Cherry County Hospital
A critical access hospital in Valentine, Nebraska 69201
510 North Green St, Valentine, Nebraska 69201. (402) 376-2525.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 20, 2026.
- Not rated CMS’s overall rating
- 4of 5 patient survey rating
- 6 deficiencies cited in the last three years
- 21 beds
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on May 22, 2025: a standard inspection.
6 deficiencies cited in the last three years.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
When those deficiencies happened
6 deficiencies in 1 month of the last 36. Last cited May 2025. Most serious: Standard-level. The last 3 years, to Nov 5, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Dec | |||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
May 22, 2025: standard inspection1 deficiency
-
Comp Assessment, Care Plan & Discharge
The inspectors’ words, 1,598 words
“COMP ASSESSMENT, CARE PLAN & DISCHARGE CFR(s): §485.645(d)(5) Comprehensive assessment, comprehensive care plan, and discharge planning (§483.20(b), and §483.21(b) and (c)(2) of this chapter), except that the CAH is not required to use the resident assessment instrument (RAI) specified by the State that is required under §483.20(b), or to comply with the requirements for frequency, scope, and number of assessments prescribed in §413.343(b) of this chapter). “ §483.20(b) Comprehensive assessments- (1) Resident assessment instrument. A facility must make a comprehensive assessment of a resident’s needs, strengths, goals, life history and preferences, using the resident assessment instrument (RAI) specified by CMS. The assessment must include at least the following: (i) Identification and demographic information. (ii) Customary routine. (iii) Cognitive patterns. (iv) Communication. (v) Vision. (vi) Mood and behavior patterns. (vii) Psychosocial well-being. (viii) Physical functioning and structural problems. (ix) Continence. (x) Disease diagnoses and health conditions. (xi) Dental and nutritional status. (xii) Skin condition. (xiii) Activity pursuit. (xiv) Medications. (xv) Special treatments and procedures. (xvi) Discharge planning. (xvii) Documentation of summary information regarding the additional assessment performed on the care areas triggered by the completion of the Minimum Data Set (MDS). (xviii) Documentation of participation in assessment. The assessment process must include direct observation and communication with the resident, as well as communication with licensed and nonlicensed direct care staff members on all shifts. (2) When required. Subject to the timeframes prescribed in §413.343(b) of this chapter, a facility must conduct a comprehensive assessment of a resident in accordance with the timeframes specified in paragraphs (b)(2) (i) through (iii) of this section. The timeframes prescribed in §413.343(b) of this chapter do not apply to CAHs. (i) Within 14 calendar days after admission, excluding readmissions in which there is no significant change in the resident’s physical or mental condition. (For purposes of this section, “readmission” means a return to the facility following a temporary absence for hospitalization or for therapeutic leave.) (ii) Within 14 calendar days after the facility determines, or should have determined, that there has been a significant change in the resident’s physical or mental condition. (For purposes of this section, a “significant change” means a major decline or improvement in the resident’s status that will not normally resolve itself without further intervention by staff or by implementing standard disease-related clinical interventions, that has an impact on more than one area of the resident’s health status, and requires interdisciplinary review or revision of the care plan, or both.) (iii) Not less often than once every 12 months. “ §483.21(b) Comprehensive care plans. (1) The facility must develop and implement a comprehensive person-centered care plan for each resident, consistent with the resident rights set forth at §483.10(c)(2) and §483.10(c)(3), that includes measurable objectives and timeframes to meet a resident’s medical, nursing, and mental and psychosocial needs that are identified in the comprehensive assessment. The comprehensive care plan must describe the following: (i) The services that are to be furnished to attain or maintain the resident’s highest practicable physical, mental, and psychosocial well-being as required under §483.24, §483.25, or §483.40; and (ii) Any services that would otherwise be required under §483.24, §483.25, or §483.40 but are not provided due to the resident’s exercise of rights under §483.10, including the right to refuse treatment under §483.10(c)(6). (i) Any specialized services or specialized rehabilitative services the nursing facility will provide as a result of PASARR recommendations. If a facility disagrees with the findings of the PASARR, it must indicate its rationale in the resident’s medical record. (ii) In consultation with the resident and the resident’s representative(s)- (A) The resident’s goals for admission and desired outcomes. (B) The resident’s preference and potential for future discharge. Facilities must document whether the resident’s desire to return to the community was assessed and any referrals to local contact agencies and/or other appropriate entities, for this purpose. (C) Discharge plans in the comprehensive care plan, as appropriate, in accordance with the requirements set forth in paragraph (c) of this section. (2) A comprehensive care plan must be- (i) Developed within 7 days after completion of the comprehensive assessment. (ii) Prepared by an interdisciplinary team, that includes but is not limited to- (A) The attending physician. (B) A registered nurse with responsibility for the resident. (C) A nurse aide with responsibility for the resident. (D) A member of food and nutrition services staff. (E) To the extent practicable, the participation of the resident and the resident’s representative(s). An explanation must be included in a resident’s medical record if the participation of the resident and their resident representative is determined not practicable for the development of the resident’s care plan. (F) Other appropriate staff or professionals in disciplines as determined by the resident’s needs or as requested by the resident. (iii) Reviewed and revised by the interdisciplinary team after each assessment, including both the comprehensive and quarterly review assessments. (3) The services provided or arranged by the facility, as outlined by the comprehensive care plan, must- (i) Meet professional standards of quality. (ii) Be provided by qualified persons in accordance with each resident’s written plan of care. (iii) Be culturally-competent and trauma-informed. “ §483.21(c)(2) Discharge summary. When the facility anticipates discharge a resident must have a discharge summary that includes, but is not limited to, the following: (i) A recapitulation of the resident’s stay that includes, but is not limited to, diagnoses, course of illness/treatment or therapy, and pertinent lab, radiology, and consultation results. (ii) A final summary of the resident’s status to include items in paragraph (b)(1) of §483.20, at the time of the discharge that is available for release to authorized persons and agencies, with the consent of the resident or resident’s representative. (iii) Reconciliation of all pre-discharge medications with the resident’s post-discharge medications (both prescribed and over-the-counter). (iv) A post-discharge plan of care that is developed with the participation of the resident and, with the resident’s consent, the resident representative(s), which will assist the resident to adjust to his or her new living environment. The post-discharge plan of care must indicate where the individual plans to reside, any arrangements that have been made for the resident’s follow up care and any post-discharge medical and non-medical services. This Standard is not met as evidenced by: 46123 Based on medical record review, facility policy review and staff interview the Critical Access Hospital (CAH) failed to ensure a complete discharge summary for 4 of 4 swing bed patients (Patients 32, 33, 35 and 36) reviewed. This failed practice had the potential to affect all swing bed patients at the CAH. The number of swing bed patients at the CAH for Fiscal Year 24 was 54 swing bed patients. Findings are: A. Review of Patient 32’s medical record (5/21/25 at 5:00 PM) revealed a swing bed admission of 12/31/24 - 2/14/25 for a right distal femur fracture (a broken thigh bone that happens near the knee joint). Review of the entire medical record revealed a lack of evidence of a complete discharge summary of the patients stay that included a final summary of the patient’s status with all comprehensive assessment requirements documented (Customary routine, communication, mood and behavior patterns, disease diagnoses and health conditions, skin condition, and reconciliation of all pre-discharge medications with the post discharge medications). - Review of Patient 33’s medical record (5/22/25) revealed a swing bed admission of 1/22/25 - 1/27/25 for a catheter associated urinary tract infection and clostridioides difficile (c-diff a serious infection leading to diarrhea and inflammation of the colon). Review of the entire medical record revealed a lack of evidence of a complete discharge summary of the patients stay that included a final summary of the patient’s status with all comprehensive assessment requirements documented (customary routine, mood and behavior patterns, skin condition, and reconciliation of all pre-discharge medications with the post discharge medications). - Review of Patient 35’s medical record (5/22/25) revealed a swing bed admission of 4/30/25 - 5/5/25 for pneumonia needing intravenous antibiotics (antibiotics given through a catheter in the vein). Review of the entire medical record revealed a lack of evidence of a complete discharge summary of the patients stay that included a final summary of the patient’s status with all comprehensive assessment requirements documented (customary routine, vision, continence, skin condition, and reconciliation of all pre-discharge medications with the post discharge medications). - Review of Patient 36’s medical record (5/22/25) revealed a swing bed admission of 2/3/25 - 2/27/25 for congestive heart failure exacerbation (CHF - the heart is unable to pump enough blood to meet the body’s needs with a sudden worsening of symptoms such as shortness of breath, fatigue, swelling in extremities and persistent cough). Review of the entire medical record revealed a lack of evidence of a complete discharge summary of the patients stay that included a final summary of the patient’s status with all comprehensive assessment requirements documented (customary routine, mood and behavioral pattern, continence, skin condition, and reconciliation of all pre-discharge medications with the post discharge medications). B. Review of facility policy Discharge Summary Policy (Effective Date: 5/20/2025) revealed, the discharge summary will include a synopsis of the patient’s swing bed stay, disposition, plans for continuity of care and condition at the time of discharge. Additional pages may be attached. C. Interview with Chief Nursing Officer (CNO) (5/22/25 at 11:05AM) revealed, the current swing bed policies provided on request are all the facility has. CNO has started to review policies but was unaware that policies were from outdated regulations. -Interview with RN-A (5/22/25 at 11:20AM) revealed, all printed documents requested for swing bed patients are the complete discharge summary or recapitulation of the patient stay.”
May 21, 2025: standard inspection5 deficiencies
-
Hospital Cah And Ltc Emergency Power
The inspectors’ words, 641 words
“Hospital CAH and LTC Emergency Power CFR(s): §482.15(e) Condition for Participation: (e) Emergency and standby power systems. The hospital must implement emergency and standby power systems based on the emergency plan set forth in paragraph (a) of this section and in the policies and procedures plan set forth in paragraphs (b)(1)(i) and (ii) of this section. §483.73(e), §485.625(e), §485.542(e) (e) Emergency and standby power systems. The [LTC facility CAH and REH] must implement emergency and standby power systems based on the emergency plan set forth in paragraph (a) of this section. §482.15(e)(1), §483.73(e)(1), §485.542(e)(1), §485.625(e)(1) Emergency generator location. The generator must be located in accordance with the location requirements found in the Health Care Facilities Code (NFPA 99 and Tentative Interim Amendments TIA 12-2, TIA 12-3, TIA 12-4, TIA 12-5, and TIA 12-6), Life Safety Code (NFPA 101 and Tentative Interim Amendments TIA 12-1, TIA 12-2, TIA 12-3, and TIA 12-4), and NFPA 110, when a new structure is built or when an existing structure or building is renovated. 482.15(e)(2), §483.73(e)(2), §485.625(e)(2), §485.542(e)(2) Emergency generator inspection and testing. The [hospital, CAH and LTC facility] must implement the emergency power system inspection, testing, and [maintenance] requirements found in the Health Care Facilities Code, NFPA 110, and Life Safety Code. 482.15(e)(3), §483.73(e)(3), §485.625(e)(3),§485.542(e)(2) Emergency generator fuel. [Hospitals, CAHs and LTC facilities] that maintain an onsite fuel source to power emergency generators must have a plan for how it will keep emergency power systems operational during the emergency, unless it evacuates. *[For hospitals at §482.15(h), LTC at §483.73(g), REHs at §485.542(g), and and CAHs §485.625(g):] The standards incorporated by reference in this section are approved for incorporation by reference by the Director of the Office of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. You may obtain the material from the sources listed below. You may inspect a copy at the CMS Information Resource Center, 7500 Security Boulevard, Baltimore, MD or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. If any changes in this edition of the Code are incorporated by reference, CMS will publish a document in the Federal Register to announce the changes. (1) National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169, www.nfpa.org, 1.617.770.3000. (i) NFPA 99, Health Care Facilities Code, 2012 edition, issued August 11, 2011. (ii) Technical interim amendment (TIA) 12-2 to NFPA 99, issued August 11, 2011. (iii) TIA 12-3 to NFPA 99, issued August 9, 2012. (iv) TIA 12-4 to NFPA 99, issued March 7, 2013. (v) TIA 12-5 to NFPA 99, issued August 1, 2013. (vi) TIA 12-6 to NFPA 99, issued March 3, 2014. (vii) NFPA 101, Life Safety Code, 2012 edition, issued August 11, 2011. (viii) TIA 12-1 to NFPA 101, issued August 11, 2011. (ix) TIA 12-2 to NFPA 101, issued October 30, 2012. (x) TIA 12-3 to NFPA 101, issued October 22, 2013. (xi) TIA 12-4 to NFPA 101, issued October 22, 2013. (xiii) NFPA 110, Standard for Emergency and Standby Power Systems, 2010 edition, including TIAs to chapter 7, issued August 6, 2009.. This Standard is not met as evidenced by: 39858 Based on record review and interview, the facility failed to conduct required specific gravity testing of the electrolyte of the starting batteries for the emergency generator. This deficient practice would not ensure the emergency generator would operate upon loss of normal power. The facility had a census of 6 on the day of survey. Findings are: During record review on 5-21-25 at 2:39 pm, the facility failed to produce documentation to assure the specific testing of the electrolyte of the batteries for the emergency generator was conducted monthly. During an interview on 5-21-25 at 2:39 pm, Maintenance Staff A and B confirmed the lack of testing.”
-
Initial Comments - Not A Deficiency Citation
The inspectors’ words, 266 words
“42 CFR 482.41. The facility must meet the applicable provisions of the 2012 Edition of the Life Safety Code of the National Fire Protection Association. This facility is governed by Chapter 18, New Health Care Occupancies of the 2012 Edition of the National Fire Protection Association [NFPA], Chapter 101: Life Safety Code. Cherry County Hospital is a single story building of Type II (111) non-combustible construction. There are two areas that would be considered a second story. These two areas contain HVAC systems only and are only accessible to Maintenance Personnel. These two areas are 100% fire sprinkler protected, and protected by the facility’s smoke detection devices. Cherry County Hospital was constructed in 1975, with building additions in 1994, 1997, 2006. A major remodel of the existing building and a new building addition was completed in 2019. Facility is 100% fire sprinklered protected, all corridors, lobbies, dining, and areas open to the corridor are protected by smoke detection devices interconnected to the buildings fire alarm system. The facility has a Physicians Clinic attached to the hospital. This clinic is separated by a two-hour fire separation wall with 1 1/2 hour fire rated doors located in the corridors. The fire alarm system and fire sprinkler system are interconnected to transmit the alarm throughout the building, and to the local 911 Center for dispatching the local fire department. Cherry County Hospital was found to be not in compliance with the requirements for participation in Medicare / Medicaid at 42 CFR 482.41 Life Safety from Fire, and the related National Fire Protection Association (NFPA) Standard 101 - 2012 edition”
-
Emergency Lighting
The inspectors’ words, 184 words
“Emergency Lighting CFR(s): NFPA 101 Emergency Lighting Emergency lighting of at least 1-1/2-hour duration is provided automatically in accordance with 7.9. 18.2.9.1, 19.2.9.1 This Standard is not met as evidenced by: 39858 Based on observation and interview, the facility failed to provide battery powered emergency lighting in the maintenance / electrical rooms where the controls and switches for the emergency generator are located. This deficient practice would cause confusion and delay repairs to the generator equipment in the event of a generator failure during an emergency. The facility had a census of 6 on the date of survey. Findings are: Observation on 5-21-25 at 5:08 pm revealed there was no emergency light fixture with back-up battery power provided in the rooms containing the controls and switches for the emergency generator. During an interview on 5-21-25 at 5:08 pm, Maintenance Staff A and B confirmed the findings. NFPA 110, 2010 ed. 7.3.1 The Level 1 or Level 2 EPS equipment location(s) shall be provided with battery-powered emergency lighting. This requirement shall not apply to units located outdoors in enclosures that do not include walk-in access.”
-
Electrical Systems - Essential Electric Syste
The inspectors’ words, 343 words
“Electrical Systems - Essential Electric Syste CFR(s): NFPA 101 Electrical Systems - Essential Electric System Maintenance and Testing The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110. Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations. 6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) This Standard is not met as evidenced by: 39858 Based on record review and interview, the facility failed to conduct required specific gravity testing of the electrolyte of the starting batteries for the emergency generator. This deficient practice would not ensure the emergency generator would operate upon loss of normal power. The facility had a census of 6 on the day of survey. Findings are: During record review on 5-21-25 at 2:39 pm, the facility failed to produce documentation to assure the specific testing of the electrolyte of the batteries for the emergency generator was conducted monthly. During an interview on 5-21-25 at 2:39 pm, Maintenance Staff A and B confirmed the lack of testing.”
-
Electrical Equipment - Power Cords And Extens
The inspectors’ words, 278 words
“Electrical Equipment - Power Cords and Extens CFR(s): NFPA 101 Electrical Equipment - Power Cords and Extension Cords Power strips in a patient care vicinity are only used for components of movable patient-care-related electrical equipment (PCREE) assembles that have been assembled by qualified personnel and meet the conditions of 10.2.3.6. Power strips in the patient care vicinity may not be used for non-PCREE (e.g., personal electronics), except in long-term care resident rooms that do not use PCREE. Power strips for PCREE meet UL 1363A or UL 60601-1. Power strips for non-PCREE in the patient care rooms (outside of vicinity) meet UL 1363. In non-patient care rooms, power strips meet other UL standards. All power strips are used with general precautions. Extension cords are not used as a substitute for fixed wiring of a structure. Extension cords used temporarily are removed immediately upon completion of the purpose for which it was installed and meets the conditions of 10.2.4. 10.2.3.6 (NFPA 99), 10.2.4 (NFPA 99), 400-8 (NFPA 70), 590.3(D) (NFPA 70), TIA 12-5 This Standard is not met as evidenced by: 39858 Based on observation and interview, the facility allowed the use of a light duty multi-plug surge protector as a substitute for permanent electrical wiring. This deficient practice could cause electrical injury and fires. The facility had a census of 6 on the day of survey. Findings are: Observation on 5-21-25 at 3:49 pm revealed the use of a light duty multi-plug surge protector, powering a small fan, a phone charger and a laptop computer in the corridor of the old specialty clinic. During an interview on 5-21-25 at 3:49 pm, Maintenance Staff A and B confirmed the findings.”
All 2 inspections in the last three years
| Date | Visit | What the record says |
|---|---|---|
| May 22, 2025 | Standard inspection | 1 deficiency cited |
| May 21, 2025 | Standard inspection | 5 deficiencies cited |
How do patients fare?
- CMS gives no overall CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.: “There are too few measures or measure groups reported to calculate a star rating or measure group score.”
- Of the measures behind its CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System., CMS counts against the national value: mortality, 0 better and 0 worse of 2; safety of care, 0 better and 0 worse of 1; readmission, 1 better and 0 worse of 3.
- Patients rate it 4 of 5 in CMS’s patient survey (101 surveys completed, Oct 1, 2024 to Sep 30, 2025): 71% rated it 9 or 10 out of 10, and 70% would definitely recommend it.
- Deaths within 30 days, as CMS gives them (Jul 1, 2022 to Jun 30, 2025): pneumonia 13.6%. CMS gives no comparison with the national rate for them in this release.
- Readmissions within 30 days, as CMS gives them (Jul 1, 2023 to Jun 30, 2025): pneumonia 17.9%. CMS gives no comparison with the national rate for them in this release.
- Emergency department patients spent a median of 146 minutes there before leaving (Oct 1, 2024 to Sep 30, 2025).
CMS, Hospital General Information, Patient survey (HCAHPS) - Hospital, Healthcare Associated Infections - Hospital, Timely and Effective Care - Hospital and Medicare Spending Per Beneficiary - Hospital. Released Aug 13, 2026. Updated quarterly.
CMS, Complications and Deaths - Hospital and Unplanned Hospital Visits - Hospital. Released Sep 30, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Overall ratingCMS’s overall hospital quality star rating, 1 to 5 | Not rated |
| Patient survey ratingCMS star rating from its survey of the hospital’s patients (HCAHPS), 1 to 5 | 4 of 5 |
Is it certified, and in good standing?
- Medicare-certified critical access hospital since Apr 1, 2001.
- Ownership: government - local.
- It is not accredited by a private organisation, so the state carries out its routine inspections for Medicare.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Government - Local.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for hospitals.
- CMS’s HAC Reduction Program file has no result for it: the program covers general acute care hospitals Medicare pays under its inpatient prospective payment system.
- None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
CMS, Hospital-Acquired Condition (HAC) Reduction Program. Released Aug 13, 2026. Updated yearly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.
What do patients say about their care?
- CMS doesn’t publish staffing levels for hospitals.
- In CMS’s patient survey, patients rate how well its nurses communicated 3 of 5.
- 52% of its health care workers got a flu shot (Oct 1, 2024 to Mar 31, 2025).
CMS, Patient survey (HCAHPS) - Hospital and Timely and Effective Care - Hospital. Released Aug 13, 2026. Updated quarterly.
Who owns it?
- Cherry County Hospital runs it.
- 17 owners or officers are people: Roger W Dunn (corporate officer); Roger W Dunn (corporate director); James Bargen (corporate officer); James Bargen (managing employee (on the payroll)); James Bargen (runs it (operational or managerial control)); Stephanie L Jacobsen (managing employee (under contract)); Stephanie L Jacobsen (runs it (operational or managerial control)); Warren Arganbright (corporate director); Gregg Perrett (corporate officer); Gregg Perrett (corporate director); James Vanwinkle (corporate director); Mark Burchfield (corporate director); Sheila K Wheeler (corporate officer); Sheila K Wheeler (corporate director); Michele N Mulligan-Witt (managing employee (on the payroll)); Michele N Mulligan-Witt (runs it (operational or managerial control)); Deanna R Scott (corporate director).
- CMS’s Provider of Services file records 1 change of ownership.
- No private-equity firm among the owners CMS lists.
- No real-estate investment trust among the owners CMS lists.
CMS, Hospital All Owners and Hospital Enrollments. Released Sep 29, 2026. Updated monthly.
CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.
| Organisation | Role | Share | Since |
|---|---|---|---|
| Cherry County Hospital | Runs it (operational or managerial control) | 100% | Apr 1, 2001 |
How does it compare nearby?
- No other hospital CMS lists is in Cherry County.
CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for hospitals, so none are shown. The one payment cut CMS publishes for each hospital, under its Hospital-Acquired Condition Reduction Program, is shown where it applies.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- Most hospitals are accredited by a private organisation (The Joint Commission, DNV and others) whose routine inspections stand in for the state’s; those reports aren’t public, and QCOR holds only the state’s surveys: no inspection on record here doesn’t mean none took place.
- QCOR says its hospital inspection data are complete only through September 17, 2026, while it moves to a new system.
- CMS doesn’t publish staffing levels for hospitals.
- In its September 2026 release CMS gives no comparison with the national rate for death and readmission rates, though it gives the rates.
Sources
-
Centers for Medicare & Medicaid Services, Hospital General Information (xubh-q36u).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (HCAHPS) - Hospital.
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Healthcare Associated Infections - Hospital (77hc-ibv8).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Complications and Deaths - Hospital (ynj2-r877).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Unplanned Hospital Visits - Hospital (632h-zaca).
Released Sep 30, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Timely and Effective Care - Hospital (yv7e-xc69).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Medicare Spending Per Beneficiary - Hospital (rrqw-56er).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital-Acquired Condition (HAC) Reduction Program (yq43-i98g).
Released Aug 13, 2026 and checked Nov 5, 2026. Updated yearly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Provider of Services File - Hospital & Non-Hospital Facilities (Hospital_and_other.DATA.Q3_2026.csv).
Released Oct 14, 2026 and checked Nov 5, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Hospital 2567 statements of deficiencies (Hospital_2567s_2010_to_2026YTD.xlsx).
Released Oct 20, 2026 and checked Oct 27, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital All Owners (Hospital_All_Owners_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Hospital Enrollments (Hospital_Enrollments_2026.09.29.csv).
Released Sep 29, 2026 and checked Nov 5, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Nov 5, 2026.
From the hospital
The public record above comes first. Anything the hospital adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the hospital will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the hospital”, and paying will never change a finding, a rating or the order of results.