Beaver County Memorial Hospital
A critical access hospital in Beaver, Oklahoma 73932
212 East 8th Street, Beaver, Oklahoma 73932. (580) 625-4551.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 20, 2026.
- Not rated CMS’s overall rating
- Not rated patient survey rating
- 8 deficiencies cited in the last three years
- 24 beds
Each figure’s source sits beside it, in its section below.
What these words mean2
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Nov 7, 2024: a standard inspection.
8 deficiencies cited in the last three years.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
When those deficiencies happened
8 deficiencies in 1 month of the last 36. Last cited Nov 2024. Most serious: Standard-level. The last 3 years, to Nov 5, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Dec | |||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Nov 7, 2024: standard inspection8 deficiencies
-
Initial Comments - Not A Deficiency Citation
“On 11/07/2024 OSDH surveyor conducted an unannounced CMS LSC survey at the Beaver County Memorial Hospital in Beaver, Oklahoma. Deficiencies were cited as a result of the survey. An exit conference was conducted on 11/07/2024 with the CEO and the director of maintenance. No other documentation was provided by the facility.”
-
Smoke Detection
The inspectors’ words, 150 words
“Smoke Detection CFR(s): NFPA 101 Smoke Detection 2012 EXISTING Smoke detection systems are provided in spaces open to corridors as required by 19.3.6.1. 19.3.4.5.2 This Standard is not met as evidenced by: 12713 Based on observation and interview, the facility failed to perform biannual smoke sensitivity test on smoke detectors. Without this biannual testing the facility had no assurance the smoke detectors would function as required for early detection of smoke/fire. Findings: 1. During record review on 11/07/2024, it was determined the last annual fire inspection dated 05/29/2024 did not document smoke sensitivity had been performed. The last documented smoke sensitivity was performed in 2019. 2. An interview was conducted with the maintenance supervisor on 11/07/2024 and he stated he contacted the inspection company and scheduled a sensitivity test. NFPA 72, Sec 7-3.2.1 requires that smoke detector sensitivity be checked within 1 year after installation and every alternate year thereafter.”
-
Sprinkler System - Maintenance And Testing
The inspectors’ words, 202 words
“Sprinkler System - Maintenance and Testing CFR(s): NFPA 101 Sprinkler System - Maintenance and Testing Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available. a) Date sprinkler system last checked _____________________ b) Who provided system test ____________________________ c) Water system supply source __________________________ Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system. 9.7.5, 9.7.7, 9.7.8, and NFPA 25 This Standard is not met as evidenced by: 12713 Based on record review and staff interview, the facility failed to maintain and test a complete automatic sprinkler system. Findings: 1. The facility records were reviewed on 11/07/2024. The most recent annual sprinkler inspection document was dated 05/29/2024. A quarterly sprinkler inspection should have been performed in the first quarter of 2024 and the third quarter of 2024, but no documentation was found for the two missing quarterly sprinkler inspections. 2. The maintenance supervisor was present during the record review on and stated he was not aware the quarterly sprinkler inspections had not been done.”
-
Subdivision Of Building Spaces - Smoke Barrie
The inspectors’ words, 247 words
“Subdivision of Building Spaces - Smoke Barrie CFR(s): NFPA 101 Subdivision of Building Spaces - Smoke Barrier Construction 2012 EXISTING Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier. 19.3.7.3, 8.6.7.1(1) Describe any mechanical smoke control system in REMARKS. This Standard is not met as evidenced by: 12713 Based on observation and interview, the facility failed to maintain 2 of 2 smoke barrier walls to resist the passage of smoke. Findings: 1. A tour of the facility was conducted on 11/07/2024, and the following observations were made. South smoke wall a) one unsealed penetration, associated with new electrical wiring was observed above the smoke doors in the attic. West smoke wall b) one unsealed penetration, associated with new electrical wiring was observed above the smoke doors in the attic. 2. The maintenance person was present when the smoke walls were observed on 11/07/2024, and he acknowledged the unsealed penetrations to the smoke wall. Smoke barriers shall be constructed to provide at least a one half hour fire resistance rating and constructed in accordance with 8.3. Smoke barriers shall be permitted to terminate at an atrium wall. Windows shall be protected by fire-rated glazing or by wired glass panels and steel frames. 8.3, 19.3.7.3, 19.3.7.5”
-
Maintenance, Inspection And Testing - Doors
The inspectors’ words, 258 words
“Maintenance, Inspection & Testing - Doors CFR(s): Maintenance, Inspection & Testing - Doors Fire doors assemblies are inspected and tested annually in accordance with NFPA 80, Standard for Fire Doors and Other Opening Protectives. Non-rated doors, including corridor doors to patient rooms and smoke barrier doors, are routinely inspected as part of the facility maintenance program. Individuals performing the door inspections and testing possess knowledge, training or experience that demonstrates ability. Written records of inspection and testing are maintained and are available for review. 19.7.6, 8.3.3.1 (LSC) 5.2, 5.2.3 (2010 NFPA 80) This Standard is not met as evidenced by: 12713 Based on record review and interview, the facility failed to conduct the routine inspections of the corridor doors throughout the facility. Findings: 1. The facility records were reviewed on 11/07/2024 and no documentation was found to show the facility had conducted routine corridor door inspections. 2. The facility CEO and maintenance supervisor were interviewed during the exit coference and they stated they are checking the corridor doors but they did not document. Maintenance, Inspection & Testing - Doors Fire doors assemblies are inspected and tested annually in accordance with NFPA 80, Standard for Fire Doors and Other Opening Protectives. Non-rated doors, including corridor doors to patient rooms and smoke barrier doors, are routinely inspected as part of the facility maintenance program. Individuals performing the door inspections and testing possess knowledge, training or experience that demonstrates ability. Written records of inspection and testing are maintained and are available for review. 19.7.6, 8.3.3.1 (LSC) 5.2, 5.2.3 (2010 NFPA 80)”
-
Fundamentals - Building System Categories
The inspectors’ words, 132 words
“Fundamentals - Building System Categories CFR(s): NFPA 101 Fundamentals - Building System Categories Building systems are designed to meet Category 1 through 4 requirements as detailed in NFPA 99. Categories are determined by a formal and documented risk assessment procedure performed by qualified personnel. Chapter 4 (NFPA 99) This Standard is not met as evidenced by: 12713 Based on record review and interview the facility failed to ensure the building system risk assessments were completed. Findings: Record review showed the facility EES (Essential Electrical System) and Medical Gas building system risk assessments were not completed and do not exist. On 11/07/2024 the surveyor asked the CEO for the EES and Medical Gas building system risk assessments. She stated they were not aware of the requirement but would ensure they will be completed.”
-
Electrical Systems - Maintenance And Testing
The inspectors’ words, 165 words
“Electrical Systems - Maintenance and Testing CFR(s): NFPA 101 Electrical Systems - Maintenance and Testing Hospital-grade receptacles at patient bed locations and where deep sedation or general anesthesia is administered, are tested after initial installation, replacement or servicing. Additional testing is performed at intervals defined by documented performance data. Receptacles not listed as hospital-grade at these locations are tested at intervals not exceeding 12 months. Line isolation monitors (LIM), if installed, are tested at intervals of less than or equal to 1 month by actuating the LIM test switch per 6.3.2.6.3.6, which activates both visual and audible alarm. For LIM circuits with automated self-testing, this manual test is performed at intervals less than or equal to 12 months. LIM circuits are tested per 6.3.3.3.2 after any repair or renovation to the electric distribution system. Records are maintained of required tests and associated repairs or modifications, containing date, room or area tested, and results. 6.3.4 (NFPA 99) This Standard is not met as evidenced by: 12713”
-
Electrical Systems - Essential Electric Syste
The inspectors’ words, 344 words
“Electrical Systems - Essential Electric Syste CFR(s): NFPA 101 Electrical Systems - Essential Electric System Maintenance and Testing The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110. Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations. 6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) This Standard is not met as evidenced by: 12713 Based on observation, record review and staff interview, the facility failed maintain appropriate documentation for the required monthly generator under load testing as required by NFPA 99. In the event of an electrical outage, the facility could not be assured the generator would function properly without performing the required inspections and testing. Findings: 1. The facility’s records were reviewed on 11/07/2024. No documentation was found to show the facility was performing the required monthly 30 minute under load testing of the generator. 2. The maintenance supervisor stated the generator automatically runs at times but he did not know if it ran under load for 30 minutes monthly.”
All 2 inspections in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Nov 7, 2024 | Standard inspection | 8 deficiencies cited |
| Sep 13, 2024 | Standard inspection | No deficiencies cited |
How do patients fare?
- CMS gives no overall CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.: “There are too few measures or measure groups reported to calculate a star rating or measure group score.”
- Of the measures behind its CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System., CMS counts against the national value: readmission, 0 better and 0 worse of 1.
- CMS gives no CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.: “The number of cases/patients is too few to report a star rating.”
- Emergency department patients spent a median of 114 minutes there before leaving (Oct 1, 2024 to Sep 30, 2025), and 1% left before being seen.
CMS, Hospital General Information, Patient survey (HCAHPS) - Hospital, Healthcare Associated Infections - Hospital, Timely and Effective Care - Hospital and Medicare Spending Per Beneficiary - Hospital. Released Aug 13, 2026. Updated quarterly.
CMS, Complications and Deaths - Hospital and Unplanned Hospital Visits - Hospital. Released Sep 30, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Overall ratingCMS’s overall hospital quality star rating, 1 to 5 | Not rated |
| Patient survey ratingCMS star rating from its survey of the hospital’s patients (HCAHPS), 1 to 5 | Not rated |
Is it certified, and in good standing?
- Medicare-certified critical access hospital since Aug 1, 2003.
- Ownership: government - hospital district or authority.
- It is not accredited by a private organisation, so the state carries out its routine inspections for Medicare.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Government - Hospital District or Authority.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for hospitals.
- CMS’s HAC Reduction Program file has no result for it: the program covers general acute care hospitals Medicare pays under its inpatient prospective payment system.
- None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
CMS, Hospital-Acquired Condition (HAC) Reduction Program. Released Aug 13, 2026. Updated yearly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
What do patients say about their care?
- CMS doesn’t publish staffing levels for hospitals.
- 44% of its health care workers got a flu shot (Oct 1, 2024 to Mar 31, 2025).
CMS, Patient survey (HCAHPS) - Hospital and Timely and Effective Care - Hospital. Released Aug 13, 2026. Updated quarterly.
Who owns it?
- 3 owners or officers are people: Karla Leisher (managing employee (on the payroll)); Alissa Schlessman (corporate officer); Alissa Schlessman (corporate director).
- CMS’s Provider of Services file records no change of ownership.
- No private-equity firm among the owners CMS lists.
- No real-estate investment trust among the owners CMS lists.
CMS, Hospital All Owners and Hospital Enrollments. Released Sep 29, 2026. Updated monthly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
How does it compare nearby?
- No other hospital CMS lists is in Beaver County.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for hospitals, so none are shown. The one payment cut CMS publishes for each hospital, under its Hospital-Acquired Condition Reduction Program, is shown where it applies.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- Most hospitals are accredited by a private organisation (The Joint Commission, DNV and others) whose routine inspections stand in for the state’s; those reports aren’t public, and QCOR holds only the state’s surveys: no inspection on record here doesn’t mean none took place.
- QCOR says its hospital inspection data are complete only through September 17, 2026, while it moves to a new system.
- CMS doesn’t publish staffing levels for hospitals.
Sources
-
Centers for Medicare & Medicaid Services, Hospital General Information (xubh-q36u).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (HCAHPS) - Hospital.
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Healthcare Associated Infections - Hospital (77hc-ibv8).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Complications and Deaths - Hospital (ynj2-r877).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Unplanned Hospital Visits - Hospital (632h-zaca).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Timely and Effective Care - Hospital (yv7e-xc69).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Medicare Spending Per Beneficiary - Hospital (rrqw-56er).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital-Acquired Condition (HAC) Reduction Program (yq43-i98g).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated yearly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Provider of Services File - Hospital & Non-Hospital Facilities (Hospital_and_other.DATA.Q3_2026.csv).
Released Oct 14, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Hospital 2567 statements of deficiencies (Hospital_2567s_2010_to_2026YTD.xlsx).
Released Oct 20, 2026 and checked Oct 27, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital All Owners (Hospital_All_Owners_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital Enrollments (Hospital_Enrollments_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Nov 5, 2026.
From the hospital
The public record above comes first. Anything the hospital adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the hospital will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the hospital”, and paying will never change a finding, a rating or the order of results.