Hearth Record

Santa Fe Health Care Inc.

A home health agency in Benavides, Texas 78341

119 West Railroad Avenue, Benavides, Texas 78341. (361) 256-3980.

CMS’s own record, on Care Compare

Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.

The short answer

Record last released by CMS on Oct 21, 2026.

The last 24 months 2 deficiencies in 1 month of the last 36. Last cited Apr 2025. Most serious: Standard-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean3
Star ratings
CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.

What did inspectors find?

The last inspection on record was on Apr 1, 2025: a complaint and recertification inspection.

2 deficiencies cited in the last three years.

Source:

CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.

When those deficiencies happened

2 deficiencies in 1 month of the last 36. Last cited Apr 2025. Most serious: Standard-level. The last 3 years, to Oct 24, 2026.

2 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 NovDec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOct

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.

Apr 1, 2025: complaint and recertification inspection2 deficiencies
  • Ep Program Patient Population

    The inspectors’ words, 1,478 words

    “EP Program Patient Population CFR(s): 484.102(a)(3) §403.748(a)(3), §416.54(a)(3), §418.113(a)(3), §441.184(a)(3), §460.84(a)(3), §482.15(a)(3), §483.73(a)(3), §483.475(a)(3), §484.102(a)(3), §485.68(a)(3), §485.542(a)(3), §485.625(a)(3), §485.727(a)(3), §485.920(a)(3), §491.12(a)(3), §494.62(a)(3). [(a) Emergency Plan. The [facility] must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least every 2 years. The plan must do the following:] (3) Address [patient/client] population, including, but not limited to, persons at-risk; the type of services the [facility] has the ability to provide in an emergency; and continuity of operations, including delegations of authority and succession plans.** *[For LTC facilities at §483.73(a):] Emergency Plan. The LTC facility must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least annually. The plan must do all of the following: (3) Address resident population, including, but not limited to, persons at-risk; the type of services the LTC facility has the ability to provide in an emergency; and continuity of operations, including delegations of authority and succession plans. *NOTE: [“Persons at risk” does not apply to: ASC, hospice, PACE, HHA, CORF, CMCH, RHC/FQHC, or ESRD facilities.] This Standard is not met as evidenced by: Based on record review and interview, the Agency’s written emergency preparedness and response plan (ERP) failed to include a continuity of operations business plan that addressed essential functions for patient services, critical personnel and how to return to normal operations as quickly as possible for 3 of (2022, 20234, and 2024) of 3 years reviewed. This failure could place the Agency’s active clients at risk of harm from employees that are unfamiliar with their job responsibilities during a natural or man-made disaster or emergency. The findings included: Record review of the Agency’s Emergency preparedness and response binder included a completed “Ready Business, Business Emergency Plan…Business Continuity and Disaster Preparedness Plan” not signed or dated, that addressed the Agency’s “Plan to stay in Business…” Record review of the Agency’s “Business Emergency Plan” not signed or dated, revealed the following sections were left blank, “Evacuation plan for…. If we must leave the workplace quickly [section left blank] …1. Warming system [section left blank] …2 Assembly site [section left blank] …3. Assembly site manager and alternate [section left blank] …Responsibilities include [section left blank] … 4. Shut down manager and alternate [section left blank] …Responsibilities include… 5. [section left blank] is responsible for issuing all clear… Shelter in place…3. Seal the room Shelter Location [section left blank] …4. Shelter Location & Alternate [section left blank]…Responsibilities include [section left blank]….5 Shut Down Manager & Alternate [section left blank]…Responsibilities include [section left blank]… 6 [section left blank] is responsible for issuing all clear…Records back up….If our accounting and payroll records are destroyed, we will provide for continuity in the following ways…[section left blank]…Annual review…We will review and update this business continuity and disaster plan in [section left blank]….” Record review of the Agency’s “Business Emergency Plan” not signed or dated, revealed the following sections were left blank, “Evacuation plan for…. If we must leave the workplace quickly [section left blank] …1. Warming system [section left blank] …2 Assembly site [section left blank] …3. Assembly site manager and alternate [section left blank] …Responsibilities include [section left blank] … 4. Shut down manager and alternate [section left blank] …Responsibilities include… 5. [section left blank] is responsible for issuing all clear… Shelter in place…3. Seal the room Shelter Location [section left blank] …4. Shelter Location & Alternate [section left blank]…Responsibilities include [section left blank]….5 Shut Down Manager & Alternate [section left blank]…Responsibilities include [section left blank]… 6 [section left blank] is responsible for issuing all clear…Records back up….If our accounting and payroll records are destroyed, we will provide for continuity in the following ways…[section left blank]…Annual review…We will review and update this business continuity and disaster plan in [section left blank]….” Record review of the Agency’s “Business Emergency Plan” not signed or dated, failed to document the actions and responsibilities of Agency staff in each phase of emergency planning, including mitigation, preparedness response and recovery. In a simultaneous record review of the Agency’s “Emergency Preparedness and Response Plan” binder and interview on 03/27/25 at 11:00 a.m., the DON identified herself as the Disaster Coordinator. The DON identified the Office Mgr. as the Alt Disaster Coordinator. At 11:10 a.m. the DON called the Office Mgr. for assistance in reviewing the ERP binder and identifying the Business Continuity Plan. The DON stated the plan just “tells you what to do during the disaster” but not how to return to normal operations. The DON stated they had been doing this [DON/Disaster Coordinator] for so long “over 20 years” and new how to run the ERP. The DON stated they could run the ERP based on their experience. The DON stated the plan was not accurate and could understand how someone could have a problem with the ERP because she could not find anything in the “book” [ERP binder]. In a simultaneous record review of the Agency’s “Emergency Preparedness and Response Plan” binder and interview on 03/27/25 at 11:10 a.m. the Office Mgr. identified herself as the Alt Disaster Coordinator. The Office Mgr. identified the Ready Business, Business Emergency Plan…Business Continuity and Disaster Preparedness Plan as the Agency’s Business Continuity Plan. The Office Mgr. stated the Agency’s ERP did not document the actions and responsibilities of each staff during each phase of emergency planning or how the Agency would be returning to normal operations in a natural or man-made disaster. The Office Mgr. stated, “it might be in the Agency’s policy, but it has to be in the Plan” The Office Mgr. stated the ERP did not have the actions or responsibilities for each staff during each phase of the ERP including mitigation, preparedness, response, and recovery. The Office Mgr. stated we “need to make it easier”. The Office Mgr. stated, “we do not have it [documentation on how to return to normal operations]”. The Office Mgr. stated the Agency’s plan was accurate for the Agency, but she could understand how someone else could have a problem with it. The Office Mgr. stated the ERP was not complete and that it could potentially be disastrous to active clients because the Agency would not be able to carry out emergency procedures immediately. In an interview on 03/27/25 at 03:20 p.m., the Adm stated the DON and Office Mgr. were the Disaster Coordinator and Alternate Disaster Coordinator for the Agency. The Adm stated the Agency had been using the same forms for Emergency preparedness in previous surveys and have not had any issues. In a follow up interview on 04/01/25 at 11:30 a.m., the Office Mgr. confirmed the ERP was reviewed annually and that the form “Ready Business, Business Emergency Plan…Business Continuity and Disaster Preparedness Plan” was updated annually. The Office Mgr. stated the form from the previous year was then pushed further back in the binder as newer forms were added to the binder. The Office Mgr. stated the Agency was following the consultant’s recommendations for the Agency’s Emergency Preparedness and Response Plan. The Office Mgr. stated the Agency did not double check to ensure the Agency was following state/federal regulations for compliance. In a simultaneous interview on 04/01/25 at 11:45 a.m., the Office Mgr. and the DON stated the Agency was not able to provide documentation of the forms from previous years. The Office Mgr. and DON confirmed the “Ready Business, Business Emergency Plan…Business Continuity and Disaster Preparedness Plan” that listed the current DON and Office Mgr. as the Disaster Coordinator and Alternate Disaster Coordinator was used for 2023,2024, and 2025. The Office Mgr. stated the “Ready Business, Business Emergency Plan…Business Continuity and Disaster Preparedness Plan” that listed the previous employees was used prior to 2021. The Office Mgr. stated the Agency was recommended they use those forms as their ERP but did not ensure it had all the components needed. The Office Mgr. confirmed the “Ready Business, Business Emergency Plan…Business Continuity and Disaster Preparedness Plan” did not document the essential functions for patient services, critical personnel, or how to return to normal operations. Record review of the Agency’s policy titled “EC.8 Emergency Preparedness Policy and Plan”, with a revised date 07/11/23, quoted in part, “I. Agency will develop a Business and Continuity and Disaster Preparedness Plan to ensure needs of agency staff and patients are met… 6. Agency leaders will develop the Business and Continuity and Disaster Preparedness Plan which will be maintained in the Emergency Preparedness and Response Plan Manual to address the following. This document will be maintained separately from this policy, as it addresses the specific details of the agency’s information that may change on an ongoing basis, while this policy and procedure for implementation does not change depending on the agency’s physical address and other demographic information… c. essential functions for patient services…. d. critical personnel, roles, and responsibilities…h. how to return to normal operations as quickly as possible…””

    Rule E0007. Standard-level. From a complaint.

  • Encoding And Transmitting Oasis

    The inspectors’ words, 996 words

    “Encoding and transmitting OASIS CFR(s): 484.45(a) Standard: An HHA must encode and electronically transmit each completed OASIS assessment to the CMS system, regarding each beneficiary with respect to which information is required to be transmitted (as determined by the Secretary), within 30 days of completing the assessment of the beneficiary. This Standard is not met as evidenced by: Based on record review and interview, the Agency failed to transmit completed OASIS (Outcome and Assessment Information Set) assessments within 30 days of completions for 1,056 of 4,617 assessments submitted between 03/01/24 through 03/20/25. This failure prevented the patient’s data from being made available to the Center’s for Medicare and Medicaid (CMS) for analysis to identify Agency performance levels in the provision of patient care. Findings included: Record review of the IQIES (Internet Quality Improvement and Evaluation System) “Home Health Error by Summary Agency” report generated from the CMS national data system during presurvey preparation on 03/19/25 revealed the Agency had submitted and processed 4,587 assessments. The report indicated the Agency had 22.91% of assessments with -3330 error that indicated the assessments were submitted after the 30th date of the M0090 (last date that information used to complete the comprehensive assessment and determine OASIS coding was gathered by the assessing clinician and documentation of the specific responses completed). date. Record review of the Agency OASIS final validation reports dated 03/01/25 through 03/20/25 revealed 4,617 assessments were processed by the Agency. Further review of the Agency OASIS final validation reports 1,056 of the 4,617 had error -3330 indicating those record were submitted after the 30th date of the M0090 date. In an interview on 03/27/25 at 02:25 p.m., the DON stated QA (Quality Assurance) department performed exporting OASIS assessments for both the parent Agency and the branch. The DON stated the Agency’s policy for exporting and submitting OASIS assessments to CMS was 30 days. The DON stated the RN performed an assessment and submitted the assessment to the Agency’s QA department. The DON stated that the QA department would then revise it and send it to the nurse for corrections or submit it to CMS, but if it was sent to the nurse the nurse would then have to return it to the QA department with corrections before it was sent to CMS. The DON stated there were only 2 LVNs in the QA department responsible for revising assessments and exporting all the Agency’s assessments to CMS. The DON stated the Agency had a process in place where the nurse would see “OASIS in their box” and they “don’t start seeing patients until the OASIS has been completed”. The DON stated this was completed on a “daily basis, ever morning”. In an interview on 03/27/25 at 02:35 p.m., LVN K stated she was responsible for the exporting of OASIS assessments in the QA department and had been doing that for over 19 years. LVN K stated the Agency’s policy for exporting and submitting OASIS assessments to CMS should be done within 30 days. LVN K stated the Agency had been having some “issues” with previous nurses who had been “let go” because they were not submitting their assessments in a timely manner. LVN K stated the Agency has had improvement in submitting OASIS assessments and not had “as many late” OASIS assessments submissions. LVN K stated she tried to export every Friday and sometimes exported every day. LVN K stated on occasion the assessments had been sent but because the assessments needed corrections, they had to retrieve the already submitted OASIS assessment and when they tried to re-submit the assessment again, it would then be late. LVN K stated once the QA department receives the OASIS assessments, they revise them and submit the plan of correction for signature and return the assessment to the nurse for corrections if needed. LVN K stated the assessments should have very minimal corrections and if they do go back to the nurse for corrections, the QA department attempted to “get them back or contact the nurse immediately” so they could return the assessment to the QA department. LVN K stated submitting the OASIS assessments to CMS has also improved because the system gives the Agency the “report right then and there”. LVN K stated the report gave the Agency all errors immediately, so the Agency knew if there were any late submissions, and they did not have to wait an “hour or more” for those reports. LVN K stated those changes had been implemented since “December, very recent”. In an interview on 03/27/25 at 02:45 p.m., the Office Mgr. stated she did not know what the policy for exporting OASIS assessments to CMS was. The Office Mgr. stated the DON, and the QA department were responsible for ensuring the assessments were submitted. In an interview on 03/27/25 at 03:20 p.m., the Adm stated Agency policy for submitting OASIS assessments were 30 days. The Adm stated the DON and QA department was responsible for ensuring the assessments were submitted to CMS. Record review of Agency policies titled, “IM.9 Timelines” with a revised date 07/01/21, quoted in part, “To establish timeframes for completions and incorporation of paperwork and OASIS into the clinical record…A. Agency will ensure timely provision of care and services to meet the patient’s needs in compliance with all federal and state laws and regulations and standards of practice…17. Encoding and transmission of OASIS data to CMS (Centers for Medicare and Medicaid) is performed at least monthly and prior to billing. The OASIS is required to be transmitted to CMS within 30 days of date of assessment is completed (M0090) …” Record review of Agency policies titled, “IM.10 OASIS Collecting, Encoding and Transmitting” with a revised date 01/01/21, quoted in part, “Timepoints for completing OASIS include…The Agency must encode and electronically transmit each completed OASIS assessment to the CMS system, for each beneficiary with respect to which information is required to be transmitted within 30 days of completing the assessment of the beneficiary…””

    Rule G0372. Standard-level. From a complaint.

The one inspection in the last three years
Inspections on record
DateVisitWhat the record says
Apr 1, 2025Complaint and recertification inspection2 deficiencies cited

Is it certified?

  • Medicare-certified home health agency since Jul 16, 2004.
  • Ownership: proprietary (for profit).
  • No deficiency on record in the last three years.
Source:

CMS, Home Health Care Agencies. Released Oct 21, 2026. Updated quarterly.

CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.

Has anything been proven against it?

  • CMS doesn’t publish fines or other penalties for home health agencies, so none are shown.
  • 2 deficiencies cited in the last three years came from inspections that included a complaint investigation.
Source:

CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.

Who does the caring?

  • Offers nursing care, physical therapy, occupational therapy, speech pathology, medical social services and home health aide services.
  • CMS doesn’t publish staffing levels for home health agencies.
Source:

CMS, Home Health Care Agencies. Released Oct 21, 2026. Updated quarterly.

Who owns it?

  • 4 owners or officers are people: Priscilla Garza (owns 5% or more directly, 100%); Priscilla Garza (corporate officer); Priscilla Garza (corporate director); Priscilla Garza (managing employee (on the payroll)).
  • No private-equity firm among the owners CMS lists.
  • No real-estate investment trust among the owners CMS lists.
Source:

CMS, Home Health Agency All Owners and Home Health Agency Enrollments. Released Sep 29, 2026. Updated quarterly.

How do patients fare?

  • CMS rates its quality of patient care 2 of 5.
  • Patients rate it 4 of 5 in CMS’s patient survey (189 surveys completed): 92% rated it 9 or 10 out of 10, and 84% would definitely recommend it.
  • CMS compares it with the national rate: discharged to the community, worse; potentially preventable hospital stays, the same; potentially preventable readmissions after discharge, the same.
Source:

CMS, Home Health Care Agencies and Home Health Patient Survey. Released Oct 21, 2026. Updated quarterly.

Ratings and measures, as published
MeasureRating
Quality of patient care ratingCMS star rating, 1 to 5 in half stars2 of 5
Patient survey ratingCMS star rating from its survey of the agency’s patients, 1 to 54 of 5
Discharged to the communityCMS’s risk-adjusted rate, compared with the national rate58.12% (worse than the national rate)
Potentially preventable hospital staysCMS’s risk-adjusted rate, compared with the national rate13.47% (same as the national rate)
Potentially preventable readmissions after dischargeCMS’s risk-adjusted rate, compared with the national rate3.93% (same as the national rate)

How does it compare nearby?

  • Of the 16 agencies CMS’s data show serving patients in ZIP code 78341, where this agency’s office is, 14 have a quality of patient care rating; the middle one is 2 of 5, and this one is rated 2 of 5.
Source:

CMS, Home Health ZIP Codes and Home Health Care Agencies. Released Oct 21, 2026. Updated quarterly.

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for home health agencies, so none are shown.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • QCOR says some of its home health reports are accurate or available only through May 19, 2021, because of a systems migration.
  • Many home health agencies are inspected by a private accrediting organisation instead of the state, and QCOR’s home health file doesn’t appear to include those inspections: no inspection on record here doesn’t mean none took place.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Oct 24, 2026.

From the agency

The public record above comes first. Anything the agency adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the agency will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the agency”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 28, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.