Hearth Record

Parkview Dekalb Hospital

An acute care hospital in Auburn, Indiana 46706

1316 E Seventh St, Auburn, Indiana 46706. (260) 925-4600.

  • Medicare payments cut under the HAC Reduction Program (fiscal year 2026)
CMS’s own record, on Care Compare

Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.

The short answer

Record last released by CMS on Oct 20, 2026.

The last 24 months 4 deficiencies in 2 months of the last 36. Last cited Feb 2026. Most serious: Standard-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean4
Star ratings
CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
Condition-level deficiency
For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual.

What did inspectors find?

The last inspection on record was on Feb 10, 2026: a standard inspection.

22 deficiencies cited in the last three years, 1 of them at condition level, the most serious.

1 deficiency at condition level, the more serious of CMS’s two levels

Source:

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

When those deficiencies happened

4 deficiencies in 2 months of the last 36. Last cited Feb 2026. Most serious: Standard-level. The last 3 years, to Nov 5, 2026.

4 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 Dec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOctNov

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

Feb 10, 2026: standard inspection3 deficiencies
  • Initial Comments - Not A Deficiency Citation

    The inspectors’ words, 217 words

    “A Life Safety Code Recertification Survey was conducted by the Indiana Department of Health in accordance with 42 CFR 482.41(b). Survey Dates: 02/09/26 and 02/10/26 Facility Number: 005041 Provider Number: 150045 AIM Number: 100269460A At this Life Safety Code survey, Parkview DeKalb Hospital was found not in compliance with Requirements for Participation in Medicare/Medicaid, 42 CFR Subpart 482.41(b), Life Safety from Fire, and the 2012 edition of the National Fire Protection Association (NFPA) 101, Life Safety Code, Chapter 19 Existing Health Care occupancies. The facility is a three-story building. The original 1964 building and the 1976, 1992, 2001, and 2014 additions were determined to be Type I (332) construction, and the 2008 and 2011 Emergency Department additions were determined to be Type II (222). The facility is fully sprinklered and has a monitored fire alarm system with smoke detection in the corridors, open spaces, and operating rooms. The facility is protected with three Type 1 EES generators. The facility does have Category 1 Gas and Vacuum Piped Systems. The facility has a capacity of 57, with an inpatient census of 27 on 02/09/26 and 26 on 02/10/26. All areas where the patients and visitors have customary access were sprinklered. All areas providing facility services were sprinklered except for a detached Ambulance garage. Quality Review completed on 02/11/26”

    Rule K0000. Standard-level.

  • Sprinkler System - Maintenance And Testing

    The inspectors’ words, 317 words

    “Sprinkler System - Maintenance and Testing CFR(s): NFPA 101 Sprinkler System - Maintenance and Testing Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available. a) Date sprinkler system last checked _____________________ b) Who provided system test ____________________________ c) Water system supply source __________________________ Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system. 9.7.5, 9.7.7, 9.7.8, and NFPA 25 This Standard is not met as evidenced by: 34653 Based on observations and interviews, the facility failed to ensure that 1 of 2 kitchen washroom sprinklers was free of corrosion. NFPA 25, 2011 edition, at 5.2.1.1.1 states sprinklers shall not show signs of leakage; shall be free of corrosion, foreign materials, paint, and physical damage; and shall be installed in the correct orientation (e.g., upright, pendent, or sidewall). Furthermore, at 5.2.1.1.2 states any sprinkler that shows signs of any of the following shall be replaced: (1) Leakage, (2) Corrosion, (3) Physical Damage, (4) Loss of fluid in the glass bulb heat-responsive element, (5) Loading, (6) Painting unless painted by the sprinkler manufacturer. This deficient practice could affect all kitchen staff, outpatients, and visitors who use the cafeteria. Findings include: Based on observation with the Facilities Manager, Accreditation Specialist, and the Safety Coordinator on 02/09/25 at 1:55 p.m., the sprinkler head in the kitchen washroom above the dishwasher was green and showed signs of corrosion. Based on an interview at 1:55 p.m., the Facilities Manager agreed that a sprinkler head in the kitchen washroom showed signs of corrosion and needed to be replaced. Findings were reviewed during the exit conference with the President, VP of Care Services, Facilities Manager, Accreditation Specialist, and the Safety Coordinator on 02/10/26 at 2:30 p.m.”

    Rule K0353. Standard-level.

  • Electrical Equipment - Testing And Maintenanc

    The inspectors’ words, 543 words

    “Electrical Equipment - Testing and Maintenanc CFR(s): NFPA 101 Electrical Equipment - Testing and Maintenance Requirements The physical integrity, resistance, leakage current, and touch current tests for fixed and portable patient-care related electrical equipment (PCREE) is performed as required in 10.3. Testing intervals are established with policies and protocols. All PCREE used in patient care rooms is tested in accordance with 10.3.5.4 or 10.3.6 before being put into service and after any repair or modification. Any system consisting of several electrical appliances demonstrates compliance with NFPA 99 as a complete system. Service manuals, instructions, and procedures provided by the manufacturer include information as required by 10.5.3.1.1 and are considered in the development of a program for electrical equipment maintenance. Electrical equipment instructions and maintenance manuals are readily available, and safety labels and condensed operating instructions on the appliance are legible. A record of electrical equipment tests, repairs, and modifications is maintained for a period of time to demonstrate compliance in accordance with the facility’s policy. Personnel responsible for the testing, maintenance and use of electrical appliances receive continuous training. 10.3, 10.5.2.1, 10.5.2.1.2, 10.5.2.5, 10.5.3, 10.5.6, 10.5.8 This Standard is not met as evidenced by: 34653 Based on records review and interview, the facility failed to maintain 1 of 1 complete documentation of inspections for Patient-Care Related Electrical Equipment (PCREE) including leakage current and touch current in accordance with NFPA 99 2012 edition, sections 10.3 and 10.5 which states the physical integrity, resistance, leakage current, and touch current tests for fixed and portable PCREE is performed as required in 10.3. Testing intervals are established with policies and protocols. All PCREE used in patient care rooms is tested in accordance with 10.3.5.4 or 10.3.6 before being put into service and after any repair or modification. Any system consisting of several electrical appliances demonstrates compliance with NFPA 99 as a complete system. Service manuals, instructions, and procedures provided by the manufacturer include information as required by 10.5.3.1.1 and are considered in the development of a program for electrical equipment maintenance. Electrical equipment instructions and maintenance manuals are readily available, and safety labels and condensed operating instructions on the appliance are legible. A record of electrical equipment tests, repairs, and modifications is maintained for a period to demonstrate compliance with the facility’s policy. Personnel responsible for the testing, maintenance, and use of electrical appliances receive continuous training. This deficient practice affects all outpatients and 27 of 27 inpatients. Findings include: Based on a records review with the Facilities Manager, Accreditation Specialist, and the Safety Coordinator on 02/09/25 at 3:00 p.m., there was documentation of testing for all PCREE used throughout the facility, but the form only stated “PASS” for each piece of equipment and did not address the physical integrity, resistance, leakage current, or touch current. Based on an interview at 3:00 p.m., the Facilities Manager stated that all PCREE was tested and that the documentation was maintained by Bio-Med. The Facilities Manager did not know if testing included physical integrity, resistance, leakage current, or touch current, and agreed that the PCREE testing form did not include the required information. Findings were reviewed during the exit conference with the President, VP of Care Services, Facilities Manager, Accreditation Specialist, and the Safety Coordinator on 02/10/26 at 2:30 p.m.”

    Rule K0921. Standard-level.

Aug 26, 2024: standard inspection1 deficiency
  • Doors With Self-Closing Devices

    The inspectors’ words, 332 words

    “Doors with Self-Closing Devices CFR(s): NFPA 101 Doors with Self-Closing Devices Doors in an exit passageway, stairway enclosure, or horizontal exit, smoke barrier, or hazardous area enclosure are self-closing and kept in the closed position, unless held open by a release device complying with 7.2.1.8.2 that automatically closes all such doors throughout the smoke compartment or entire facility upon activation of: * Required manual fire alarm system; and * Local smoke detectors designed to detect smoke passing through the opening or a required smoke detection system; and * Automatic sprinkler system, if installed; and * Loss of power. 18.2.2.2.7, 18.2.2.2.8, 19.2.2.2.7, 19.2.2.2.8 This Standard is not met as evidenced by: 34653 Based on observation and interview the facility failed to ensure 1 of 8 separation fire doors were self-closing and kept in the closed position, unless held open by a release device complying with 7.2.1.8.2. (1) Upon release of the hold-open mechanism, the leaf becomes self-closing. (2) The release device is designed so that the leaf instantly releases manually and, upon release, becomes self-closing, or the leaf can be readily closed. (3) The automatic releasing mechanism or medium is activated by the operation of approved smoke detectors installed in accordance with the requirements for smoke detectors for door leaf release service in NFPA 72, National Fire Alarm and Signaling Code. (4) Upon loss of power to the hold-open device, the hold open mechanism is released, and the door leaf becomes self-closing. This deficient practice could affect 20 patients in the ER. Findings include: Based on observations with the Facilities Supervisor on 8/26/24 between 10:45 a.m. and 12:30 p.m., the ER separation fire door to the ER manager office was held open with a door wedge. Based on interview at the time of observation, the Facilities Supervisor agreed the door is in a separation fire barrier and was held open with a device that did not release with the fire alarm. The findings were reviewed with the Facilities Supervisor during the exit conference.”

    Rule K0223. Standard-level.

Nov 17, 2023: standard inspection14 deficiencies
  • Initial Comments - Not A Deficiency Citation

    The inspectors’ words, 202 words

    “A Life Safety Code Recertification Survey was conducted by the Indiana Department of Health in accordance with 42 CFR 482.41(b). Survey Date: 11/16/23 through 11/17/23 Facility Number: 005041 Provider Number: 150045 AIM Number: 100269460A At this Life Safety Code survey, Parkview Dekalb Hospital was found not in compliance with Requirements for Participation in Medicare/Medicaid, 42 CFR Subpart 482.41(b), Life Safety from Fire and the 2012 edition of the National Fire Protection Association (NFPA) 101, Life Safety Code, Chapter 19 Existing Health Care occupancies. The facility is a three-story building. The original 1964 building and the 1976, 1992, 2001, and 2014 additions were determined to be Type I (332) construction and the 2008 and 2011 Emergency Department addition were determined to be Type II (222). The facility is fully sprinklered, has a monitored fire alarm system with smoke detection in the corridors and spaces open to the corridors and in the operating rooms. The facility is protected with a Type 1 EES by three generators. The facility does have a Category 1 Gas and Vacuum Piped Systems. The facility has a capacity of 57 with a census of 19 on 11/16/23 and a census of 16 on 11/17/23. Quality Review completed on 11/27/23”

    Rule K0000. Standard-level.

  • Multiple Occupancies

    The inspectors’ words, 691 words

    “Multiple Occupancies CFR(s): NFPA 101 Multiple Occupancies - Sections of Health Care Facilities Sections of health care facilities classified as other occupancies meet all of the following: o They are not intended to serve four or more inpatients for purposes of housing, treatment, or customary access. o They are separated from areas of health care occupancies by construction having a minimum two hour fire resistance rating in accordance with Chapter 8. o The entire building is protected throughout by an approved, supervised automatic sprinkler system in accordance with Section 9.7. Hospital outpatient surgical departments are required to be classified as an Ambulatory Health Care Occupancy regardless of the number of patients served. 19.1.3.3, 42 CFR 482.41, 42 CFR 485.623 This Standard is not met as evidenced by: 34653 Based on observation and interview, the facility failed to ensure the penetration in 4 of 4 fire barrier walls that separated health care from business occupancies was maintained to ensure the fire resistance of the barrier. LSC 19.1.1.3 requires all health care facilities to be maintained and operated to minimize the possibility of a fire emergency requiring the evacuation of the occupants. LSC 8.3.5.1 requires penetrations for cables, cable trays, conduits, pipes, tubes, combustion vents and exhaust vents, wires, and similar items to accommodate electrical, mechanical, plumbing, and communications systems that pass through a wall, floor, or floor/ceiling assembly constructed as a fire barrier shall be protected by a firestop system or device. The firestop system or device shall be tested in accordance with ASTM E 814, Standard Test Method for Fire Tests of Through Penetration Fire Stops, or ANSI/UL 1479, Standard for Fire Tests of Through-Penetration Fire Stops. This deficient practice could affect all staff, visitors, and patients. Findings include: Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/17/23 between 11:00 a.m. and 1:00 p.m., the following separation fire walls had unsealed penetrations. A.) Above the drop ceiling of the second-floor separation fire barrier by lab room A224 had an unsealed one-inch hole through the wall. B.) Above the drop ceiling of the second-floor separation fire barrier in the lab had an unsealed 1/4-inch gap between two pieces of drywall. C.) Above the drop ceiling of the second-floor separation fire barrier to Imaging had two 3-inch pipe sleeve ends that were not sealed. D.) Above the drop ceiling of the second-floor separation fire barrier in the Imaging work room there was a drywall patch covering a hole, but the patch was not sealed leaving a 1/8th of an inch gap between the wall and patch. E.) Above the drop ceiling of the second-floor separation fire barrier by room A239 there were three unsealed 1-inch holes. F.) Above the drop ceiling of the second-floor separation fire barrier by room A202 there was an unsealed 2-inch hole. G.) Above the drop ceiling of the second-floor separation fire barrier by MRI control room had a ½-inch gap around duct work. H.) Above the drop ceiling of the ER area separation fire barrier by the ER lounge had an unsealed 2-inch hole. I.) Above the drop ceiling by the rolling fire door of the ER area separation fire barrier had an unsealed 2-inch hole. J.) Above the drop ceiling of the ER area separation fire barrier by triage had a 6-inch pipe sleeve end that was not sealed. K.) Above the drop ceiling of the ER area separation fire barrier by public safety had a 3-inch pipe sleeve that was not sealed around the sleeve and at the end of the sleeve. L.) Above the drop ceiling of the north medical office separation fire barrier had a 3-inch pipe sleeve end that was not sealed. M.) Above the drop ceiling of the MOB separation fire barrier had a 6-inch by 4-inch hole/cutout in the wall. Based on interview at the time of observation, the Facilities Supervisor, the Facilities Manager, and Director of Facilities agreed all four separation fire barriers had unsealed penetrations. The findings were reviewed with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, Director of Facilities, and the Safety Coordinator during the exit conference.”

    Rule K0131. Standard-level.

  • Building Construction Type And Height

    The inspectors’ words, 406 words

    “Building Construction Type and Height CFR(s): NFPA 101 Building Construction Type and Height 2012 EXISTING Building construction type and stories meets Table 19.1.6.1, unless otherwise permitted by 19.1.6.2 through 19.1.6.7 19.1.6.4, 19.1.6.5 Construction Type 1 I (442), I (332), II (222) Any number of stories non-sprinklered and sprinklered 2 II (111) One story non-sprinklered Maximum 3 stories sprinklered 3 II (000) Not allowed non-sprinklered 4 III (211) Maximum 2 stories sprinklered 5 IV (2HH) 6 V (111) 7 III (200) Not allowed non-sprinklered 8 V (000) Maximum 1 story sprinklered Sprinklered stories must be sprinklered throughout by an approved, supervised automatic system in accordance with section 9.7. (See 19.3.5) Give a brief description, in REMARKS, of the construction, the number of stories, including basements, floors on which patients are located, location of smoke or fire barriers and dates of approval. Complete sketch or attach small floor plan of the building as appropriate. This Standard is not met as evidenced by: 34653 Based on observation and interview, the facility failed to maintain the building type of II (222) construction by ensuring through penetrations in 1 of 2 two-hour fire floor/ceiling barrier assemblies were maintained to ensure the fire resistance of the two-hour barrier. LSC 8.3.5.1 requires penetrations for cables, cable trays, conduits, pipes, tubes, combustion vents and exhaust vents, wires, and similar items to accommodate electrical, mechanical, plumbing, and communications systems that pass through a wall, floor, or floor/ceiling assembly constructed as a fire barrier shall be protected by a firestop system or device. The firestop system or device shall be tested in accordance with ASTM E 814, Standard Test Method for Fire Tests of Through Penetration Fire Stops, or ANSI/UL 1479, Standard for Fire Tests of Through-Penetration Fire Stops. This deficient practice affects all staff, visitors, and patients. Findings include: Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/17/23 at 12: 30 p.m., on the first floor above the drop ceiling by the triage firewall there was an unsealed 2-inch penetration around a drainage pipe in the two-hour floor/ceiling fire barrier. Based on interview at the time of observation, the Facilities Manager agreed the floor/ceiling fire barrier was not maintained as a two-hour barrier due to the unsealed hole through the barrier. The finding was reviewed with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, Director of Facilities, and the Safety Coordinator during the exit conference.”

    Rule K0161. Standard-level.

  • Horizontal Sliding Doors

    The inspectors’ words, 400 words

    “Horizontal Sliding Doors CFR(s): NFPA 101 Horizontal-Sliding Doors Horizontal-sliding doors permitted by 7.2.1.14 that are not automatic-closing are limited to a single leaf and shall have a latch or other mechanism to ensure the door will not rebound. Horizontal-sliding doors serving an occupant load fewer than 10 shall be permitted, providing all of the following criteria are met: o Area served by the door has no high hazard contents. o Door is operable from either side without special knowledge or effort. o Force required to operate the door in the direction of travel is less than or equal to 30 lbf to set the door in motion and less than or equal to 15 lbf to close or open to the required width. o Assembly is appropriately fire rated, and where rated, is self-closing or automatic-closing by smoke detection per 7.2.1.8, and installed per NFPA 80. o Where required to latch, the door has a latch or other mechanism to ensure the door will not rebound. 19.2.2.2.10 This Standard is not met as evidenced by: 34653 Based on observation and interview, the facility failed to ensure 2 of 15 horizontal-sliding room doors in ICU and the Emergency Department were provided with means for keeping the door closed. LSC 19.3.6.3.5 stated doors shall be provided with a means for keeping the door closed that is acceptable to the authority having jurisdiction. LSC 19.2.2.2.10.1 states horizontal-sliding doors, as permitted by 7.2.1.14, that are not automatic-closing shall be limited to a single leaf and shall have a latch or other mechanism that ensures that the doors will not rebound into a partially open position if forcefully closed. This deficient practice could affect 2 patients. Findings include: Based on observation during a tour of the facility with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/16/23 between 10:00 a.m. and 3:00 p.m., room #1 in ICU and room #9 in the Emergency Department contained horizontal-sliding doors. The doors did contain a latch, but when tested the doors did not latch into the frame. Based on interview during observation, the Facilities Manager agreed the doors did not latch into the door frames when tested and stated the door latches will need to be repaired. The finding was reviewed with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, Director of facilities and the Safety Coordinator during the exit conference.”

    Rule K0224. Standard-level.

  • Aisle, Corridor, Or Ramp Width

    The inspectors’ words, 414 words

    “Aisle, Corridor, or Ramp Width CFR(s): NFPA 101 Aisle, Corridor or Ramp Width 2012 EXISTING The width of aisles or corridors (clear or unobstructed) serving as exit access shall be at least 4 feet and maintained to provide the convenient removal of nonambulatory patients on stretchers, except as modified by 19.2.3.4, exceptions 1-5. 19.2.3.4, 19.2.3.5 This Standard is not met as evidenced by: 34653 Based on observation and interview, the facility failed to meet the clear width requirement for 1 of 1 CCU corridors or met an exception per 19.2.3.4(5). LSC 19.2.3.4(5) states where the corridor width is at least 8 feet, projections into the required width shall be permitted for fixed furniture, provided that all of the following conditions are met: (a) the fixed furniture is securely attached to the floor or to the wall. (b) the fixed furniture does not reduce the clear unobstructed corridor width to less than six feet, except as permitted by 19.2.3.4(2). (c) the fixed furniture is located only on one side of the corridor. (d) the fixed furniture is grouped such that each grouping does not exceed an area of 50 square feet. (e) the fixed furniture groupings addressed in 19.2.3.4(5) (d) are separated from each other by a distance of at least 10 feet. (f) the fixed furniture is located so as to not obstruct access to building service and fire protection equipment. (g) corridors throughout the smoke compartment are protected by an electrically supervised automatic smoke detection system in accordance with 19.3.4, or the fixed furniture spaces are arranged and located to allow direct supervision by the facility staff from a nurse’s station or similar space. (h) the smoke compartment is protected throughout by an approved, supervised automatic sprinkler system in accordance with 19.3.5.8 This deficient practice could affect 10 patients on the CCU wing. Findings include: Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/16/23 between 11:50 a.m., there were two chairs and an end table in the CCU hall, extended about two feet into the corridor, and were not affixed to the floor or to the wall when tested. Based on interview at the time of the observations, the Facilities Manager agreed the chairs and table were not securely attached to the floor or to the wall when tested. The finding was reviewed with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, Director of Facilities, and the Safety Coordinator during the exit conference.”

    Rule K0232. Standard-level.

  • Hazardous Areas - Enclosure

    The inspectors’ words, 530 words

    “Hazardous Areas - Enclosure CFR(s): NFPA 101 Hazardous Areas - Enclosure Hazardous areas are protected by a fire barrier having 1-hour fire resistance rating (with 3/4 hour fire rated doors) or an automatic fire extinguishing system in accordance with 8.7.1 or 19.3.5.9. When the approved automatic fire extinguishing system option is used, the areas shall be separated from other spaces by smoke resisting partitions and doors in accordance with 8.4. Doors shall be self-closing or automatic-closing and permitted to have nonrated or field-applied protective plates that do not exceed 48 inches from the bottom of the door. Describe the floor and zone locations of hazardous areas that are deficient in REMARKS. 19.3.2.1, 19.3.5.9 Area Automatic Sprinkler Separation N/A a. Boiler and Fuel-Fired Heater Rooms b. Laundries (larger than 100 square feet) c. Repair, Maintenance, and Paint Shops d. Soiled Linen Rooms (exceeding 64 gallons) e. Trash Collection Rooms (exceeding 64 gallons) f. Combustible Storage Rooms/Spaces (over 50 square feet) g. Laboratories (if classified as Severe Hazard - see K322) This Standard is not met as evidenced by: 34653 Based on observation and interview, the facility failed to ensure the corridor doors to 1 of 1 imaging storage rooms and 2 of 4 surgery center storerooms was protected as a hazardous area, had latching doors, and contained smoke resisting partitions and doors. This deficient practice could affect staff, visitors, and 7 patients in the Imaging and Surgery Centers. Findings include: A.) Based on observations with Facilities Supervisor and the Safety Coordinator on 11/16/23 at 2:00 p.m., the imaging storeroom contained large amounts of combustible supply boxes, was greater than 50 square feet, and was not protected as a hazardous room. The room was equipped with double set of doors. There was about a ½ inch gap between the doors when the doors were in the closed position. This condition would allow smoke to escape the room in event of a fire. Also, the right door leaf of the set of doors did not have a positive latching device, and the left door leaf latched into the right door leaf which did not latch into the frame. Based on interview at the time of observation, the Facilities Supervisor agreed the room was used as storage, was larger than 50 square feet, stated there was a large gap between the doors when closed, and the doors did not latch into the frame. B.) Based on observations with the Director of Facilities, Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/17/23 between 10:00 a.m. and 11:30 a.m., the OR and EVS storerooms contained over 20 boxes of supplies, were greater than 50 square, therefore making the rooms hazardous areas. The storerooms were not protected as a hazardous area because the corridor doors to the rooms were not self-closing or automatic closing. Based on interview at the time of observation, the Facilities Manager agreed the storerooms contained large amount of combustible storage, was larger than 50 square feet, and the corridor doors to the rooms were not self-closing. The finding was reviewed with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, Director of Facilities, and the Safety Coordinator during the exit conference.”

    Rule K0321. Standard-level.

  • Interior Wall And Ceiling Finish

    The inspectors’ words, 260 words

    “Interior Wall and Ceiling Finish CFR(s): NFPA 101 Interior Wall and Ceiling Finish 2012 EXISTING Interior wall and ceiling finishes, including exposed interior surfaces of buildings such as fixed or movable walls, partitions, columns, and have a flame spread rating of Class A or Class B. The reduction in class of interior finish for a sprinkler system as prescribed in 10.2.8.1 is permitted. 10.2, 19.3.3.1, 19.3.3.2 Indicate flame spread rating(s). _____________________ This Standard is not met as evidenced by: 34653 Based on observation, records review, and interview, the facility failed to ensure 2 of 2 rooms with unfinished interior walls used materials in accordance with LSC 19.3.3.1. and 10.2.3.4. This deficient practice could affect 10 patients in the Surgery Center. Findings include: Based on observations with the Director of Facilities, Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/17/23 between 10:00 a.m. and 11:30 a.m., in the EVS storeroom and storeroom OR 4 had unfinished walls with exposed insulation and metal studs and 2 walls in OR 4 were completely covered with plastic. Based on records review at 1:25 p.m., there was no documentation of the flame spread rating for the exposed insulation. Based on interview at the time of observation, the Facilities Manager agreed both rooms had unfinished walls with exposed insulation and metal studs with plastic covering 2 of the walls and there was not a plan to finish the walls. The finding was reviewed with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, Director of Facilities, and the Safety Coordinator during the exit conference.”

    Rule K0331. Standard-level.

  • Sprinkler System - Maintenance And Testing

    The inspectors’ words, 403 words

    “Sprinkler System - Maintenance and Testing CFR(s): NFPA 101 Sprinkler System - Maintenance and Testing Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available. a) Date sprinkler system last checked _____________________ b) Who provided system test ____________________________ c) Water system supply source __________________________ Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system. 9.7.5, 9.7.7, 9.7.8, and NFPA 25 This Standard is not met as evidenced by: 34653 Based on observation and interview, the facility failed to maintain the ceiling construction of 1 of 1 communication rooms accordance LSC and NFPA 13, 2010 edition, at 8.5.4.11., and failed to ensure 1 of 1 sprinkler heads in the morgue were not loaded and covered with foreign material in accordance with LSC and NFPA 25, 2011 edition, at 5.2.1.1.1. This deficient practice affects staff, visitors, and 10 patients in two smoke compartments. Findings include: A.) NFPA 13, 8.5.4.11 states the distance between the sprinkler deflector and the ceiling above shall be selected based on the type of sprinkler and the type of construction. Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/16/23 at 1:23 p.m., in the suspended ceiling IT room 229 there was a ceiling tile missing and exposed the ceiling about one to two feet above the suspended ceiling. This condition could delay the activation of the sprinklers installed on the suspended ceiling. Based on interview at the time of the observations, the Facilities Supervisor agreed there was a missing ceiling tile and exposed the ceiling above the drop ceiling. B.) NFPA 25, 5.2.1.1.1 states sprinklers shall not show signs of leakage and are free of corrosion, foreign materials, paint, and physical damage. Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/16/23 at 11:30 a.m., the one sprinkler head in the morgue was heavily loaded with foreign materials. Based on interview at the time of observation, the Facilities Manager, confirmed the sprinkler head in the morgue was loaded with foreign materials. The findings were reviewed with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, Director of Facilities, and the Safety Coordinator during the exit conference.”

    Rule K0353. Standard-level.

  • Corridors - Areas Open To Corridor

    The inspectors’ words, 301 words

    “Corridors - Areas Open to Corridor CFR(s): NFPA 101 Corridors - Areas Open to Corridor Spaces (other than patient sleeping rooms, treatment rooms and hazardous areas), waiting areas, nurse’s stations, gift shops, and cooking facilities, open to the corridor are in accordance with the criteria under 18.3.6.1 and 19.3.6.1. 18.3.6.1, 19.3.6.1 This Standard is not met as evidenced by: 34653 Based on observation and interview, the facility failed to ensure 1 of 1 alcoves with a large quantity of combustible storage open to the corridor was not used as hazardous storage. LSC 19.3.6.1(7) states Spaces, other than patient sleeping rooms, treatment rooms, and hazardous areas, shall be permitted to be open to the corridor and unlimited in area provided: (a) The space and corridors which the space opens onto in the same smoke compartment are protected by an electrically supervised automatic smoke detection system in accordance with 19.3.4, and (b) Each space is protected by an automatic sprinklers, and (c) The space does not to obstruct access to required exits. This deficient practice could affect 10 Patients in CCU. Findings include: Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/16/23 at 11:45 a.m., the alcove by the supply room in CCU wing was open to the corridor and was being used to store combustible material such as seven plastic totes of gowns. This condition does not protect the corridor from a hazardous storage area. Based on interview at the time of observation, the Facilities Manager agreed the alcove was open to the corridor, contained combustible storage, and stated the seven totes will be removed form the corridor. The finding was reviewed with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, Director of Facilities, and the Safety Coordinator during the exit conference.”

    Rule K0361. Standard-level.

  • Subdivision Of Building Spaces - Smoke Barrie

    The inspectors’ words, 581 words

    “Subdivision of Building Spaces - Smoke Barrie CFR(s): NFPA 101 Subdivision of Building Spaces - Smoke Barrier Construction 2012 EXISTING Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier. 19.3.7.3, 8.6.7.1(1) Describe any mechanical smoke control system in REMARKS. This Standard is not met as evidenced by: 34653 Based on observation and interview, the facility failed to ensure the penetrations caused by the passage of wire and/or conduit through 13 of 17 smoke barrier walls were protected to maintain the smoke resistance of each smoke barrier. LSC Section 8.5.6.2 requires penetrations for cables, cable trays, conduits, pipes, tubes, vents, wires, and similar items to accommodate electrical, mechanical, plumbing, and communications systems that pass through a wall, floor, or floor/ceiling assembly constructed as a smoke barrier, or through the ceiling membrane of the roof/ceiling of a smoke barrier assembly, shall be protected by a system or material capable of restricting the movement of smoke. The firestop system or device shall be tested in accordance with ASTM E 814, Standard Test Method for Fire Tests of Through Penetration Fire Stops, or ANSI/UL 1479, Standard for Fire Tests of Through-Penetration Fire Stops. This deficient practice affects staff, visitors, and all patients. Findings include: Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/17/23 between 11:00 a.m. and 1:00 p.m., above the drop ceiling of the following smoke walls had unsealed penetrations and/or was sealed with material not meeting ASTM E 814: A.) The smoke wall by the OR nurses’ station had a 1-inch unsealed gap between a vent and the drywall and had four unsealed holes in the wall. B.) The smoke wall by PACU had penetrations filled with Joint Compound. C.) The smoke wall by the OR consultation room had a penetration sealed with Joint Compound and the end of a 1-inch pipe sleave was not sealed. D.) The smoke wall by surgical services had a 1/4-inch unsealed gap around wires. E.) The smoke wall by room 315 had an unsealed 4-inch hole in the wall. F.) The smoke wall by room 309 had an unsealed 4-inch hole in the wall. G.) The smoke wall by room 209 had penetrations filled with Joint Compound. H.) The smoke wall by room 215 had a 5x6 inch area where the cement was broken leaving 1/8-inch cracks in the wall. I.) The OB lobby smoke wall had three unsealed 1/4-inch gaps around pipes. J.) The Pharmacy smoke wall had three unsealed 1/4-inch gaps around pipes and Joint Compound was used to seal penetrations. K.) The smoke wall by room A-286 had an unsealed 1/4-inch gap around a wire. L.) The smoke wall by Respiratory had an unsealed 1/4-inch gap around a wire. M.) The smoke wall by Hospitality Services had an unsealed 1-inch hole and Joint Compound was used to seal penetrations. Based on interview at the time of observation, the Facilities Supervisor, the Facilities Manager, and Director of Facilities agreed the aforementioned smoke barriers had unsealed penetrations or were sealed with material that did not meet ASTM E 814. The findings were reviewed with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, Director of Facilities, and the Safety Coordinator during the exit conference.”

    Rule K0372. Standard-level.

  • Fire Drills

    The inspectors’ words, 247 words

    “Fire Drills CFR(s): NFPA 101 Fire Drills Fire drills include the transmission of a fire alarm signal and simulation of emergency fire conditions. Fire drills are held at expected and unexpected times under varying conditions, at least quarterly on each shift. The staff is familiar with procedures and is aware that drills are part of established routine. Where drills are conducted between 9:00 PM and 6:00 AM, a coded announcement may be used instead of audible alarms. 19.7.1.4 through 19.7.1.7 This Standard is not met as evidenced by: 34653 Based on record review and interview, the facility failed to conduct fire drills on each shift for 1 of 4 quarters. LSC 19.7.1.6 states drills shall be conducted quarterly on each shift to familiarize facility personnel (nurses, interns, maintenance engineers, and administrative staff) with the signals and emergency action required under varied conditions. This deficient practice affects all staff, visitors, and patients. Findings include: Based on records review with the Facilities Manager and the Safety Coordinator on 11/16/23 at 2:52 p.m., no documentation was available to show a second shift fire drill for the first quarter of 2023 was conducted. Based on interview at the time of record review, the Safety Coordinator agreed the aforementioned drill was missed, and stated the facility has implement an audit system to ensure drills are not missed. The finding was reviewed with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, Director of Facilities, and the Safety Coordinator during the exit conference.”

    Rule K0712. Standard-level.

  • Maintenance, Inspection And Testing - Doors

    The inspectors’ words, 269 words

    “Maintenance, Inspection & Testing - Doors CFR(s): Maintenance, Inspection & Testing - Doors Fire doors assemblies are inspected and tested annually in accordance with NFPA 80, Standard for Fire Doors and Other Opening Protectives. Non-rated doors, including corridor doors to patient rooms and smoke barrier doors, are routinely inspected as part of the facility maintenance program. Individuals performing the door inspections and testing possess knowledge, training or experience that demonstrates ability. Written records of inspection and testing are maintained and are available for review. 19.7.6, 8.3.3.1 (LSC) 5.2, 5.2.3 (2010 NFPA 80) This Standard is not met as evidenced by: 34653 Based on observation, records review, and interview; the facility failed to ensure 1 of 3 smoke barrier doors on the 200-hall were routinely inspected and repaired as part of the facility maintenance program. This deficient practice could affect 10 patients in two smoke compartments. Findings include: Based on observations with Facilities Supervisor and the Safety Coordinator on 11/16/23 at 1:30 p.m., one door leaf of the smoke doors by room 216 was damaged due to 12 small screw holes down the inner edge of the door leaf. Based on records review Between 1:00 p.m. and 3:00 p.m., the fire/smoke door testing form dated 11/14/23 indicated all smoke and fire doors passed inspection. Based on interview at the time of observation, the Facilities Supervisor stated the aforementioned smoke door contained small holes due to some type of astragal was removed at an unknown date. The finding was reviewed with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, Director of Facilities, and the Safety Coordinator during the exit conference.”

    Rule K0761. Standard-level.

  • Electrical Equipment - Power Cords And Extens

    The inspectors’ words, 387 words

    “Electrical Equipment - Power Cords and Extens CFR(s): NFPA 101 Electrical Equipment - Power Cords and Extension Cords Power strips in a patient care vicinity are only used for components of movable patient-care-related electrical equipment (PCREE) assembles that have been assembled by qualified personnel and meet the conditions of 10.2.3.6. Power strips in the patient care vicinity may not be used for non-PCREE (e.g., personal electronics), except in long-term care resident rooms that do not use PCREE. Power strips for PCREE meet UL 1363A or UL 60601-1. Power strips for non-PCREE in the patient care rooms (outside of vicinity) meet UL 1363. In non-patient care rooms, power strips meet other UL standards. All power strips are used with general precautions. Extension cords are not used as a substitute for fixed wiring of a structure. Extension cords used temporarily are removed immediately upon completion of the purpose for which it was installed and meets the conditions of 10.2.4. 10.2.3.6 (NFPA 99), 10.2.4 (NFPA 99), 400-8 (NFPA 70), 590.3(D) (NFPA 70), TIA 12-5 This Standard is not met as evidenced by: 34653 Based on observation and interview, the facility failed to ensure 4 of 4 power strips were not used as a substitute for fixed wiring to provide power equipment with a high current draw or were daisy chained according to LSC/2012 chapter 19 and NFPA-70/2011, 400.8. This deficient practice could affect up to staff, visitors and 4 patients in two smoke compartments. Findings include: Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/16/23 between 10:00 a.m. and 3:00 p.m., the following areas had improper use of power strips: A.) A refrigerator and a microwave (high power draw equipment) were plugged into and supplied power by a power strip in the Physician Lounge. B.) A refrigerator and a coffee pot (high power draw equipment) were plugged into and supplied power by a power strip in the EVS lounge. C.) In the Bio-med Office a power strip was plugged into and supplied power by another power strip. Based on interview at the time of observations, the Facilities Manager agreed there were improper use of power strips. The finding was reviewed with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, Director of Facilities and the Safety Coordinator during the exit conference.”

    Rule K0920. Standard-level.

  • Gas Equipment - Cylinder And Container Storag

    The inspectors’ words, 434 words

    “Gas Equipment - Cylinder and Container Storag CFR(s): NFPA 101 Gas Equipment - Cylinder and Container Storage Greater than or equal to 3,000 cubic feet Storage locations are designed, constructed, and ventilated in accordance with 5.1.3.3.2 and 5.1.3.3.3. >300 but <3,000 cubic feet Storage locations are outdoors in an enclosure or within an enclosed interior space of non- or limited- combustible construction, with door (or gates outdoors) that can be secured. Oxidizing gases are not stored with flammables, and are separated from combustibles by 20 feet (5 feet if sprinklered) or enclosed in a cabinet of noncombustible construction having a minimum 1/2 hr. fire protection rating. Less than or equal to 300 cubic feet In a single smoke compartment, individual cylinders available for immediate use in patient care areas with an aggregate volume of less than or equal to 300 cubic feet are not required to be stored in an enclosure. Cylinders must be handled with precautions as specified in 11.6.2. A precautionary sign readable from 5 feet is on each door or gate of a cylinder storage room, where the sign includes the wording as a minimum “CAUTION: OXIDIZING GAS(ES) STORED WITHIN NO SMOKING.” Storage is planned so cylinders are used in order of which they are received from the supplier. Empty cylinders are segregated from full cylinders. When facility employs cylinders with integral pressure gauge, a threshold pressure considered empty is established. Empty cylinders are marked to avoid confusion. Cylinders stored in the open are protected from weather. 11.3.1, 11.3.2, 11.3.3, 11.3.4, 11.6.5 (NFPA 99) This Standard is not met as evidenced by: 34653 Based on observation and interview, the facility failed to ensure 3 of 3 oxygen storage rooms were provided with a precautionary sign readable from 5 feet is on each door or gate of a cylinder storage room, where the sign includes the wording as a minimum “CAUTION: OXIDIZING GAS(ES) STORED. This deficient practice could affect staff, visitors, and 5 patients. Findings include: Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/16/23 between 10:00 a.m. and 3:00 p.m., the Main oxygen storeroom, and the two respiratory storerooms were used as storage for oxygen cylinders. The doors to the rooms were not provided with precautionary signs which states “CAUTION: OXIDIZING GAS(ES) STORED.” Based on interview at the time of observation, the Maintenance Director stated each storeroom did not have precautionary signs indicating storage of oxidizing gasses. The finding was reviewed with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, Director of Facilities and the Safety Coordinator during the exit conference.”

    Rule K0923. Standard-level.

Nov 16, 2023: standard inspection4 deficiencies
  • Physical Environment

    The inspectors’ words, 467 words

    “PHYSICAL ENVIRONMENT CFR(s): 482.41 The hospital must be constructed, arranged, and maintained to ensure the safety of the patient, and to provide facilities for diagnosis and treatment and for special hospital services appropriate to the needs of the community. This Condition is not met as evidenced by: 47186 Based on observation and interview, the facility failed to ensure the penetration in 4 of 4 fire barrier walls that separated health care from business occupancies was maintained to ensure the fire resistance of the barrier, failed to maintain the building type of II (222) construction by ensuring through penetrations in 1 of 2 two-hour fire floor/ceiling barrier assemblies were maintained to ensure the fire resistance of the two-hour barrier, failed to ensure 2 of 15 horizontal-sliding room doors in ICU and the Emergency Department were provided with means for keeping the door closed, failed to meet the clear width requirement for 1 of 1 CCU corridors or met an exception per 19.2.3.4(5), failed to ensure the corridor doors to 1 of 1 imaging storage rooms and 2 of 4 surgery center storerooms was protected as a hazardous area, had latching doors, and contained smoke resisting partitions and doors, failed to ensure 2 of 2 rooms with unfinished interior walls used materials in accordance with LSC 19.3.3.1. and 10.2.3.4, failed to maintain the ceiling construction of 1 of 1 communication rooms accordance LSC and NFPA 13, 2010 edition, at 8.5.4.11., and failed to ensure 1 of 1 sprinkler heads in the morgue were not loaded and covered with foreign material in accordance with LSC and NFPA 25, 2011 edition, at 5.2.1.1.1, failed to ensure 1 of 1 alcoves with a large quantity of combustible storage open to the corridor was not used as hazardous storage, failed to ensure the penetrations caused by the passage of wire and/or conduit through 13 of 17 smoke barrier walls were protected to maintain the smoke resistance of each smoke barrier, failed to conduct fire drills on each shift for 1 of 4 quarters, failed to ensure 1 of 3 smoke barrier doors on the 200-hall were routinely inspected and repaired as part of the facility maintenance program, failed to ensure 4 of 4 power strips were not used as a substitute for fixed wiring to provide power equipment with a high current draw or were daisy chained according to LSC/2012 chapter 19 and NFPA-70/2011, 400.8, and failed to ensure 3 of 3 oxygen storage rooms were provided with a precautionary sign readable from 5 feet is on each door or gate of a cylinder storage room, where the sign includes the wording as a minimum “CAUTION: OXIDIZING GAS(ES) STORED. The cumulative effect of these systemic problems resulted in the facility’s inability to ensure the provision of quality health care in a safe environment.”

    Rule A0700. Condition-level.

  • Maintenance Of Physical Plant

    The inspectors’ words, 910 words

    “MAINTENANCE OF PHYSICAL PLANT CFR(s): 482.41(a) The condition of the physical plant and the overall hospital environment must be developed and maintained in such a manner that the safety and well-being of patients are assured. This Standard is not met as evidenced by: 47186 Based on observation and interview, the facility failed to ensure 2 of 15 horizontal-sliding room doors in ICU and the Emergency Department were provided with means for keeping the door closed. LSC 19.3.6.3.5 stated doors shall be provided with a means for keeping the door closed that is acceptable to the authority having jurisdiction. LSC 19.2.2.2.10.1 states horizontal-sliding doors, as permitted by 7.2.1.14, that are not automatic-closing shall be limited to a single leaf and shall have a latch or other mechanism that ensures that the doors will not rebound into a partially open position if forcefully closed. Findings include: Based on observation during a tour of the facility with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/16/23 between 10:00 a.m. and 3:00 p.m., room #1 in ICU and room #9 in the Emergency Department contained horizontal-sliding doors. The doors did contain a latch, but when tested the doors did not latch into the frame. Based on interview during observation, the Facilities Manager agreed the doors did not latch into the door frames when tested and stated the door latches will need to be repaired. Based on observation, records review, and interview, the facility failed to ensure 2 of 2 rooms with unfinished interior walls used materials in accordance with LSC 19.3.3.1. and 10.2.3.4. Findings include: Based on observations with the Director of Facilities, Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/17/23 between 10:00 a.m. and 11:30 a.m., in the EVS storeroom and storeroom OR 4 had unfinished walls with exposed insulation and metal studs and 2 walls in OR 4 were completely covered with plastic. Based on records review at 1:25 p.m., there was no documentation of the flame spread rating for the exposed insulation. Based on interview at the time of observation, the Facilities Manager agreed both rooms had unfinished walls with exposed insulation and metal studs with plastic covering 2 of the walls and there was not a plan to finish the walls. Based on observation and interview, the facility failed to ensure 1 of 1 alcoves with a large quantity of combustible storage open to the corridor was not used as hazardous storage. LSC 19.3.6.1(7) states Spaces, other than patient sleeping rooms, treatment rooms, and hazardous areas, shall be permitted to be open to the corridor and unlimited in area provided: (a) The space and corridors which the space opens onto in the same smoke compartment are protected by an electrically supervised automatic smoke detection system in accordance with 19.3.4, and (b) Each space is protected by an automatic sprinklers, and (c) The space does not to obstruct access to required exits. Findings include: Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/16/23 at 11:45 a.m., the alcove by the supply room in CCU wing was open to the corridor and was being used to store combustible material such as seven plastic totes of gowns. This condition does not protect the corridor from a hazardous storage area. Based on interview at the time of observation, the Facilities Manager agreed the alcove was open to the corridor, contained combustible storage, and stated the seven totes will be removed form the corridor. Based on observation, records review, and interview; the facility failed to ensure 1 of 3 smoke barrier doors on the 200-hall were routinely inspected and repaired as part of the facility maintenance program. Findings include: Based on observations with Facilities Supervisor and the Safety Coordinator on 11/16/23 at 1:30 p.m., one door leaf of the smoke doors by room 216 was damaged due to 12 small screw holes down the inner edge of the door leaf. Based on records review Between 1:00 p.m. and 3:00 p.m., the fire/smoke door testing form dated 11/14/23 indicated all smoke and fire doors passed inspection. Based on interview at the time of observation, the Facilities Supervisor stated the aforementioned smoke door contained small holes due to some type of astragal was removed at an unknown date. Based on observation and interview, the facility failed to ensure 4 of 4 power strips were not used as a substitute for fixed wiring to provide power equipment with a high current draw or were daisy chained according to LSC/2012 chapter 19 and NFPA-70/2011, 400.8. Findings include: Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/16/23 between 10:00 a.m. and 3:00 p.m., the following areas had improper use of power strips: A.) A refrigerator and a microwave (high power draw equipment) were plugged into and supplied power by a power strip in the Physician Lounge. B.) A refrigerator and a coffee pot (high power draw equipment) were plugged into and supplied power by a power strip in the EVS lounge. C.) In the Bio-med Office a power strip was plugged into and supplied power by another power strip. Based on interview at the time of observations, the Facilities Manager agreed there were improper use of power strips. The findings were reviewed with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, Director of Facilities and the Safety Coordinator during the exit conference.”

    Rule A0701. Standard-level.

  • Life Safety From Fire

    The inspectors’ words, 2,379 words

    “LIFE SAFETY FROM FIRE CFR(s): 482.41(b) Life Safety from Fire This Standard is not met as evidenced by: 47186 Based on observation and interview, the facility failed to ensure the penetration in 4 of 4 fire barrier walls that separated health care from business occupancies was maintained to ensure the fire resistance of the barrier. LSC 19.1.1.3 requires all health care facilities to be maintained and operated to minimize the possibility of a fire emergency requiring the evacuation of the occupants. LSC 8.3.5.1 requires penetrations for cables, cable trays, conduits, pipes, tubes, combustion vents and exhaust vents, wires, and similar items to accommodate electrical, mechanical, plumbing, and communications systems that pass through a wall, floor, or floor/ceiling assembly constructed as a fire barrier shall be protected by a firestop system or device. The firestop system or device shall be tested in accordance with ASTM E 814, Standard Test Method for Fire Tests of Through Penetration Fire Stops, or ANSI/UL 1479, Standard for Fire Tests of Through-Penetration Fire Stops. Findings include: Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/17/23 between 11:00 a.m. and 1:00 p.m., the following separation fire walls had unsealed penetrations. A.) Above the drop ceiling of the second-floor separation fire barrier by lab room A224 had an unsealed one-inch hole through the wall. B.) Above the drop ceiling of the second-floor separation fire barrier in the lab had an unsealed 1/4-inch gap between two pieces of drywall. C.) Above the drop ceiling of the second-floor separation fire barrier to Imaging had two 3-inch pipe sleeve ends that were not sealed. D.) Above the drop ceiling of the second-floor separation fire barrier in the Imaging work room there was a drywall patch covering a hole, but the patch was not sealed leaving a 1/8th of an inch gap between the wall and patch. E.) Above the drop ceiling of the second-floor separation fire barrier by room A239 there were three unsealed 1-inch holes. F.) Above the drop ceiling of the second-floor separation fire barrier by room A202 there was an unsealed 2-inch hole. G.) Above the drop ceiling of the second-floor separation fire barrier by MRI control room had a ½-inch gap around duct work. H.) Above the drop ceiling of the ER area separation fire barrier by the ER lounge had an unsealed 2-inch hole. I.) Above the drop ceiling by the rolling fire door of the ER area separation fire barrier had an unsealed 2-inch hole. J.) Above the drop ceiling of the ER area separation fire barrier by triage had a 6-inch pipe sleeve end that was not sealed. K.) Above the drop ceiling of the ER area separation fire barrier by public safety had a 3-inch pipe sleeve that was not sealed around the sleeve and at the end of the sleeve. L.) Above the drop ceiling of the north medical office separation fire barrier had a 3-inch pipe sleeve end that was not sealed. M.) Above the drop ceiling of the MOB separation fire barrier had a 6-inch by 4-inch hole/cutout in the wall. Based on interview at the time of observation, the Facilities Supervisor, the Facilities Manager, and Director of Facilities agreed all four separation fire barriers had unsealed penetrations. Based on observation and interview, the facility failed to maintain the building type of II (222) construction by ensuring through penetrations in 1 of 2 two-hour fire floor/ceiling barrier assemblies were maintained to ensure the fire resistance of the two-hour barrier. LSC 8.3.5.1 requires penetrations for cables, cable trays, conduits, pipes, tubes, combustion vents and exhaust vents, wires, and similar items to accommodate electrical, mechanical, plumbing, and communications systems that pass through a wall, floor, or floor/ceiling assembly constructed as a fire barrier shall be protected by a firestop system or device. The firestop system or device shall be tested in accordance with ASTM E 814, Standard Test Method for Fire Tests of Through Penetration Fire Stops, or ANSI/UL 1479, Standard for Fire Tests of Through-Penetration Fire Stops. Findings include: Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/17/23 at 12: 30 p.m., on the first floor above the drop ceiling by the triage firewall there was an unsealed 2-inch penetration around a drainage pipe in the two-hour floor/ceiling fire barrier. Based on interview at the time of observation, the Facilities Manager agreed the floor/ceiling fire barrier was not maintained as a two-hour barrier due to the unsealed hole through the barrier. Based on observation and interview, the facility failed to meet the clear width requirement for 1 of 1 CCU corridors or met an exception per 19.2.3.4(5). LSC 19.2.3.4(5) states where the corridor width is at least 8 feet, projections into the required width shall be permitted for fixed furniture, provided that all of the following conditions are met: (a) the fixed furniture is securely attached to the floor or to the wall. (b) the fixed furniture does not reduce the clear unobstructed corridor width to less than six feet, except as permitted by 19.2.3.4(2). (c) the fixed furniture is located only on one side of the corridor. (d) the fixed furniture is grouped such that each grouping does not exceed an area of 50 square feet. (e) the fixed furniture groupings addressed in 19.2.3.4(5) (d) are separated from each other by a distance of at least 10 feet. (f) the fixed furniture is located so as to not obstruct access to building service and fire protection equipment. (g) corridors throughout the smoke compartment are protected by an electrically supervised automatic smoke detection system in accordance with 19.3.4, or the fixed furniture spaces are arranged and located to allow direct supervision by the facility staff from a nurse’s station or similar space. (h) the smoke compartment is protected throughout by an approved, supervised automatic sprinkler system in accordance with 19.3.5.8 Findings include: Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/16/23 between 11:50 a.m., there were two chairs and an end table in the CCU hall, extended about two feet into the corridor, and were not affixed to the floor or to the wall when tested. Based on interview at the time of the observations, the Facilities Manager agreed the chairs and table were not securely attached to the floor or to the wall when tested. Based on observation and interview, the facility failed to ensure the corridor doors to 1 of 1 imaging storage rooms and 2 of 4 surgery center storerooms was protected as a hazardous area, had latching doors, and contained smoke resisting partitions and doors. Findings include: A.) Based on observations with Facilities Supervisor and the Safety Coordinator on 11/16/23 at 2:00 p.m., the imaging storeroom contained large amounts of combustible supply boxes, was greater than 50 square feet, and was not protected as a hazardous room. The room was equipped with double set of doors. There was about a ½ inch gap between the doors when the doors were in the closed position. This condition would allow smoke to escape the room in event of a fire. Also, the right door leaf of the set of doors did not have a positive latching device, and the left door leaf latched into the right door leaf which did not latch into the frame. Based on interview at the time of observation, the Facilities Supervisor agreed the room was used as storage, was larger than 50 square feet, stated there was a large gap between the doors when closed, and the doors did not latch into the frame. B.) Based on observations with the Director of Facilities, Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/17/23 between 10:00 a.m. and 11:30 a.m., the OR and EVS storerooms contained over 20 boxes of supplies, were greater than 50 square, therefore making the rooms hazardous areas. The storerooms were not protected as a hazardous area because the corridor doors to the rooms were not self-closing or automatic closing. Based on interview at the time of observation, the Facilities Manager agreed the storerooms contained large amount of combustible storage, was larger than 50 square feet, and the corridor doors to the rooms were not self-closing. Based on observation and interview, the facility failed to maintain the ceiling construction of 1 of 1 communication rooms accordance LSC and NFPA 13, 2010 edition, at 8.5.4.11., and failed to ensure 1 of 1 sprinkler heads in the morgue were not loaded and covered with foreign material in accordance with LSC and NFPA 25, 2011 edition, at 5.2.1.1.1. Findings include: A.) NFPA 13, 8.5.4.11 states the distance between the sprinkler deflector and the ceiling above shall be selected based on the type of sprinkler and the type of construction. Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/16/23 at 1:23 p.m., in the suspended ceiling IT room 229 there was a ceiling tile missing and exposed the ceiling about one to two feet above the suspended ceiling. This condition could delay the activation of the sprinklers installed on the suspended ceiling. Based on interview at the time of the observations, the Facilities Supervisor agreed there was a missing ceiling tile and exposed the ceiling above the drop ceiling. B.) NFPA 25, 5.2.1.1.1 states sprinklers shall not show signs of leakage and are free of corrosion, foreign materials, paint, and physical damage. Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/16/23 at 11:30 a.m., the one sprinkler head in the morgue was heavily loaded with foreign materials. Based on interview at the time of observation, the Facilities Manager, confirmed the sprinkler head in the morgue was loaded with foreign materials. Based on observation and interview, the facility failed to ensure the penetrations caused by the passage of wire and/or conduit through 13 of 17 smoke barrier walls were protected to maintain the smoke resistance of each smoke barrier. LSC Section 8.5.6.2 requires penetrations for cables, cable trays, conduits, pipes, tubes, vents, wires, and similar items to accommodate electrical, mechanical, plumbing, and communications systems that pass through a wall, floor, or floor/ceiling assembly constructed as a smoke barrier, or through the ceiling membrane of the roof/ceiling of a smoke barrier assembly, shall be protected by a system or material capable of restricting the movement of smoke. The firestop system or device shall be tested in accordance with ASTM E 814, Standard Test Method for Fire Tests of Through Penetration Fire Stops, or ANSI/UL 1479, Standard for Fire Tests of Through-Penetration Fire Stops. Findings include: Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/17/23 between 11:00 a.m. and 1:00 p.m., above the drop ceiling of the following smoke walls had unsealed penetrations and/or was sealed with material not meeting ASTM E 814: A.) The smoke wall by the OR nurses’ station had a 1-inch unsealed gap between a vent and the drywall and had four unsealed holes in the wall. B.) The smoke wall by PACU had penetrations filled with Joint Compound. C.) The smoke wall by the OR consultation room had a penetration sealed with Joint Compound and the end of a 1-inch pipe sleave was not sealed. D.) The smoke wall by surgical services had a 1/4-inch unsealed gap around wires. E.) The smoke wall by room 315 had an unsealed 4-inch hole in the wall. F.) The smoke wall by room 309 had an unsealed 4-inch hole in the wall. G.) The smoke wall by room 209 had penetrations filled with Joint Compound. H.) The smoke wall by room 215 had a 5x6 inch area where the cement was broken leaving 1/8-inch cracks in the wall. I.) The OB lobby smoke wall had three unsealed 1/4-inch gaps around pipes. J.) The Pharmacy smoke wall had three unsealed 1/4-inch gaps around pipes and Joint Compound was used to seal penetrations. K.) The smoke wall by room A-286 had an unsealed 1/4-inch gap around a wire. L.) The smoke wall by Respiratory had an unsealed 1/4-inch gap around a wire. M.) The smoke wall by Hospitality Services had an unsealed 1-inch hole and Joint Compound was used to seal penetrations. Based on interview at the time of observation, the Facilities Supervisor, the Facilities Manager, and Director of Facilities agreed the aforementioned smoke barriers had unsealed penetrations or were sealed with material that did not meet ASTM E 814. Based on record review and interview, the facility failed to conduct fire drills on each shift for 1 of 4 quarters. LSC 19.7.1.6 states drills shall be conducted quarterly on each shift to familiarize facility personnel (nurses, interns, maintenance engineers, and administrative staff) with the signals and emergency action required under varied conditions. Findings include: Based on records review with the Facilities Manager and the Safety Coordinator on 11/16/23 at 2:52 p.m., no documentation was available to show a second shift fire drill for the first quarter of 2023 was conducted. Based on interview at the time of record review, the Safety Coordinator agreed the aforementioned drill was missed, and stated the facility has implement an audit system to ensure drills are not missed. Based on observation and interview, the facility failed to ensure 3 of 3 oxygen storage rooms were provided with a precautionary sign readable from 5 feet is on each door or gate of a cylinder storage room, where the sign includes the wording as a minimum “CAUTION: OXIDIZING GAS(ES) STORED. Findings include: Based on observations with Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, and the Safety Coordinator on 11/16/23 between 10:00 a.m. and 3:00 p.m., the Main oxygen storeroom, and the two respiratory storerooms were used as storage for oxygen cylinders. The doors to the rooms were not provided with precautionary signs which states “CAUTION: OXIDIZING GAS(ES) STORED.” Based on interview at the time of observation, the Maintenance Director stated each storeroom did not have precautionary signs indicating storage of oxidizing gasses. The findings were reviewed with the Facilities Supervisor, the Facilities Manager, Nursing Quality Specialist, Director of Facilities and the Safety Coordinator during the exit conference.”

    Rule A0709. Standard-level.

  • Required Operating Room Equipment

    The inspectors’ words, 112 words

    “REQUIRED OPERATING ROOM EQUIPMENT CFR(s): 482.51(b)(3) The following equipment must be available to the operating room suites: call-in system, cardiac monitor, resuscitator, defibrillator, aspirator, and tracheotomy set. This Standard is not met as evidenced by: 38371 Based on observation and interview, the facility failed to provide required emergency equipment in 2 of 3 surgical areas toured. Findings Include: 1. On tour of the surgery department on 11/09/23 at 10: 40 am, this surveyor noted instruments to perform a tracheostomy, but no tracheostomy tubes. 2. Interview on 11/09/23 at 10:50 am with A7 (Nursing Manager Surgery/Surgical Admission/Pre-Admission Testing/Central Sterile Management) confirmed lack of tracheostomy tubes in or around the crash cart or department.”

    Rule A0956. Standard-level.

All 5 inspections in the last three years
Inspections on record
DateVisitWhat the record says
Feb 10, 2026Standard inspectionNo deficiencies cited
Feb 10, 2026Standard inspection3 deficiencies cited
Aug 26, 2024Standard inspection1 deficiency cited
Nov 17, 2023Standard inspection14 deficiencies cited
Nov 16, 2023Standard inspection4 deficiencies cited

How do patients fare?

  • CMS’s overall for it is 3 of 5.
  • Of the measures behind its , CMS counts against the national value: mortality, 0 better and 0 worse of 3; safety of care, 0 better and 0 worse of 2; readmission, 0 better and 0 worse of 6.
  • Patients rate it 3 of 5 in CMS’s patient survey (191 surveys completed, Oct 1, 2024 to Sep 30, 2025): 70% rated it 9 or 10 out of 10, and 63% would definitely recommend it.
  • Infections, compared by CMS with the national benchmark (Oct 1, 2024 to Sep 30, 2025): C. diff infections, no different than national benchmark.
  • CMS’s patient safety composite for serious complications, PSI 90, Jul 1, 2022 to Jun 30, 2024: no different than the national value.
  • Deaths within 30 days, as CMS gives them (Jul 1, 2022 to Jun 30, 2025): heart failure 11.7%, pneumonia 13.8%, stroke 10.5%. CMS gives no comparison with the national rate for them in this release.
  • Readmissions within 30 days, as CMS gives them (Jul 1, 2023 to Jun 30, 2025): heart failure 21.2%, pneumonia 16.4%, COPD 20%. CMS gives no comparison with the national rate for them in this release.
  • After outpatient care, compared by CMS: unplanned hospital visits after a colonoscopy, no different than the national rate; unplanned hospital visits after outpatient surgery, no different than expected.
  • Emergency department patients spent a median of 118 minutes there before leaving (Oct 1, 2024 to Sep 30, 2025), and 1% left before being seen.
  • 80% of patients with severe sepsis or septic shock got the care CMS measures, SEP-1 (Oct 1, 2024 to Sep 30, 2025).
  • Medicare’s spending per patient here is 0.92 times the national median (Jan 1, 2024 to Dec 31, 2024).
Ratings and measures, as published
MeasureRating
Overall ratingCMS’s overall hospital quality star rating, 1 to 53 of 5
Patient survey ratingCMS star rating from its survey of the hospital’s patients (HCAHPS), 1 to 53 of 5

Is it certified, and in good standing?

  • Medicare-certified acute care hospital since Jul 1, 1966.
  • Ownership: voluntary non-profit - private.
  • It is not accredited by a private organisation, so the state carries out its routine inspections for Medicare.
  • Cited at in the last three years: it didn’t meet a whole condition of Medicare’s rules for hospitals.
  • Voluntary non-profit - Private.
Source:

CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.

CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

Has it been penalized?

  • CMS doesn’t publish fines or other penalties for hospitals.
  • CMS cut its Medicare payments by 1% for fiscal year 2026 under the Hospital-Acquired Condition Reduction Program, which does so for the quarter of hospitals that fare worst on conditions patients get in hospital.
  • None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
Source:

CMS, Hospital-Acquired Condition (HAC) Reduction Program. Released Aug 13, 2026. Updated yearly.

CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.

CMS, QCOR Hospital 2567 statements of deficiencies. Released Oct 20, 2026. Updated monthly.

On record, newest first
DateWhatDetail
Medicare payment reduction (HAC Reduction Program)Fiscal year 2026: 1% of Medicare payments

What do patients say about their care?

  • CMS doesn’t publish staffing levels for hospitals.
  • In CMS’s patient survey, patients rate how well its nurses communicated 3 of 5.
  • 88% of its health care workers got a flu shot (Oct 1, 2024 to Mar 31, 2025).
Source:

CMS, Patient survey (HCAHPS) - Hospital and Timely and Effective Care - Hospital. Released Aug 13, 2026. Updated quarterly.

Who owns it?

  • Parkview Health System Inc. owns 100% directly since Oct 1, 2019.
  • 10 owners or officers are people: Jessica Bartock (corporate officer); Thomas Paul Mason (corporate director); Julie Mccormick (corporate officer); Scott Pflughoeft (corporate director); Jessica Lee-Hansen (corporate officer); Jessica Lee-Hansen (managing employee (on the payroll)); Shannon Perry (managing employee (on the payroll)); Claramary Winebrenner (corporate officer); Michael J Tullis (corporate director); Rick Henvey (corporate officer).
  • CMS’s Provider of Services file records 1 change of ownership.
  • No private-equity firm among the owners CMS lists.
  • No real-estate investment trust among the owners CMS lists.
Source:

CMS, Hospital All Owners and Hospital Enrollments. Released Sep 29, 2026. Updated monthly.

CMS, Provider of Services File - Hospital & Non-Hospital Facilities. Released Oct 14, 2026. Updated quarterly.

Organisations CMS lists
OrganisationRoleShareSince
Parkview Health System Inc.Owns 5% or more directly100%Oct 1, 2019

How does it compare nearby?

  • Of the 2 hospitals CMS lists in De Kalb County, 1 has an overall star rating from CMS: 1 rated 3 of 5.
  • CMS rates this one 3 of 5.
Source:

CMS, Hospital General Information. Released Aug 13, 2026. Updated quarterly.

1 compared
PlaceOverall star rating
Northeastern CenterNot given

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for hospitals, so none are shown. The one payment cut CMS publishes for each hospital, under its Hospital-Acquired Condition Reduction Program, is shown where it applies.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • Most hospitals are accredited by a private organisation (The Joint Commission, DNV and others) whose routine inspections stand in for the state’s; those reports aren’t public, and QCOR holds only the state’s surveys: no inspection on record here doesn’t mean none took place.
  • QCOR says its hospital inspection data are complete only through September 17, 2026, while it moves to a new system.
  • CMS doesn’t publish staffing levels for hospitals.
  • In its September 2026 release CMS gives no comparison with the national rate for death and readmission rates, though it gives the rates.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Nov 5, 2026.

From the hospital

The public record above comes first. Anything the hospital adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the hospital will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the hospital”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 28, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.