Hearth Record

Glenbeigh Health Sources

An acute care hospital in Rock Creek, Ohio 44084

2863 State Route 45, Rock Creek, Ohio 44084. (440) 563-3400.

CMS’s own record, on Care Compare

Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.

The short answer

Record last released by CMS on Oct 20, 2026.

The last 24 months 9 deficiencies in 1 month of the last 36. Last cited Jun 2024. Most serious: Condition-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean3
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
Condition-level deficiency
For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual.

What did inspectors find?

The last inspection on record was on Jun 13, 2024: a standard inspection.

9 deficiencies cited in the last three years, 1 of them at condition level, the most serious.

1 deficiency at condition level, the more serious of CMS’s two levels

Source:

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

When those deficiencies happened

9 deficiencies in 1 month of the last 36. Last cited Jun 2024. Most serious: Condition-level. The last 3 years, to Nov 5, 2026.

9 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 Dec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOctNov

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

Jun 13, 2024: standard inspection3 deficiencies
  • Physical Environment

    The inspectors’ words, 144 words

    “PHYSICAL ENVIRONMENT CFR(s): 482.41 The hospital must be constructed, arranged, and maintained to ensure the safety of the patient, and to provide facilities for diagnosis and treatment and for special hospital services appropriate to the needs of the community. This Condition is not met as evidenced by: 22432 Based on review of facility schematics, facility observation, review of preventative maintenance documentation and staff Interview and confirmation, the facility failed to ensure: There must be emergency power and lighting in at least the operating, recovery, intensive care, and emergency rooms, and stairwells. In all other areas not serviced by the emergency supply source, battery lamps and flashlights must be available; and the hospital must maintain written evidence of regular inspection and approval by State or local fire control agencies. The facility capacity was 114 with a census of 71. See Tags at A-0702 and A-0715.”

    Rule A0700. Condition-level.

  • Emergency Power And Lighting

    The inspectors’ words, 284 words

    “EMERGENCY POWER AND LIGHTING CFR(s): 482.41(a)(1) There must be emergency power and lighting in at least the operating, recovery, intensive care, and emergency rooms, and stairwells. In all other areas not serviced by the emergency supply source, battery lamps and flashlights must be available. This Standard is not met as evidenced by: 22432 Based on observation and staff interview, the facility failed to maintain its generator in accordance with NFPA 101-2012 Edition section 7.9.2.4, NFPA 110-2010 Edition sections 5.6.5.6 and 5.6.5.6.1. This deficient practice had the potential to affect all 127 residents in the facility. Findings include: On 06/11/2024 at 1:45 P.M., observation during the facility tour with the Director of Maintenance revealed the facility’s generators were not equipped with remote manual stop stations. The Director of Maintenance verified the above finding at the time of observation. NFPA 101-2012 Edition, 7.9.2.4 Emergency generators providing power to emergency lighting systems shall be installed, tested, and maintained in accordance with NFPA 110, Standard for Emergency and Standby Power Systems. Stored electrical energy systems, where required in this Code, other than battery systems for emergency luminaries in accordance with 7.9.2.5, shall be installed and tested in accordance with NFPA 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems. NFPA 110-2010 Edition, 5.6.5.6* All installations shall have a remote manual stop station of a type to prevent inadvertent or unintentional operation located outside the room housing the prime mover, where so installed, or elsewhere on the premises where the prime mover is located outside the building. 5.6.5.6.1 The remote manual stop station shall be labeled. A.5.6.5.6 For systems located outdoors, the manual shutdown should be located external to the weatherproof enclosure and should be appropriately identified.”

    Rule A0702. Standard-level.

  • Regular Fire And Safety Inspections

    The inspectors’ words, 262 words

    “REGULAR FIRE AND SAFETY INSPECTIONS CFR(s): 482.41(b)(8) (6) The hospital must maintain written evidence of regular inspection and approval by State or local fire control agencies. This Standard is not met as evidenced by: 22432 Based on observations, record review the facility failed to ensure receptacles in resident rooms were tested in accordance with the LSC, 2012 Edition 7.9.2.4, 6.3.3.2. This deficient practice had the potential to affect all 127 residents in the facility. Findings include: On 06/11/2024 at 1:13 P. M., during record review the facility was unable to provide documentation showing completion of the required annual receptacle testing in patient care rooms. The Director of Maintenance verified the above findings at the time of record review. NFPA 101-2012 Edition, 7.9.2.4 Emergency generators providing power to emergency lighting systems shall be installed, tested, and maintained in accordance with NFPA 110, Standard for Emergency and Standby Power Systems. Stored electrical energy systems, where required in this Code, other than battery systems for emergency luminaries in accordance with 7.9.2.5, shall be installed and tested in accordance with NFPA 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems. 6.3.3.2 Receptacle Testing in Patient Care Rooms. 6.3.3.2.1 The physical integrity of each receptacle shall be confirmed by visual inspection. 6.3.3.2.2 The continuity of the grounding circuit in each electrical receptacle shall be verified. 6.3.3.2.3 Correct polarity of the hot and neutral connections in each electrical receptacle shall be confirmed. 6.3.3.2.4 The retention force of the grounding blade of each electrical receptacle (except locking-type receptacles) shall be not less than 115 g (4 oz).”

    Rule A0715. Standard-level.

Jun 12, 2024: standard inspection6 deficiencies
  • Initial Comments - Not A Deficiency Citation

    The inspectors’ words, 144 words

    “Amended 08/02/24 A Life Safety Code Recertification Survey was conducted by the Ohio Department of Health, between 06/11/2024 and 06/12/2024. Glenbeigh was found to not be in substantial compliance with the requirements for participation in Medicare/Medicaid at 42 CFR Subpart 482.41(b), Life Safety from Fire, and the 2012 edition of the National Fire Protection Association 101, Life Safety Code Chapter 18, New Health Care Occupancies. Recovery Glen is a fully sprinkled 1 story facility with no basement was determined to be of construction Type V (000) construction and located at 2863 STATE ROUTE 45 ROCK CREEK, OH 44084. The facility has smoke alarm, and fire alarm systems in place. The facility has three additional buildings, Main Building, Hope Lodge and Serenity Bay all were single story with no basement, fully sprinklered, smoke and Fire alarms in place, and were surveyed as type V(000) construction.”

    Rule K0000. Standard-level.

  • Initial Comments - Not A Deficiency Citation

    The inspectors’ words, 130 words

    “Ammended 08/02/24 A Life Safety Code Recertification Survey was conducted by the Ohio Department of Health, between 06/11/2024 and 06/12/2024. Glenbeigh was found to not be in substantial compliance with the requirements for participation in Medicare/Medicaid at 42 CFR Subpart 482.41(b), Life Safety from Fire, and the 2012 edition of the National Fire Protection Association 101, Life Safety Code Chapter 19, Existing Health Care Occupancies. This fully sprinkled 2 story facility with no basement was determined to be of construction Type II (000) construction. The facility has smoke alarm, and fire alarm systems in place. The facility has three additional buildings, Hope Lodge, Recovery Glen, and Serenity Bay all were single story with no basement, fully sprinklered, smoke and Fire alarms in place, and were surveyed as type V(000) construction.”

    Rule K0000. Standard-level.

  • Electrical Systems - Maintenance And Testing

    The inspectors’ words, 391 words

    “Electrical Systems - Maintenance and Testing CFR(s): NFPA 101 Electrical Systems - Maintenance and Testing Hospital-grade receptacles at patient bed locations and where deep sedation or general anesthesia is administered, are tested after initial installation, replacement or servicing. Additional testing is performed at intervals defined by documented performance data. Receptacles not listed as hospital-grade at these locations are tested at intervals not exceeding 12 months. Line isolation monitors (LIM), if installed, are tested at intervals of less than or equal to 1 month by actuating the LIM test switch per 6.3.2.6.3.6, which activates both visual and audible alarm. For LIM circuits with automated self-testing, this manual test is performed at intervals less than or equal to 12 months. LIM circuits are tested per 6.3.3.3.2 after any repair or renovation to the electric distribution system. Records are maintained of required tests and associated repairs or modifications, containing date, room or area tested, and results. 6.3.4 (NFPA 99) This Standard is not met as evidenced by: 44541 Based on observations, record review the facility failed to ensure receptacles in resident rooms were tested in accordance with the LSC, 2012 Edition 7.9.2.4, 6.3.3.2. This deficient practice had the potential to affect all 127 residents in the facility. Findings include: On 06/11/2024 at 1:13 P.M., during record review the facility was unable to provide documentation showing completion of the required annual receptacle testing in patient care rooms. The Director of Maintenance verified the above findings at the time of record review. NFPA 101-2012 Edition, 7.9.2.4 Emergency generators providing power to emergency lighting systems shall be installed, tested, and maintained in accordance with NFPA 110, Standard for Emergency and Standby Power Systems. Stored electrical energy systems, where required in this Code, other than battery systems for emergency luminaries in accordance with 7.9.2.5, shall be installed and tested in accordance with NFPA 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems. 6.3.3.2 Receptacle Testing in Patient Care Rooms. 6.3.3.2.1 The physical integrity of each receptacle shall be confirmed by visual inspection. 6.3.3.2.2 The continuity of the grounding circuit in each electrical receptacle shall be verified. 6.3.3.2.3 Correct polarity of the hot and neutral connections in each electrical receptacle shall be confirmed. 6.3.3.2.4 The retention force of the grounding blade of each electrical receptacle (except locking-type receptacles) shall be not less than 115 g (4 oz).”

    Rule K0914. Standard-level.

  • Electrical Systems - Maintenance And Testing

    The inspectors’ words, 393 words

    “Electrical Systems - Maintenance and Testing CFR(s): NFPA 101 Electrical Systems - Maintenance and Testing Hospital-grade receptacles at patient bed locations and where deep sedation or general anesthesia is administered, are tested after initial installation, replacement or servicing. Additional testing is performed at intervals defined by documented performance data. Receptacles not listed as hospital-grade at these locations are tested at intervals not exceeding 12 months. Line isolation monitors (LIM), if installed, are tested at intervals of less than or equal to one month by actuating the LIM test switch per 6.3.2.6.3.6, which activates both visual and audible alarm. For LIM circuits with automated self-testing, this manual test is performed at intervals less than or equal to 12 months. LIM circuits are tested per 6.3.3.3.2 after any repair or renovation to the electric distribution system. Records are maintained of required tests and associated repairs or modifications, containing date, room or area tested, and results. 6.3.4 (NFPA 99) This Standard is not met as evidenced by: 44541 Amended 08/02/24 Based on observations, record review the facility failed to ensure receptacles in resident rooms were tested in accordance with the LSC, 2012 Edition 7.9.2.4, 6.3.3.2. This deficient practice had the potential to affect all 127 residents in the facility. Findings include: On 06/11/2024 at 1:13 P.M., during record review the facility was unable to provide documentation showing completion of the required annual receptacle testing in patient care rooms. The Director of Maintenance verified the above findings at the time of record review. NFPA 101-2012 Edition, 7.9.2.4 Emergency generators providing power to emergency lighting systems shall be installed, tested, and maintained in accordance with NFPA 110, Standard for Emergency and Standby Power Systems. Stored electrical energy systems, where required in this Code, other than battery systems for emergency luminaries in accordance with 7.9.2.5, shall be installed and tested in accordance with NFPA 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems. 6.3.3.2 Receptacle Testing in Patient Care Rooms. 6.3.3.2.1 The physical integrity of each receptacle shall be confirmed by visual inspection. 6.3.3.2.2 The continuity of the grounding circuit in each electrical receptacle shall be verified. 6.3.3.2.3 Correct polarity of the hot and neutral connections in each electrical receptacle shall be confirmed. 6.3.3.2.4 The retention force of the grounding blade of each electrical receptacle (except locking-type receptacles) shall be not less than 115 g (4 oz).”

    Rule K0914. Standard-level.

  • Electrical Systems - Essential Electric Syste

    The inspectors’ words, 468 words

    “Electrical Systems - Essential Electric Syste CFR(s): NFPA 101 Electrical Systems - Essential Electric System Maintenance and Testing The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110. Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations. 6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) This Standard is not met as evidenced by: 44541 Based on observation and staff interview, the facility failed to maintain its generator in accordance with NFPA 101-2012 Edition section 7.9.2.4, NFPA 110-2010 Edition sections 5.6.5.6 and 5.6.5.6.1. This deficient practice had the potential to affect all 127 residents in the facility. Findings include: On 06/11/2024 at 1:45 P.M., observation during the facility tour with the Director of Maintenance revealed the facility’s generators were not equipped with remote manual stop stations. The Director of Maintenance verified the above finding at the time of observation. NFPA 101-2012 Edition, 7.9.2.4 Emergency generators providing power to emergency lighting systems shall be installed, tested, and maintained in accordance with NFPA 110, Standard for Emergency and Standby Power Systems. Stored electrical energy systems, where required in this Code, other than battery systems for emergency luminaries in accordance with 7.9.2.5, shall be installed and tested in accordance with NFPA 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems. NFPA 110-2010 Edition, 5.6.5.6* All installations shall have a remote manual stop station of a type to prevent inadvertent or unintentional operation located outside the room housing the prime mover, where so installed, or elsewhere on the premises where the prime mover is located outside the building. 5.6.5.6.1 The remote manual stop station shall be labeled. A.5.6.5.6 For systems located outdoors, the manual shutdown should be located external to the weatherproof enclosure and should be appropriately identified.”

    Rule K0918. Standard-level.

  • Electrical Systems - Essential Electric Syste

    The inspectors’ words, 470 words

    “Electrical Systems - Essential Electric Syste CFR(s): NFPA 101 Electrical Systems - Essential Electric System Maintenance and Testing The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110. Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations. 6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) This Standard is not met as evidenced by: 44541 Amended 08/02/24 Based on observation and staff interview, the facility failed to maintain its generator in accordance with NFPA 101-2012 Edition section 7.9.2.4, NFPA 110-2010 Edition sections 5.6.5.6 and 5.6.5.6.1. This deficient practice had the potential to affect all 127 residents in the facility. Findings include: On 06/11/2024 at 1:45 P.M., observation during the facility tour with the Director of Maintenance revealed the facility’s generators were not equipped with remote manual stop stations. The Director of Maintenance verified the above finding at the time of observation. NFPA 101-2012 Edition, 7.9.2.4 Emergency generators providing power to emergency lighting systems shall be installed, tested, and maintained in accordance with NFPA 110, Standard for Emergency and Standby Power Systems. Stored electrical energy systems, where required in this Code, other than battery systems for emergency luminaries in accordance with 7.9.2.5, shall be installed and tested in accordance with NFPA 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems. NFPA 110-2010 Edition, 5.6.5.6* All installations shall have a remote manual stop station of a type to prevent inadvertent or unintentional operation located outside the room housing the prime mover, where so installed, or elsewhere on the premises where the prime mover is located outside the building. 5.6.5.6.1 The remote manual stop station shall be labeled. A.5.6.5.6 For systems located outdoors, the manual shutdown should be located external to the weatherproof enclosure and should be appropriately identified.”

    Rule K0918. Standard-level.

All 2 inspections in the last three years
Inspections on record
DateVisitWhat the record says
Jun 13, 2024Standard inspection3 deficiencies cited
Jun 12, 2024Standard inspection6 deficiencies cited

How do patients fare?

  • CMS gives no overall : “There are too few measures or measure groups reported to calculate a star rating or measure group score.”
  • Of the measures behind its , CMS counts against the national value: mortality, 0 better and 0 worse of 1; safety of care, 1 better and 0 worse of 1; readmission, 0 better and 0 worse of 1.
  • CMS gives no : “Results are not available for this reporting period.”
  • Infections, compared by CMS with the national benchmark (Oct 1, 2024 to Sep 30, 2025): MRSA bloodstream infections, no different than national benchmark; C. diff infections, better than the national benchmark.
  • Medicare’s spending per patient here is 0.78 times the national median (Jan 1, 2024 to Dec 31, 2024).
Ratings and measures, as published
MeasureRating
Overall ratingCMS’s overall hospital quality star rating, 1 to 5Not rated
Patient survey ratingCMS star rating from its survey of the hospital’s patients (HCAHPS), 1 to 5Not rated

Is it certified, and in good standing?

  • Medicare-certified acute care hospital since Apr 1, 1992.
  • Ownership: proprietary.
  • It is not accredited by a private organisation, so the state carries out its routine inspections for Medicare.
  • Cited at in the last three years: it didn’t meet a whole condition of Medicare’s rules for hospitals.
  • Proprietary.
Source:

CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.

CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

Has it been penalized?

  • CMS doesn’t publish fines or other penalties for hospitals.
  • Not among the hospitals whose Medicare payments CMS cut under the Hospital-Acquired Condition Reduction Program for fiscal year 2026.
  • None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
Source:

CMS, Hospital-Acquired Condition (HAC) Reduction Program. Released Aug 13, 2026. Updated yearly.

CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

What do patients say about their care?

  • CMS doesn’t publish staffing levels for hospitals.
  • 85% of its health care workers got a flu shot (Oct 1, 2024 to Mar 31, 2025).
Source:

CMS, Patient survey (HCAHPS) - Hospital and Timely and Effective Care - Hospital. Released Aug 13, 2026. Updated quarterly.

Who owns it?

  • Ashtabula County Medical Center runs it.
  • 21 owners or officers are people: Katherine Hancock (corporate director); Craig Sernik (corporate director); Nancy Kister (corporate director); Ryan Miller (corporate director); Emily Wood (managing employee (on the payroll)); Donald Chaplin (corporate director); James Timonere (corporate director); Shinoj Pattali Jayavalsan (corporate officer); Shinoj Pattali Jayavalsan (managing employee (on the payroll)); Jospeh Giangola (corporate director); Alanna Dames (corporate officer); Brian Jeffrey Harte (corporate officer); David J Novak (managing employee (on the payroll)); Sarah Bogardus (corporate officer); Vernon Palo (corporate director); James Pearson (corporate officer); David Pontius (corporate director); Richard Trice (corporate director); Richard Trice (managing employee (on the payroll)); William Anderson (corporate officer); Leonard Stepp (corporate officer).
  • CMS’s Provider of Services file records 2 changes of ownership.
  • No private-equity firm among the owners CMS lists.
  • No real-estate investment trust among the owners CMS lists.
Source:

CMS, Hospital All Owners and Hospital Enrollments. Released Sep 29, 2026. Updated monthly.

CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.

Organisations CMS lists
OrganisationRoleShareSince
Ashtabula County Medical CenterRuns it (operational or managerial control)100%Apr 1, 1992

How does it compare nearby?

  • Of the 5 hospitals CMS lists in Ashtabula County, 3 have an overall star rating from CMS: 2 rated 4 of 5, 1 rated 3 of 5.
  • CMS gives this hospital no overall star rating to compare.
Source:

CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for hospitals, so none are shown. The one payment cut CMS publishes for each hospital, under its Hospital-Acquired Condition Reduction Program, is shown where it applies.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • Most hospitals are accredited by a private organisation (The Joint Commission, DNV and others) whose routine inspections stand in for the state’s; those reports aren’t public, and QCOR holds only the state’s surveys: no inspection on record here doesn’t mean none took place.
  • QCOR says its hospital inspection data are complete only through September 17, 2026, while it moves to a new system.
  • CMS doesn’t publish staffing levels for hospitals.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Nov 5, 2026.

From the hospital

The public record above comes first. Anything the hospital adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the hospital will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the hospital”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 28, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.