Premier Point Home Health, Inc.
A home health agency in Chicago, Illinois 60640
4701 N Sheridan Road, Chicago, Illinois 60640. (773) 506-0985.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 21, 2026.
- 3.5of 5 quality of patient care rating
- 2of 5 patient survey rating
- 7 deficiencies cited in the last three years
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on May 11, 2026: a complaint inspection.
7 deficiencies cited in the last three years.
CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.
When those deficiencies happened
7 deficiencies in 1 month of the last 36. Last cited Aug 2024. Most serious: Standard-level. The last 3 years, to Oct 24, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.
Aug 15, 2024: recertification inspection7 deficiencies
-
Develop Ep Plan, Review And Update Annually
The inspectors’ words, 322 words
“Develop EP Plan, Review and Update Annually CFR(s): 484.102(a) §403.748(a), §416.54(a), §418.113(a), §441.184(a), §460.84(a), §482.15(a), §483.73(a), §483.475(a), §484.102(a), §485.68(a), §485.542(a), §485.625(a), §485.727(a), §485.920(a), §486.360(a), §491.12(a), §494.62(a). The [facility] must comply with all applicable Federal, State and local emergency preparedness requirements. The [facility] must develop establish and maintain a comprehensive emergency preparedness program that meets the requirements of this section. The emergency preparedness program must include, but not be limited to, the following elements: (a) Emergency Plan. The [facility] must develop and maintain an emergency preparedness plan that must be [reviewed], and updated at least every 2 years. The plan must do all of the following: * [For hospitals at §482.15 and CAHs at §485.625(a):] Emergency Plan. The [hospital or CAH] must comply with all applicable Federal, State, and local emergency preparedness requirements. The [hospital or CAH] must develop and maintain a comprehensive emergency preparedness program that meets the requirements of this section, utilizing an all-hazards approach. * [For LTC Facilities at §483.73(a):] Emergency Plan. The LTC facility must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least annually. * [For ESRD Facilities at §494.62(a):] Emergency Plan. The ESRD facility must develop and maintain an emergency preparedness plan that must be [evaluated], and updated at least every 2 years. . This Standard is not met as evidenced by: Based on a review of the Agency’s Emergency Preparedness plan and staff interview, it was determined the Agency failed to review and update its Emergency Preparedness plan biennially. This has the potential to affect all Pts. who receive services from the Agency. Findings include: 1. The Emergency Preparedness plan was reviewed on 8/12/24. The undated Emergency Preparedness plan lacked a date, indicating when the plan was last reviewed and updated. 2. During an interview with the Agency Supervisor on 8/15/24 at 11:30 AM, the Agency Supervisor confirmed the Agency failed to review and update the Emergency Preparedness plan biennially.”
-
Development Of Ep Policies And Procedures
The inspectors’ words, 517 words
“Development of EP Policies and Procedures CFR(s): 484.102(b) §403.748(b), §416.54(b), §418.113(b), §441.184(b), §460.84(b), §482.15(b), §483.73(b), §483.475(b), §484.102(b), §485.68(b), §485.542(b), §485.625(b), §485.727(b), §485.920(b), §486.360(b), §491.12(b), §494.62(b). (b) Policies and procedures. [Facilities] must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least every 2 years. *[For LTC facilities at §483.73(b):] Policies and procedures. The LTC facility must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least annually. *Additional Requirements for PACE and ESRD Facilities: *[For PACE at §460.84(b):] Policies and procedures. The PACE organization must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must address management of medical and nonmedical emergencies, including, but not limited to: Fire; equipment, power, or water failure; care-related emergencies; and natural disasters likely to threaten the health or safety of the participants, staff, or the public. The policies and procedures must be reviewed and updated at least every 2 years. *[For ESRD Facilities at §494.62(b):] Policies and procedures. The dialysis facility must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least every 2 years. These emergencies include, but are not limited to, fire, equipment or power failures, care-related emergencies, water supply interruption, and natural disasters likely to occur in the facility’s geographic area. This Standard is not met as evidenced by: Based on a review of the Agency’s Emergency Preparedness Plan and staff interview, it was determined the Agency failed to review and update the Emergency Preparedness policies and procedures, as required. This has the potential to affect all Pts. who receive services from the Agency. Findings include: 1. The Emergency Preparedness plan was reviewed on 8/12/24. The plan contained the Emergency Preparedness policies and procedures which lacked a date, indicating when the policies and procedures were last reviewed and updated. 2. The Emergency Preparedness plan contained the “Hazard Vulnerability Analysis 2021” indicating, the Agency last reviewed and updated the all-hazards risk assessment form in 2021. The plan lacked documentation that the Agency’s all-hazards risk assessment was reviewed and updated every 2 years. 3. During an interview with the Agency Supervisor on 8/15/24 at 11:30 AM, the Agency Supervisor confirmed the Agency failed to review and update the Emergency Preparedness risk assessment, policies, and procedures biennially.”
-
Development Of Communication Plan
The inspectors’ words, 176 words
“Development of Communication Plan CFR(s): 484.102(c) §403.748(c), §416.54(c), §418.113(c), §441.184(c), §460.84(c), §482.15(c), §483.73(c), §483.475(c), §484.102(c), §485.68(c), §485.542(c), §485.625(c), §485.727(c), §485.920(c), §486.360(c), §491.12(c), §494.62(c). (c) The [facility] must develop and maintain an emergency preparedness communication plan that complies with Federal, State and local laws and must be reviewed and updated at least every 2 years [annually for LTC facilities]. This Standard is not met as evidenced by: Based on a review of the Agency’s Emergency Preparedness plan and staff interview, it was determined the Agency failed to review and update the communication plan biennially. This has the potential to affect all Pts. who receive services from the Agency. Findings include 1. The Emergency Preparedness plan was reviewed on 8/12/24. The plan included a communication plan which included documentation the Agency last reviewed and updated on “4/2/2018”. The Agency failed to review and revise the communication plan every 2 years. 2. During an interview with the Agency Supervisor on 8/15/24 at 11:30 AM, the Agency Supervisor confirmed the Agency failed to review and update the communication plan biennially.”
-
Ep Testing Requirements
The inspectors’ words, 2,058 words
“EP Testing Requirements CFR(s): 484.102(d)(2) §416.54(d)(2), §418.113(d)(2), §441.184(d)(2), §460.84(d)(2), §482.15(d)(2), §483.73(d)(2), §483.475(d)(2), §484.102(d)(2), §485.68(d)(2), §485.542(d)(2), §485.625(d)(2), §485.727(d)(2), §485.920(d)(2), §491.12(d)(2), §494.62(d)(2). *[For ASCs at §416.54, CORFs at §485.68, REHs at §485.542, OPO, “Organizations” under §485.727, CMHCs at §485.920, RHCs/FQHCs at §491.12, and ESRD Facilities at §494.62]: (2) Testing. The [facility] must conduct exercises to test the emergency plan annually. The [facility] must do all of the following: (i) Participate in a full-scale exercise that is community-based every 2 years; or (A) When a community-based exercise is not accessible, conduct a facility-based functional exercise every 2 years; or (B) If the [facility] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required community-based or individual, facility-based functional exercise following the onset of the actual event. (ii) Conduct an additional exercise at least every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or individual, facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the [facility’s] response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [facility’s] emergency plan, as needed. *[For Hospices at 418.113(d):] (2) Testing for hospices that provide care in the patient’s home. The hospice must conduct exercises to test the emergency plan at least annually. The hospice must do the following: (i) Participate in a full-scale exercise that is community based every 2 years; or (A) When a community based exercise is not accessible, conduct an individual facility based functional exercise every 2 years; or (B) If the hospice experiences a natural or man-made emergency that requires activation of the emergency plan, the hospital is exempt from engaging in its next required full scale community-based exercise or individual facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or a facility based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (3) Testing for hospices that provide inpatient care directly. The hospice must conduct exercises to test the emergency plan twice per year. The hospice must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual facility-based functional exercise; or (B) If the hospice experiences a natural or man-made emergency that requires activation of the emergency plan, the hospice is exempt from engaging in its next required full-scale community based or facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional annual exercise that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or a facility based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop led by a facilitator that includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the hospice’s response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the hospice’s emergency plan, as needed. *[For PRFTs at §441.184(d), Hospitals at §482.15(d), CAHs at §485.625(d):] (2) Testing. The [PRTF, Hospital, CAH] must conduct exercises to test the emergency plan twice per year. The [PRTF, Hospital, CAH] must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or (B) If the [PRTF, Hospital, CAH] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an [additional] annual exercise or and that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or individual, a facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the [facility’s] response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the [facility’s] emergency plan, as needed. *[For PACE at §460.84(d):] (2) Testing. The PACE organization must conduct exercises to test the emergency plan at least annually. The PACE organization must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or (B) If the PACE experiences an actual natural or man-made emergency that requires activation of the emergency plan, the PACE is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional exercise every 2 years opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or individual, a facility based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the PACE’s response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the PACE’s emergency plan, as needed. *[For LTC Facilities at §483.73(d):] (2) The [LTC facility] must conduct exercises to test the emergency plan at least twice per year, including unannounced staff drills using the emergency procedures. The [LTC facility, ICF/IID] must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise. (B) If the [LTC facility] facility experiences an actual natural or man-made emergency that requires activation of the emergency plan, the LTC facility is exempt from engaging its next required a full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional annual exercise that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or an individual, facility based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the [LTC facility] facility’s response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [LTC facility] facility’s emergency plan, as needed. *[For ICF/IIDs at §483.475(d)]: (2) Testing. The ICF/IID must conduct exercises to test the emergency plan at least twice per year. The ICF/IID must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or. (B) If the ICF/IID experiences an actual natural or man-made emergency that requires activation of the emergency plan, the ICF/IID is exempt from engaging in its next required full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional annual exercise that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the ICF/IID’s response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the ICF/IID’s emergency plan, as needed. *[For HHAs at §484.102] (d)(2) Testing. The HHA must conduct exercises to test the emergency plan at least annually. The HHA must do the following: (i) Participate in a full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise every 2 years; or. (B) If the HHA experiences an actual natural or man-made emergency that requires activation of the emergency plan, the HHA is exempt from engaging in its next required full-scale community-based or individual, facility based functional exercise following the onset of the emergency event. (ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the HHA’s response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the HHA’s emergency plan, as needed. *[For OPOs at §486.360] (d)(2) Testing. The OPO must conduct exercises to test the emergency plan. The OPO must do the following: (i) Conduct a paper-based, tabletop exercise or workshop at least annually. A tabletop exercise is led by a facilitator and includes a group discussion, using a narrated, clinically relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. If the OPO experiences an actual natural or man-made emergency that requires activation of the emergency plan, the OPO is exempt from engaging in its next required testing exercise following the onset of the emergency event. (ii) Analyze the OPO’s response to and maintain documentation of all tabletop exercises, and emergency events, and revise the [RNHCI’s and OPO’s] emergency plan, as needed. *[ RNCHIs at §403.748]: (d)(2) Testing. The RNHCI must conduct exercises to test the emergency plan. The RNHCI must do the following: (i) Conduct a paper-based, tabletop exercise at least annually. A tabletop exercise is a group discussion led by a facilitator, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (ii) Analyze the RNHCI’s response to and maintain documentation of all tabletop exercises, and emergency events, and revise the RNHCI’s emergency plan, as needed. This Standard is not met as evidenced by: Based on a review of the Agency’s Emergency Preparedness plan and staff interview, it was determined that the Agency failed to conduct the required testing of its Emergency Preparedness plan. This has the potential to affect all Pts. who receive services from the Agency. Findings include: 1. The Emergency Preparedness plan was reviewed on 8/12/24. The plan lacked documentation that the Agency conducted or participated in a full-scale exercise, facility-based exercise, or activated the Agency’s Emergency Preparedness plan since 2020. 2. During an interview with the Agency Supervisor on 8/15/24 at 11:30 AM, the Agency Supervisor confirmed the Agency failed to conduct the required testing of its Emergency Preparedness plan.”
-
Encoding And Transmitting Oasis
The inspectors’ words, 160 words
“Encoding and transmitting OASIS CFR(s): 484.45(a) Standard: An HHA must encode and electronically transmit each completed OASIS assessment to the CMS system, regarding each beneficiary with respect to which information is required to be transmitted (as determined by the Secretary), within 30 days of completing the assessment of the beneficiary. This Standard is not met as evidenced by: Based on review of the Error Summary report and staff interviews, it was determined that in 2356 of 5877 reports submitted for the last 12 months, the Agency failed to submit a timely report, resulting in a warning. Findings include: 1. The Error Summary report for 04/2023 to 03/2024, was reviewed on 8/14/24. The report included error # -3330 for 2356 of 5877 late submissions, which was 40.09% of the OASIS reports submitted late, more than 30 days after the M0090. 2. During an interview with the Agency Supervisor on 8/14/24 at 3:00 PM, the Agency Supervisor confirmed that the error occurred.”
-
Onsite Supervisory Visit Every 14 Days
The inspectors’ words, 372 words
“Onsite supervisory visit every 14 days CFR(s): 484.80(h)(1)(i) (1)(i) If home health aide services are provided to a patient who is receiving skilled nursing, physical or occupational therapy, or speech language pathology services— (A) A registered nurse or other appropriate skilled professional who is familiar with the patient, the patient’s plan of care, and the written patient care instructions described in paragraph (g) of this section, must complete a supervisory assessment of the aide services being provided no less frequently than every 14 days; and (B) The home health aide does not need to be present during the supervisory assessment described in paragraph (h)(1)(i)(A) of this section. This Element is not met as evidenced by: Based on clinical records review and staff interviews it was determined that in 2 of 5 patients (Pts. # 7 and # 8) with Aide services, the RN failed to make onsite supervisory visits. Findings include: 1. Pt. # 7 was admitted for home health services on 1/6/24 with the diagnosis of Essential (primary) Hypertension. The clinical record was reviewed on 8/13/24. The clinical record contained a POC for certification period 5/5/24 to 7/3/24 that included Aide visits 2 times a week for 9 weeks, and SN visits 1 time a week for 9 weeks. The clinical record contained weekly SN visits completed by the LPN, and Aide visits 2 times week as ordered for the entire certification period. The clinical record lacked onsite RN supervisory visits for the Aide services. 2. Pt. # 8 was admitted for home health services on 11/28/23 with the diagnosis of Type 2 diabetes with diabetic peripheral angiopathy without gangrene. The clinical record was reviewed on 8/13/24. The clinical record contained a POC for certification period 5/26/24 to 7/24/24 that included Aide visits 2 times a week for 9 weeks, and SN visits 1 time a week for 9 weeks. The clinical record contained weekly SN visits completed by the LPN, and Aide visits 2 times week as ordered for the entire certification period. The clinical record lacked onsite RN supervisory visits for the Aide services. 3. Findings of the RN not completing onsite Aide supervisory visits was confirmed during an interview with the Agency Supervisor on 8/14/23 at 2 pm.”
-
Discharge And Transfer Summaries
The inspectors’ words, 413 words
“Discharge and transfer summaries CFR(s): 484.110(a)(6)(i-iii) (i) A completed discharge summary that is sent to the primary care practitioner or other health care professional who will be responsible for providing care and services to the patient after discharge from the HHA (if any) within 5 business days of the patient’s discharge; or (ii) A completed transfer summary that is sent within 2 business days of a planned transfer, if the patient’s care will be immediately continued in a health care facility; or (iii) A completed transfer summary that is sent within 2 business days of becoming aware of an unplanned transfer, if the patient is still receiving care in a health care facility at the time when the HHA becomes aware of the transfer. This Element is not met as evidenced by: Based on review of clinical records and staff interview, it was determined that the Agency failed to ensure the Physician was sent a copy of the discharge summary. This was found in 4 of 5 (Pts. #13, 17, 15, and 16) closed/discharged clinical records reviewed. Findings include: 1. Pt. #13 was admitted to home health services on 5/6/24 with diagnosis of Unspecified Dementia. The clinical record was reviewed on 8/13/24. The discharge summary was dated 6/26/24. The clinical record lacked evidence that the discharge summary was sent to the Physician. 2. Pt. #17 was admitted for home health services on 11/9/23 with the diagnosis of Dysarthria. The clinical record was reviewed on 8/13/24. The clinical record contained the discharge summary dated 1/5/24. The record lacked documentation that a copy of the discharge summary was forwarded to the Physician. 3. Pt. #15 was admitted for home health services on 6/10/23 with the diagnosis of Hemiplegia Following Cerebral Infarction Affecting Right Doninant Side. The clinical record was reviewed on 8/14/24. The clincal record contained the discharge summary dated 7/5/23. The record lacked documentation that a copy of the discharge summary was forwarded to the Physician. 4. Pt. #16 was admitted for home health services on 11/1/23 with the diagnosis of Spinal Stenosis. The clinical record was reviewed on 8/13/24. The clinical record contained the discharge summary dated 12/13/23. The record lacked documentation that a copy of the discharge summary was forwarded to the Physician. 5. During interviews with the Agency Supervisor on 8/13/24 at 2:00 PM, 8/14/24 at 11:30 AM, 12:15 PM and 3:00 PM; the Agency Supervisor confirmed the Agency failed to send a copy of the discharge summary to the Physician.”
All 2 inspections in the last three years
| Date | Visit | What the record says |
|---|---|---|
| May 11, 2026 | Complaint inspection | No deficiencies cited |
| Aug 15, 2024 | Recertification inspection | 7 deficiencies cited |
Is it certified?
- Medicare-certified home health agency since Feb 4, 2009.
- Ownership: proprietary (for profit).
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
CMS, Home Health Care Agencies. Released Oct 21, 2026. Updated quarterly.
CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.
Has anything been proven against it?
- CMS doesn’t publish fines or other penalties for home health agencies, so none are shown.
- 0 deficiencies cited in the last three years came from inspections that included a complaint investigation.
CMS, QCOR home health inspection reports. Released Oct 20, 2026. Updated monthly.
Who does the caring?
- Offers nursing care, physical therapy, occupational therapy, speech pathology, medical social services and home health aide services.
- CMS doesn’t publish staffing levels for home health agencies.
CMS, Home Health Care Agencies. Released Oct 21, 2026. Updated quarterly.
Who owns it?
- 4 owners or officers are people: Lanre A Shomade (owns 5% or more directly, 100%); Lanre A Shomade (corporate officer, 100%); Lanre A Shomade (corporate director, 100%); Lanre A Shomade (managing employee (on the payroll), 100%).
- No private-equity firm among the owners CMS lists.
- No real-estate investment trust among the owners CMS lists.
CMS, Home Health Agency All Owners and Home Health Agency Enrollments. Released Sep 29, 2026. Updated quarterly.
How do patients fare?
- CMS rates its quality of patient care 3.5 of 5.
- Patients rate it 2 of 5 in CMS’s patient survey (263 surveys completed): 81% rated it 9 or 10 out of 10, and 70% would definitely recommend it.
- CMS compares it with the national rate: discharged to the community, the same; potentially preventable hospital stays, the same; potentially preventable readmissions after discharge, the same.
CMS, Home Health Care Agencies and Home Health Patient Survey. Released Oct 21, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Quality of patient care ratingCMS star rating, 1 to 5 in half stars | 3.5 of 5 |
| Patient survey ratingCMS star rating from its survey of the agency’s patients, 1 to 5 | 2 of 5 |
| Discharged to the communityCMS’s risk-adjusted rate, compared with the national rate | 82.94% (same as the national rate) |
| Potentially preventable hospital staysCMS’s risk-adjusted rate, compared with the national rate | 11.68% (same as the national rate) |
| Potentially preventable readmissions after dischargeCMS’s risk-adjusted rate, compared with the national rate | 4.39% (same as the national rate) |
How does it compare nearby?
- Of the 208 agencies CMS’s data show serving patients in ZIP code 60640, where this agency’s office is, 195 have a quality of patient care rating; the middle one is 3 of 5, and this one is rated 3.5 of 5.
CMS, Home Health ZIP Codes and Home Health Care Agencies. Released Oct 21, 2026. Updated quarterly.
| Place | Quality rating |
|---|---|
| Wailai Home Health Services | Not given |
| Premier Point Home Health, Inc. This home health agency | 3.5 |
| Caring Professionals Home Care | 4 |
| Healing Hands Home Care, Inc. | 4.5 |
| We Care Home Health, Inc. | 1.5 |
| Prestige Home Health Services, Inc. | 4.5 |
| Advance Home Health Care, Ltd | 3.5 |
| All Family Health Care, Inc. | 5 |
| Good Heart Home Health Care, Inc. | 1.5 |
| Chicago Home Healthcare, S C | 2.5 |
| All About Healthcare, Inc. | 4 |
| Benchmark Home Health Care | 2 |
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for home health agencies, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says some of its home health reports are accurate or available only through May 19, 2021, because of a systems migration.
- Many home health agencies are inspected by a private accrediting organisation instead of the state, and QCOR’s home health file doesn’t appear to include those inspections: no inspection on record here doesn’t mean none took place.
Sources
-
Centers for Medicare & Medicaid Services, Home Health Care Agencies (6jpm-sxkc).
Released Oct 21, 2026 and checked Oct 24, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Home Health Patient Survey (ccn4-8vby).
Released Oct 21, 2026 and checked Oct 24, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR home health inspection reports (HHA_2567s_2018_to_2026YTD.xlsx).
Released Oct 20, 2026 and checked Oct 24, 2026. Updated monthly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Home Health Agency All Owners (fc009b2d-7846-44b1-b4a1-692f0c143879).
Released Sep 29, 2026 and checked Oct 24, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Home Health Agency Enrollments (15f64ab4-3172-4a27-b589-ebd67a6d28aa).
Released Sep 29, 2026 and checked Oct 24, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Home Health ZIP Codes (m5eg-upu5).
Released Oct 21, 2026 and checked Oct 24, 2026. Updated quarterly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 24, 2026.
From the agency
The public record above comes first. Anything the agency adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the agency will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the agency”, and paying will never change a finding, a rating or the order of results.