Hearth Record

Genesis Home Health Services, Inc.

A home health agency in Ely, Nevada 89301

705 Avenue K Ste C, Ely, Nevada 89301. (775) 289-2226.

CMS’s own record, on Care Compare

Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.

The short answer

Record last released by CMS on Oct 21, 2026.

The last 24 months 12 deficiencies in 1 month of the last 36. Last cited Apr 2025. Most serious: Standard-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean3
Star ratings
CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.

What did inspectors find?

The last inspection on record was on Apr 2, 2025: a recertification inspection.

12 deficiencies cited in the last three years.

Source:

CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.

When those deficiencies happened

12 deficiencies in 1 month of the last 36. Last cited Apr 2025. Most serious: Standard-level. The last 3 years, to Oct 24, 2026.

12 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 NovDec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOct

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.

Apr 2, 2025: recertification inspection12 deficiencies
  • Develop Ep Plan, Review And Update Annually

    The inspectors’ words, 323 words

    “Develop EP Plan, Review and Update Annually CFR(s): 484.102(a) §403.748(a), §416.54(a), §418.113(a), §441.184(a), §460.84(a), §482.15(a), §483.73(a), §483.475(a), §484.102(a), §485.68(a), §485.542(a), §485.625(a), §485.727(a), §485.920(a), §486.360(a), §491.12(a), §494.62(a). The [facility] must comply with all applicable Federal, State and local emergency preparedness requirements. The [facility] must develop establish and maintain a comprehensive emergency preparedness program that meets the requirements of this section. The emergency preparedness program must include, but not be limited to, the following elements: (a) Emergency Plan. The [facility] must develop and maintain an emergency preparedness plan that must be [reviewed], and updated at least every 2 years. The plan must do all of the following: * [For hospitals at §482.15 and CAHs at §485.625(a):] Emergency Plan. The [hospital or CAH] must comply with all applicable Federal, State, and local emergency preparedness requirements. The [hospital or CAH] must develop and maintain a comprehensive emergency preparedness program that meets the requirements of this section, utilizing an all-hazards approach. * [For LTC Facilities at §483.73(a):] Emergency Plan. The LTC facility must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least annually. * [For ESRD Facilities at §494.62(a):] Emergency Plan. The ESRD facility must develop and maintain an emergency preparedness plan that must be [evaluated], and updated at least every 2 years. . This Standard is not met as evidenced by: Based on review of the Home Health Agency’s (HHA’s) emergency preparedness (EP) plan and interview, the HHA failed to ensure the EP was reviewed at least every two years. This had the potential to affect the 11 patients currently receiving services from the HHA. Findings include: Review of the HHA’s EP plan revealed no evidence the HHA had reviewed their EP within the last two years. During an interview on 04/01/25 at 10:30 AM, the Director of Clinical Services, the Chief Executive Officer and the Chief Clinical Officer confirmed the EP had not been reviewed within the last two years.”

    Rule E0004. Standard-level.

  • Ep Program Patient Population

    The inspectors’ words, 295 words

    “EP Program Patient Population CFR(s): 484.102(a)(3) §403.748(a)(3), §416.54(a)(3), §418.113(a)(3), §441.184(a)(3), §460.84(a)(3), §482.15(a)(3), §483.73(a)(3), §483.475(a)(3), §484.102(a)(3), §485.68(a)(3), §485.542(a)(3), §485.625(a)(3), §485.727(a)(3), §485.920(a)(3), §491.12(a)(3), §494.62(a)(3). [(a) Emergency Plan. The [facility] must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least every 2 years. The plan must do the following:] (3) Address [patient/client] population, including, but not limited to, persons at-risk; the type of services the [facility] has the ability to provide in an emergency; and continuity of operations, including delegations of authority and succession plans.** *[For LTC facilities at §483.73(a):] Emergency Plan. The LTC facility must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least annually. The plan must do all of the following: (3) Address resident population, including, but not limited to, persons at-risk; the type of services the LTC facility has the ability to provide in an emergency; and continuity of operations, including delegations of authority and succession plans. *NOTE: [“Persons at risk” does not apply to: ASC, hospice, PACE, HHA, CORF, CMCH, RHC/FQHC, or ESRD facilities.] This Standard is not met as evidenced by: Based on review of the Home Health Agency’s (HHA’s) emergency preparedness (EP) plan and interview, the HHA failed to ensure the EP addressed the type of services the HHA could provide in an emergency. This had the potential to affect the 11 patients currently receiving services from the HHA. Findings include: Review of the HHA’s EP plan revealed no evidence the HHA had reviewed their EP within the last two years including the type of services the HHA can provide during an emergency. During an interview on 04/01/25 at 10:30 AM, the Director of Clinical Services, the Chief Executive Officer and the Chief Clinical Officer confirmed the above findings.”

    Rule E0007. Standard-level.

  • Local, State, Tribal Collaboration Process

    The inspectors’ words, 282 words

    “Local, State, Tribal Collaboration Process CFR(s): 484.102(a)(4) §403.748(a)(4), §416.54(a)(4), §418.113(a)(4), §441.184(a)(4), §460.84(a)(4), §482.15(a)(4), §483.73(a)(4), §483.475(a)(4), §484.102(a)(4), §485.68(a)(4), §485.542(a)(4), §485.625(a)(4), §485.727(a)(5), §485.920(a)(4), §486.360(a)(4), §491.12(a)(4), §494.62(a)(4) [(a) Emergency Plan. The [facility] must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least every 2 years [annually for LTC facilities]. The plan must do the following:] (4) Include a process for cooperation and collaboration with local, tribal, regional, State, and Federal emergency preparedness officials’ efforts to maintain an integrated response during a disaster or emergency situation. * * [For ESRD facilities only at §494.62(a)(4)]: (4) Include a process for cooperation and collaboration with local, tribal, regional, State, and Federal emergency preparedness officials’ efforts to maintain an integrated response during a disaster or emergency situation. The dialysis facility must contact the local emergency preparedness agency at least annually to confirm that the agency is aware of the dialysis facility’s needs in the event of an emergency. This Standard is not met as evidenced by: Based on review of the Home Health Agency’s (HHA’s) emergency preparedness (EP) plan and interview, the HHA failed to ensure the plan included cooperations and collaboration with local, tribal, regional, State, and Federal emergency officials. This had the potential to affect the 11 patients currently receiving services from the HHA. Findings include: Review of the HHA’s EP plan revealed no evidence the HHA had a process to ensure cooperation and collaboration with local, tribal, regional, State, and Federal emergency preparedness officials to ensure an integrated response during a disaster or emergency. During an interview on 04/01/25 at 10:30 AM, the Director of Clinical Services, the Chief Executive Officer and the Chief Clinical Officer confirmed the above findings.”

    Rule E0009. Standard-level.

  • Development Of Ep Policies And Procedures

    The inspectors’ words, 461 words

    “Development of EP Policies and Procedures CFR(s): 484.102(b) §403.748(b), §416.54(b), §418.113(b), §441.184(b), §460.84(b), §482.15(b), §483.73(b), §483.475(b), §484.102(b), §485.68(b), §485.542(b), §485.625(b), §485.727(b), §485.920(b), §486.360(b), §491.12(b), §494.62(b). (b) Policies and procedures. [Facilities] must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least every 2 years. *[For LTC facilities at §483.73(b):] Policies and procedures. The LTC facility must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least annually. *Additional Requirements for PACE and ESRD Facilities: *[For PACE at §460.84(b):] Policies and procedures. The PACE organization must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must address management of medical and nonmedical emergencies, including, but not limited to: Fire; equipment, power, or water failure; care-related emergencies; and natural disasters likely to threaten the health or safety of the participants, staff, or the public. The policies and procedures must be reviewed and updated at least every 2 years. *[For ESRD Facilities at §494.62(b):] Policies and procedures. The dialysis facility must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least every 2 years. These emergencies include, but are not limited to, fire, equipment or power failures, care-related emergencies, water supply interruption, and natural disasters likely to occur in the facility’s geographic area. This Standard is not met as evidenced by: Based on review of the Home Health Agency’s (HHA’s) emergency preparedness (EP) plan and interview, the HHA failed to ensure the EP was based on the HHA’s risk assessment for potential hazards. This had the potential to affect the 11 patients currently receiving services from the HHA. Findings include: Review of the HHA’s EP plan revealed no evidence the HHA had performed a risk assessment for the basis of the HHA’s EP plan. During an interview on 04/01/25 at 10:30 AM, the Director of Clinical Services, the Chief Executive Officer and the Chief Clinical Officer confirmed the above findings.”

    Rule E0013. Standard-level.

  • Homebound Hha/Hospice Inform Ep Officials

    The inspectors’ words, 261 words

    “Homebound HHA/Hospice Inform EP Officials CFR(s): 484.102(b)(2) §418.113(b)(2), §460.84(b)(4), §484.102(b)(2) [(b) Policies and procedures. The [facilities] must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least every 2 years. At a minimum, the policies and procedures must address the following:] *[For homebound Hospice at §418.113(b)(2), PACE at §460.84(b)(4), and HHAs at §484.102(b)(2):] The procedures to inform State and local emergency preparedness officials about [homebound Hospice, PACE or HHA] patients in need of evacuation from their residences at any time due to an emergency situation based on the patient’s medical and psychiatric condition and home environment. This Standard is not met as evidenced by: Based on review of the Home Health Agency’s (HHA’s) emergency preparedness (EP) plan and interview, the HHA failed to develop policies to inform state and local emergency officials about patients in need of evacuation from their homes at any time due to an emergency. This had the potential to affect the 11 patients currently receiving services from the HHA. Findings include: Review of the HHA’s EP plan revealed no evidence the HHA had developed policies to notify state and local emergency officials of patients in need of evacuation during an emergency. During an interview on 04/01/25 at 10:30 AM, the Director of Clinical Services, the Chief Executive Officer and the Chief Clinical Officer confirmed the above findings.”

    Rule E0019. Standard-level.

  • Hha- Procedures For Follow Up Staff/Pts.

    The inspectors’ words, 269 words

    “HHA- Procedures for Follow up Staff/Pts. CFR(s): 484.102(b)(3) §484.102(b)(3) Condition of Participation: [(b) Policies and procedures. The HHA must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least every 2 years. At a minimum, the policies and procedures must address the following:] (3) The procedures to follow up with on-duty staff and patients to determine services that are needed, in the event that there is an interruption in services during or due to an emergency. The HHA must inform State and local officials of any on-duty staff or patients that they are unable to contact. This Standard is not met as evidenced by: Based on review of the Home Health Agency’s (HHA) emergency preparedness (EP) plan and interview, the HHA failed to ensure the EP plan included notifying the state and local officials of any on-duty staff or patients that the HHA had been unable to contact during an emergency situation. This had the potential to affect the 11 patients currently receiving services from the HHA. Findings include: Review of the HHA’s EP plan revealed no evidence the HHA included notification of the state and local officials of on-duty staff or patients the HHA had been unable to contact during an emergency. During an interview on 04/01/25 at 10:30 AM, the Director of Clinical Services, the Chief Executive Officer and the Chief Clinical Officer confirmed the above findings.”

    Rule E0021. Standard-level.

  • Policies/Procedures-Volunteers And Staffing

    The inspectors’ words, 324 words

    “Policies/Procedures-Volunteers and Staffing CFR(s): 484.102(b)(5) §403.748(b)(6), §416.54(b)(5), §418.113(b)(4), §441.184(b)(6), §460.84(b)(7), §482.15(b)(6), §483.73(b)(6), §483.475(b)(6), §484.102(b)(5), §485.68(b)(4), §485.542(b)(6), §485.625(b)(6), §485.727(b)(4), §485.920(b)(5), §491.12(b)(4), §494.62(b)(5). [(b) Policies and procedures. The [facilities] must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least every 2 years [annually for LTC facilities]. At a minimum, the policies and procedures must address the following:] (6) [or (4), (5), or (7) as noted above] The use of volunteers in an emergency or other emergency staffing strategies, including the process and role for integration of State and Federally designated health care professionals to address surge needs during an emergency. *[For RNHCIs at §403.748(b):] Policies and procedures. (6) The use of volunteers in an emergency and other emergency staffing strategies to address surge needs during an emergency. *[For Hospice at §418.113(b):] Policies and procedures. (4) The use of hospice employees in an emergency and other emergency staffing strategies, including the process and role for integration of State and Federally designated health care professionals to address surge needs during an emergency. This Standard is not met as evidenced by: Based on review of the Home Health Agency’s (HHA’s) emergency preparedness (EP) plan and interview, the HHA failed to ensure the EP addressed the use of volunteers during an emergency situation and contained emergency staffing strategies. This had the potential to affect the 11 patients currently receiving services from the HHA. Findings include: Review of the HHA’s EP plan revealed no evidence the HHA developed a plan related to the use of volunteers during an emergency situation and emergency staffing strategies. During an interview on 04/01/25 at 10:30 AM, the Director of Clinical Services, the Chief Executive Officer and the Chief Clinical Officer confirmed the above findings.”

    Rule E0024. Standard-level.

  • Development Of Communication Plan

    The inspectors’ words, 181 words

    “Development of Communication Plan CFR(s): 484.102(c) §403.748(c), §416.54(c), §418.113(c), §441.184(c), §460.84(c), §482.15(c), §483.73(c), §483.475(c), §484.102(c), §485.68(c), §485.542(c), §485.625(c), §485.727(c), §485.920(c), §486.360(c), §491.12(c), §494.62(c). (c) The [facility] must develop and maintain an emergency preparedness communication plan that complies with Federal, State and local laws and must be reviewed and updated at least every 2 years [annually for LTC facilities]. This Standard is not met as evidenced by: Based on review of the Home Health Agency’s (HHA’s) emergency preparedness (EP) plan and interview, the HHA failed to collaborate with Federal, State, and local officials to ensure their communication plan complies with Federal, State, and local requirements. This had the potential to affect all 11 patients served by the agency in case of an emergency situation. Findings include: Review of the HHA’s EP plan revealed no evidence the HHA collaborated with Federal, State, and local officials to ensure the communication plan complied with Federal, State, and local requirements. During an interview on 04/01/25 at 10:30 AM, the Director of Clinical Services, the Chief Executive Officer and the Chief Clinical Officer confirmed the above findings.”

    Rule E0029. Standard-level.

  • Emergency Officials Contact Information

    The inspectors’ words, 279 words

    “Emergency Officials Contact Information CFR(s): 484.102(c)(2) §403.748(c)(2), §416.54(c)(2), §418.113(c)(2), §441.184(c)(2), §460.84(c)(2), §482.15(c)(2), §483.73(c)(2), §483.475(c)(2), §484.102(c)(2), §485.68(c)(2), §485.542(c)(2), §485.625(c)(2), §485.727(c)(2), §485.920(c)(2), §486.360(c)(2), §491.12(c)(2), §494.62(c)(2). [(c) The [facility] must develop and maintain an emergency preparedness communication plan that complies with Federal, State and local laws and must be reviewed and updated at least every 2 years [annually for LTC facilities]. The communication plan must include all of the following: (2) Contact information for the following: (i) Federal, State, tribal, regional, and local emergency preparedness staff. (ii) Other sources of assistance. *[For LTC Facilities at §483.73(c):] (2) Contact information for the following: (i) Federal, State, tribal, regional, and local emergency preparedness staff. (ii) The State Licensing and Certification Agency. (iii) The Office of the State Long-Term Care Ombudsman. (iv) Other sources of assistance. *[For ICF/IIDs at §483.475(c):] (2) Contact information for the following: (i) Federal, State, tribal, regional, and local emergency preparedness staff. (ii) Other sources of assistance. (iii) The State Licensing and Certification Agency. (iv) The State Protection and Advocacy Agency. This Standard is not met as evidenced by: Based on record review and interview, the home health agency (HHA) failed to ensure the HHA’s communication plan included contact information for Federal, State, tribal, and regional emergency preparedness officials. This deficient practice had the potential to affect the 11 patients and staff in the event a disaster occurred. Findings include: Review of the agency’s emergency preparedness plan indicated the communication plan did not include contact information for Federal, State, tribal, and regional emergency preparedness officials. During an interview on 04/01/25 at 10:30 AM, the Director of Clinical Services, the Chief Executive Officer and the Chief Clinical Officer confirmed the above findings.”

    Rule E0031. Standard-level.

  • Information On Occupancy/Needs

    The inspectors’ words, 299 words

    “Information on Occupancy/Needs CFR(s): 484.102(c)(6) §403.748(c)(7), §416.54(c)(7), §418.113(c)(7) §441.184(c)(7), §482.15(c)(7), §460.84(c)(7), §483.73(c)(7), §483.475(c)(7), §484.102(c)(6), §485.68(c)(5), §485.68(c)(5), §485.727(c)(5), §485.542(c)(7), §485.625(c)(7), §485.920(c)(7), §491.12(c)(5), §494.62(c)(7). [(c) The [facility] must develop and maintain an emergency preparedness communication plan that complies with Federal, State and local laws and must be reviewed and updated at least every 2 years [annually for LTC facilities]. The communication plan must include all of the following: (7) [(5) or (6)] A means of providing information about the [facility’s] occupancy, needs, and its ability to provide assistance, to the authority having jurisdiction, the Incident Command Center, or designee. *[For ASCs at 416.54(c)]: (7) A means of providing information about the ASC’s needs, and its ability to provide assistance, to the authority having jurisdiction, the Incident Command Center, or designee. *[For Inpatient Hospice at §418.113(c):] (7) A means of providing information about the hospice’s inpatient occupancy, needs, and its ability to provide assistance, to the authority having jurisdiction, the Incident Command Center, or designee. This Standard is not met as evidenced by: Based on record review and interview, the home health agency (HHA) failed to develop a procedure for providing information about the HHA’s occupancy, needs, and its’ ability to assist the authority having jurisdiction, the Incident Command Center, or designee during a disaster. This deficient practice had the potential to affect all 11 patients and staff in the event a disaster occurred. Findings include: Review of the agency’s emergency preparedness plan indicated the plan did not include procedures for providing information about the HHA’s occupancy, needs, and its ability to assist the authority having jurisdiction, the Incident Command Center, or designee during a disaster. During an interview on 04/01/25 at 10:30 AM, the Director of Clinical Services, the Chief Executive Officer and the Chief Clinical Officer confirmed the above findings.”

    Rule E0034. Standard-level.

  • Ep Training And Testing

    The inspectors’ words, 487 words

    “EP Training and Testing CFR(s): 484.102(d) §403.748(d), §416.54(d), §418.113(d), §441.184(d), §460.84(d), §482.15(d), §483.73(d), §483.475(d), §484.102(d), §485.68(d), §485.542(d), §485.625(d), §485.727(d), §485.920(d), §486.360(d), §491.12(d), §494.62(d). *[For RNCHIs at §403.748, ASCs at §416.54, Hospice at §418.113, PRTFs at §441.184, PACE at §460.84, Hospitals at §482.15, HHAs at §484.102, CORFs at §485.68, REHs at §485.542, CAHs at §486.625, “Organizations” under 485.727, CMHCs at §485.920, OPOs at §486.360, and RHC/FHQs at §491.12:] (d) Training and testing. The [facility] must develop and maintain an emergency preparedness training and testing program that is based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, policies and procedures at paragraph (b) of this section, and the communication plan at paragraph (c) of this section. The training and testing program must be reviewed and updated at least every 2 years. *[For LTC facilities at §483.73(d):] (d) Training and testing. The LTC facility must develop and maintain an emergency preparedness training and testing program that is based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, policies and procedures at paragraph (b) of this section, and the communication plan at paragraph (c) of this section. The training and testing program must be reviewed and updated at least annually. *[For ICF/IIDs at §483.475(d):] Training and testing. The ICF/IID must develop and maintain an emergency preparedness training and testing program that is based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, policies and procedures at paragraph (b) of this section, and the communication plan at paragraph (c) of this section. The training and testing program must be reviewed and updated at least every 2 years. The ICF/IID must meet the requirements for evacuation drills and training at §483.470(i). *[For ESRD Facilities at §494.62(d):] Training, testing, and orientation. The dialysis facility must develop and maintain an emergency preparedness training, testing and patient orientation program that is based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, policies and procedures at paragraph (b) of this section, and the communication plan at paragraph (c) of this section. The training, testing and orientation program must be evaluated and updated at every 2 years. This Standard is not met as evidenced by: Based on review of the Home Health Agency’s (HHA’s) emergency preparedness (EP) plan and interview, the HHA failed to ensure the EP contained a written training and testing program. This had the potential to affect the 11 patients currently receiving services from the HHA. Findings include: Review of the HHA’s EP plan revealed no evidence of a written training and testing program. During an interview on 04/01/25 at 10:30 AM, the Director of Clinical Services, the Chief Executive Officer and the Chief Clinical Officer confirmed the above findings.”

    Rule E0036. Standard-level.

  • Plan Of Care

    The inspectors’ words, 837 words

    “Plan of care CFR(s): 484.60(a)(1) Each patient must receive the home health services that are written in an individualized plan of care that identifies patient-specific measurable outcomes and goals, and which is established, periodically reviewed, and signed by a doctor of medicine, osteopathy, or podiatry acting within the scope of his or her state license, certification, or registration. If a physician or allowed practitioner refers a patient under a plan of care that cannot be completed until after an evaluation visit, the physician or allowed practitioner is consulted to approve additions or modifications to the original plan. This Standard is not met as evidenced by: Based on record review, interview, and policy review, the facility failed to ensure that patient Plans of Care (POCs) included patient specific measurable goals to assess if progress toward expected outcomes were being met for 3 of 3 sampled patients (Patient (P) 1, P2, P3) reviewed for care plan development. This deficient practice had the potential to affect all patients receiving services from the facility. Findings include: Review of the undated facility policy titled “Care Planning Process,” indicated “. . . A written individualized plan of care will be initiated . . . The patient-specific clinical plan of care includes . . . measurable outcomes and goals identified by the organization and the patient anticipated to occur as a result of implementing and coordinating the plan of care . . .” The policy also indicated that care plans should contain “. . . reasonable, measurable, and individualized goals and outcomes identified by the organization and the patient . . .” P1 Review of the Care Plans, indicated P1 had a Start of Care date of 02/19/25, with diagnoses which included congestive heart failure (CHF), and stage 4 chronic kidney disease. A Care Plan developed to meet P1’s gastrointestinal needs had a goal of Patients gastrointestinal system will remain within normal limits throughout cert period. A Care Plan developed to address P1’s medication management had a goal of Patient will demonstrate compliance with med regimen throughout the cert period. A Care Plan developed to address P1’s musculoskeletal needs had a goal of Patient will be free from falls throughout the cert period. A Care Plan developed to address P1’s integumentary needs had a goal of Patient will not have any new evidence of skin breakdown throughout cert period. P2 Review of the Care Plans, indicated P2 had a Start of Care date of 06/06/24 with diagnoses which included Parkinson’s disease, constipation, and benign prostatic hyperplasia without lower urinary tract symptoms. A Care Plan developed to meet P2’s neurological needs had goals of actively participate in decisions about care and daily activities and demonstrate safe, consistent, and nurturing physical environment. A Care Plan developed to address P2’s gastrointestinal needs had a goal of Patients gastrointestinal system will remain within normal limits throughout cert period. A Care Plan developed to address P2’s musculoskeletal needs had a goal of Patient will be free from falls throughout the cert period. A Care Plan developed to address P2’s medication management had a goal of Patient will demonstrate compliance with med regimen throughout the cert period. A Care Plan developed to address P2’s integumentary needs had a goal of Patient will not have any new evidence of skin breakdown by end of cert period. A Care Plan developed to address P2’s pain had a goal of Patient/caregiver will verbalize/demonstrate measures to manage pain: medication management/alternative pain relief measures, behavior modification, to avoid factors that increase pain/use of pain scale to identify and determine comfort goal by _____. P3 Review of the Care Plans indicated P3 had a Start of Care date of 03/17/25 with diagnoses which included Mesothelioma of pleura and pulmonary mycobacterial infection. A Care Plan developed to address P3’s musculoskeletal needs had a goal of Patient will be free from falls throughout cert period. A Care Plan developed to address P3’s medication management had a goal of Patient will demonstrate compliance with med regimen throughout the cert period. A Care Plan developed to address P3’s respiratory needs had a goal of clear lungs by___, free of respiratory infection by___, and Sp02 will be within physician established parameters by____. A Care Plan developed to address P3’s pain had a goal of Patient/caregiver will verbalize/demonstrate measures to manage pain: medication management/alternative pain relief measures, behavior modification, to avoid factors that increase pain/use of pain scale to identify and determine comfort goal by _____. During an interview with the Chief Clinical Officer (CCO), the Director of Clinical Services, and the Chief Executive Officer (CEO), on 04/02/25 at 11:00 AM, the CCO stated that care plans are a weakness for the Agency and verbalized understanding that care plan goals are not measurable and in some instances the Care Plans for P1, P2, and P3 included the same goals for the three patients, taking away from them being patient specific. The Director of Clinical Services and the CEO verbalized agreement regarding the Care Plans currently in place for P1, P2, and P3.”

    Rule G0572. Standard-level.

The one inspection in the last three years
Inspections on record
DateVisitWhat the record says
Apr 2, 2025Recertification inspection12 deficiencies cited

Is it certified?

  • Medicare-certified home health agency since Jul 15, 2013.
  • Ownership: proprietary (for profit).
  • No deficiency on record in the last three years.
Source:

CMS, Home Health Care Agencies. Released Oct 21, 2026. Updated quarterly.

CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.

Has anything been proven against it?

  • CMS doesn’t publish fines or other penalties for home health agencies, so none are shown.
  • 0 deficiencies cited in the last three years came from inspections that included a complaint investigation.
Source:

CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.

Who does the caring?

  • Offers nursing care, physical therapy, speech pathology and home health aide services.
  • Doesn’t offer occupational therapy and medical social services.
  • CMS doesn’t publish staffing levels for home health agencies.
Source:

CMS, Home Health Care Agencies. Released Oct 21, 2026. Updated quarterly.

Who owns it?

  • 9 owners or officers are people: Querubin Iguban (owns 5% or more directly, 50%); Querubin Iguban (corporate officer, 50%); Querubin Iguban (managing employee (on the payroll), 50%); Querubin Iguban (runs it (operational or managerial control), 50%); Celestine Q Hernandez (owns 5% or more directly, 50%); Celestine Q Hernandez (corporate officer, 50%); Celestine Q Hernandez (corporate director, 50%); Celestine Q Hernandez (managing employee (on the payroll), 50%); Celestine Q Hernandez (runs it (operational or managerial control), 50%).
  • No private-equity firm among the owners CMS lists.
  • No real-estate investment trust among the owners CMS lists.
Source:

CMS, Home Health Agency All Owners and Home Health Agency Enrollments. Released Sep 29, 2026. Updated quarterly.

How do patients fare?

  • CMS rates its quality of patient care 4 of 5.
  • CMS gives no : “Fewer than 70 patients completed the survey.”
  • CMS compares it with the national rate: discharged to the community, the same; potentially preventable hospital stays, the same; potentially preventable readmissions after discharge, the same.
Source:

CMS, Home Health Care Agencies and Home Health Patient Survey. Released Oct 21, 2026. Updated quarterly.

Ratings and measures, as published
MeasureRating
Quality of patient care ratingCMS star rating, 1 to 5 in half stars4 of 5
Patient survey ratingCMS star rating from its survey of the agency’s patients, 1 to 5Not rated
Discharged to the communityCMS’s risk-adjusted rate, compared with the national rate73.59% (same as the national rate)
Potentially preventable hospital staysCMS’s risk-adjusted rate, compared with the national rate9.46% (same as the national rate)
Potentially preventable readmissions after dischargeCMS’s risk-adjusted rate, compared with the national rate4.01% (same as the national rate)

How does it compare nearby?

  • There aren’t enough agencies serving patients in ZIP code 89301 with a quality of patient care rating to compare.
Source:

CMS, Home Health ZIP Codes and Home Health Care Agencies. Released Oct 21, 2026. Updated quarterly.

1 compared
PlaceQuality rating
Genesis Home Health Services, Inc. This home health agency4

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for home health agencies, so none are shown.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • QCOR says some of its home health reports are accurate or available only through May 19, 2021, because of a systems migration.
  • Many home health agencies are inspected by a private accrediting organisation instead of the state, and QCOR’s home health file doesn’t appear to include those inspections: no inspection on record here doesn’t mean none took place.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Oct 24, 2026.

From the agency

The public record above comes first. Anything the agency adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the agency will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the agency”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 28, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.