supply source __________________________ Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system. 9.7.5, 9.7.7, 9.7.8, and NFPA 25 This Standard is not met as evidenced by: 42642 Based on observation and interview, the facility failed to meet sprinkler system requirements on two of three building levels. Findings include: 1. Observation on December 11, 2025, between 9:10 a.m. and 11:40 a.m., revealed the sprinkler escutcheons were missing in the following locations: A (9:10 a.m.) First floor stock room; B.(10:00 a.m.) First floor ER corridor, near the exit; C. (10:47 a.m.) First floor, near X-ray 2; D. (11:40 a.m.) First floor kitchen. Interview with the maintenance technician on December 11, 2025, at 11:40 a.m., confirmed the locations were missing sprinkler escutcheons. 2. Observation on December 11, 2025, at 9:10 a.m. revealed the penthouse sprinkler line had wires taped to the sprinkler piping. Interview with the maintenance technician on December 11, 2025, at 9:10 a.m., confirmed the wires were taped to the sprinkler piping.”
-
Hvac
The inspectors’ words, 132 words
“HVAC CFR(s): NFPA 101 HVAC Heating, ventilation, and air conditioning shall comply with 9.2 and shall be installed in accordance with the manufacturer’s specifications. 18.5.2.1, 19.5.2.1, 9.2 This Standard is not met as evidenced by: 43722 Based on document review and interview, the facility failed to meet requirements for HVAC systems for one of one system. Findings include: Document review on December 11, 2025, at 10:08 a.m., revealed the facility was unable to provide fire/smoke damper inspection documentation for the new ER addition of the hospital. The dampers were newly installed in 2023 and need the one-year, after-install inspection. Interview with the maintenance director on December 11, 2025, at 10:08 a.m., confirmed the facility was unable to provide the documentation. The facility is in the process of scheduling a fire/smoke damper inspection.”
-
Maintenance, Inspection And Testing - Doors
The inspectors’ words, 172 words
“Maintenance, Inspection & Testing - Doors CFR(s): Maintenance, Inspection & Testing - Doors Fire doors assemblies are inspected and tested annually in accordance with NFPA 80, Standard for Fire Doors and Other Opening Protectives. Non-rated doors, including corridor doors to patient rooms and smoke barrier doors, are routinely inspected as part of the facility maintenance program. Individuals performing the door inspections and testing possess knowledge, training or experience that demonstrates ability. Written records of inspection and testing are maintained and are available for review. 19.7.6, 8.3.3.1 (LSC) 5.2, 5.2.3 (2010 NFPA 80) This Standard is not met as evidenced by: 42642 Based on observation and interview, the facility failed to meet requirements for maintenance, inspection, and testing of doors on one of three building levels. Findings include: Observation on December 11, 2025, at 10:03 a.m., revealed the second floor east wing fire door to delivery had multiple holes through the door. Interview with the maintenance technician on December 11, 2025, at 10:03 a.m., confirmed the deficiency at the time of the survey.”
-
Electrical Systems - Receptacles
The inspectors’ words, 158 words
“Electrical Systems - Receptacles CFR(s): NFPA 101 Electrical Systems - Receptacles Power receptacles have at least one, separate, highly dependable grounding pole capable of maintaining low-contact resistance with its mating plug. In pediatric locations, receptacles in patient rooms, bathrooms, play rooms, and activity rooms, other than nurseries, are listed tamper-resistant or employ a listed cover. If used in patient care room, ground-fault circuit interrupters (GFCI) are listed. 6.3.2.2.6.2 (F), 6.3.2.2.4.2 (NFPA 99) This Standard is not met as evidenced by: 42642 Based on observation and interview, the facility failed to meet electrical receptacle requirements on one of three building levels. Findings include: Observation on December 11, 2025, at 9:33 a.m., revealed the first floor OR 21 scrub room had receptacles located within six feet of the sink that were not protected by a ground fault circuit interrupter. Interview with the maintenance director on December 11, 2025, at 9:33 a.m., confirmed the deficiency at the time of the survey.”
-
Electrical Systems - Essential Electric Syste
The inspectors’ words, 321 words
“Electrical Systems - Essential Electric Syste CFR(s): NFPA 101 Electrical Systems - Essential Electric System Maintenance and Testing The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110. Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations. 6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) This Standard is not met as evidenced by: 43722 Based on document review and interview, the facility failed to meet essential electrical equipment requirements for one of two generators. Findings include: Document review on December 11, 2025, at 9:30 a.m., revealed the fuel sample, dated March 3, 2025, was rated as “action required” and required fuel polishing or filtration. The facility failed to have the deficiency corrected at the time of the survey. Interview with the maintenance director on December 11, 2025, at 9:30 a.m., confirmed the fuel sample deficiency was not corrected.”
-
Gas Equipment - Cylinder And Container Storag
The inspectors’ words, 333 words
“Gas Equipment - Cylinder and Container Storag CFR(s): NFPA 101 Gas Equipment - Cylinder and Container Storage Greater than or equal to 3,000 cubic feet Storage locations are designed, constructed, and ventilated in accordance with 5.1.3.3.2 and 5.1.3.3.3. >300 but <3,000 cubic feet Storage locations are outdoors in an enclosure or within an enclosed interior space of non- or limited- combustible construction, with door (or gates outdoors) that can be secured. Oxidizing gases are not stored with flammables, and are separated from combustibles by 20 feet (5 feet if sprinklered) or enclosed in a cabinet of noncombustible construction having a minimum 1/2 hr. fire protection rating. Less than or equal to 300 cubic feet In a single smoke compartment, individual cylinders available for immediate use in patient care areas with an aggregate volume of less than or equal to 300 cubic feet are not required to be stored in an enclosure. Cylinders must be handled with precautions as specified in 11.6.2. A precautionary sign readable from 5 feet is on each door or gate of a cylinder storage room, where the sign includes the wording as a minimum “CAUTION: OXIDIZING GAS(ES) STORED WITHIN NO SMOKING.” Storage is planned so cylinders are used in order of which they are received from the supplier. Empty cylinders are segregated from full cylinders. When facility employs cylinders with integral pressure gauge, a threshold pressure considered empty is established. Empty cylinders are marked to avoid confusion. Cylinders stored in the open are protected from weather. 11.3.1, 11.3.2, 11.3.3, 11.3.4, 11.6.5 (NFPA 99) This Standard is not met as evidenced by: 42642 Based on observation and interview, the facility failed to meet gas equipment requirements on one of three building levels. Findings include: Observation on December 11, 2025, at 10:33 a.m., revealed the second floor corridor oxygen storage failed to have distinct separation betwen full and empty cylinders. Interview with the maintenance director on December 11, 2025, at 10:33 a.m., confirmed the deficiency at the time of the survey.”
All 2 inspections in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Dec 11, 2025 | Standard inspection | 8 deficiencies cited |
| Dec 4, 2025 | Standard inspection | No deficiencies cited |
How do patients fare?
- CMS’s overall CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System. for it is 2 of 5.
- Of the measures behind its CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System., CMS counts against the national value: mortality, 0 better and 0 worse of 5; safety of care, 0 better and 0 worse of 2; readmission, 0 better and 1 worse of 8.
- Patients rate it 4 of 5 in CMS’s patient survey (261 surveys completed, Oct 1, 2024 to Sep 30, 2025): 66% rated it 9 or 10 out of 10, and 61% would definitely recommend it.
- Infections, compared by CMS with the national benchmark (Oct 1, 2024 to Sep 30, 2025): C. diff infections, no different than national benchmark.
- CMS’s patient safety composite for serious complications, PSI 90, Jul 1, 2022 to Jun 30, 2024: no different than the national value.
- Deaths within 30 days, as CMS gives them (Jul 1, 2022 to Jun 30, 2025): heart failure 11%, pneumonia 24.5%, stroke 14.3%. CMS gives no comparison with the national rate for them in this release.
- Readmissions within 30 days, as CMS gives them (Jul 1, 2023 to Jun 30, 2025): heart failure 22.4%, pneumonia 17.4%, COPD 20%. CMS gives no comparison with the national rate for them in this release.
- After outpatient care, compared by CMS: unplanned hospital visits after a colonoscopy, no different than the national rate; hospital admissions after outpatient chemotherapy, no different than the national rate; emergency visits after outpatient chemotherapy, no different than the national rate.
- Emergency department patients spent a median of 166 minutes there before leaving (Oct 1, 2024 to Sep 30, 2025), and 1% left before being seen.
- 69% of patients with severe sepsis or septic shock got the care CMS measures, SEP-1 (Oct 1, 2024 to Sep 30, 2025).
- Medicare’s spending per patient here is 0.95 times the national median (Jan 1, 2024 to Dec 31, 2024).
CMS, Hospital General Information, Patient survey (HCAHPS) - Hospital, Healthcare Associated Infections - Hospital, Timely and Effective Care - Hospital and Medicare Spending Per Beneficiary - Hospital. Released Aug 13, 2026. Updated quarterly.
CMS, Complications and Deaths - Hospital and Unplanned Hospital Visits - Hospital. Released Sep 30, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Overall ratingCMS’s overall hospital quality star rating, 1 to 5 | 2 of 5 |
| Patient survey ratingCMS star rating from its survey of the hospital’s patients (HCAHPS), 1 to 5 | 4 of 5 |
Is it certified, and in good standing?
- Medicare-certified acute care hospital since Jul 1, 1966.
- Ownership: voluntary non-profit - private.
- It is not accredited by a private organisation, so the state carries out its routine inspections for Medicare.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- It has an inpatient rehabilitation unit of 8 beds, which CMS lists apart as a rehabilitation facility.
- Voluntary non-profit - Private.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for hospitals.
- Not among the hospitals whose Medicare payments CMS cut under the Hospital-Acquired Condition Reduction Program for fiscal year 2026.
- None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
CMS, Hospital-Acquired Condition (HAC) Reduction Program. Released Aug 13, 2026. Updated yearly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
What do patients say about their care?
- CMS doesn’t publish staffing levels for hospitals.
- In CMS’s patient survey, patients rate how well its nurses communicated 5 of 5.
- 62% of its health care workers got a flu shot (Oct 1, 2024 to Mar 31, 2025).
CMS, Patient survey (HCAHPS) - Hospital and Timely and Effective Care - Hospital. Released Aug 13, 2026. Updated quarterly.
Who owns it?
- Butler Health System owns 100% directly since Dec 1, 2019.
- 15 owners or officers are people: Debra Thompson (corporate director); Julia Mccandless (managing employee (on the payroll), 0%); Jeffrey Curry (corporate director); Tana Webb (managing employee (on the payroll), 0%); Karen Campbell (managing employee (on the payroll), 0%); John Sphon (corporate director); James E Adisey (corporate director); John C Reefer (corporate director); William Scott Madden (runs it (operational or managerial control), 0%); Larry Richert (corporate director); Teresa G Petrick (corporate director); Timothy Morgus (corporate director); Paul Bacharach (corporate director); Kenneth Defurio (corporate director); Kenneth Defurio (runs it (operational or managerial control)).
- CMS’s Provider of Services file records 1 change of ownership.
- No private-equity firm among the owners CMS lists.
- No real-estate investment trust among the owners CMS lists.
CMS, Hospital All Owners and Hospital Enrollments. Released Sep 29, 2026. Updated monthly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
| Organisation | Role | Share | Since |
|---|---|---|---|
| Butler Health System | Owns 5% or more directly | 100% | Dec 1, 2019 |
| Independence Health System | Owns 5% or more through other companies | 100% | Jan 1, 2023 |
How does it compare nearby?
- Of the 2 hospitals CMS lists in Clarion County, 1 has an overall star rating from CMS: 1 rated 2 of 5.
- CMS rates this one 2 of 5.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
| Place | Overall star rating |
|---|---|
| Clarion Psychiatric Center | Not given |
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for hospitals, so none are shown. The one payment cut CMS publishes for each hospital, under its Hospital-Acquired Condition Reduction Program, is shown where it applies.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- Most hospitals are accredited by a private organisation (The Joint Commission, DNV and others) whose routine inspections stand in for the state’s; those reports aren’t public, and QCOR holds only the state’s surveys: no inspection on record here doesn’t mean none took place.
- QCOR says its hospital inspection data are complete only through September 17, 2026, while it moves to a new system.
- CMS doesn’t publish staffing levels for hospitals.
- In its September 2026 release CMS gives no comparison with the national rate for death and readmission rates, though it gives the rates.
Sources
-
Centers for Medicare & Medicaid Services, Hospital General Information (xubh-q36u).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (HCAHPS) - Hospital.
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Healthcare Associated Infections - Hospital (77hc-ibv8).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Complications and Deaths - Hospital (ynj2-r877).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Unplanned Hospital Visits - Hospital (632h-zaca).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Timely and Effective Care - Hospital (yv7e-xc69).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Medicare Spending Per Beneficiary - Hospital (rrqw-56er).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital-Acquired Condition (HAC) Reduction Program (yq43-i98g).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated yearly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Provider of Services File - Hospital & Non-Hospital Facilities (Hospital_and_other.DATA.Q3_2026.csv).
Released Oct 14, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Hospital 2567 statements of deficiencies (Hospital_2567s_2010_to_2026YTD.xlsx).
Released Oct 20, 2026 and checked Oct 27, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital All Owners (Hospital_All_Owners_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital Enrollments (Hospital_Enrollments_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Nov 5, 2026.
From the hospital
The public record above comes first. Anything the hospital adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the hospital will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the hospital”, and paying will never change a finding, a rating or the order of results.