Hearth Record

Davita Wausau Dialysis

A dialysis facility in Wausau, Wisconsin 54401

2600 Stewart Ave, Suite 144, Wausau, Wisconsin 54401. (715) 841-1708.

CMS’s own record, on Care Compare

Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.

The short answer

Record last released by CMS on Oct 28, 2026.

The last 24 months 2 deficiencies in 1 month of the last 36. Last cited Jul 2024. Most serious: Condition-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean4
Star ratings
CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
Condition-level deficiency
For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual.

What did inspectors find?

The last inspection on record was on Jul 29, 2024: a complaint inspection.

2 deficiencies cited in the last three years, 1 of them at condition level, the most serious.

1 deficiency at condition level, the more serious of CMS’s two levels

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

When those deficiencies happened

2 deficiencies in 1 month of the last 36. Last cited Jul 2024. Most serious: Condition-level. The last 3 years, to Oct 30, 2026.

2 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 NovDec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOct

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

Jul 29, 2024: complaint inspection2 deficiencies
  • Cfc - Physical Environment

    The inspectors’ words, 101 words

    “CFC-PHYSICAL ENVIRONMENT CFR(s): 494.60 This Condition is not met as evidenced by: 49038 Based on observation, record review, and interview, facility staff failed to prevent leakage from the facility from entering adjacent non-clinical occupied space for 2 of 2 offices observed (Office A, Office B). Findings include: Facility staff failed to implement and maintain a proactive maintenance plan for identifying and repairing sources of leakage in 2 of 3 headwalls. See tag V402. Failure to take proactive maintenance measures has the potential to compromise the structural integrity of the building and affect the health and safety of patients, visitors, and staff.”

    Rule V0400. Condition-level. From a complaint.

  • Pe - Building - Constructed/Maintained To Ensure Safety

    The inspectors’ words, 974 words

    “PE-BUILDING-CONSTRUCT/MAINTAIN FOR SAFETY CFR(s): 494.60(a) The building in which dialysis services are furnished must be constructed and maintained to ensure the safety of the patients, the staff and the public. This Standard is not met as evidenced by: 49038 Based on observation, record review, and interview, facility staff failed to implement and maintain a proactive maintenance plan for identifying and repairing sources of leakage from dialysate wall boxes, piping, and associated components for 2 of 3 headwalls observed with evidence of leakage (Headwall 1, Headwall 2). Findings include: On 7/29/2024 at 10:18 AM, observation of the occupied building space directly below the dialysis facility revealed the following in Office A: a build-up of corrosion as well as a white crystallized substance on the metal piping and steel joists above the ceiling tile adjacent to the light fixture. The top side (side above the ceiling) of the light fixture contained red/brown particles that appeared to be rust particles. A wet, brown substance approximately ½-inch diameter was also observed on the light fixture. On the top side of the ceiling tiles in the cavity between the ceiling and floor, a green towel and a plastic container were also observed. On 7/29/2024 at 10:25 AM, observations of Office B revealed a white, crystallized substance on the window frame and windowsill. Observation above the ceiling directly adjacent to the window in the exterior wall revealed corrosion on the underside of the metal floor deck, piping, and on the metal joists. A white crystallized substance was observed on the underside of the metal joists, piping, and on some of the batt-insulation between the wall studs. There was also a metal pan approximately 8.5-inch by 11-inches placed on top of the ceiling tile in the cavity that was covered with a rust-colored corrosion. The top side of the ceiling tile adjacent to this pan contained a dark colored stain approximately 14-inches by 6-inches. During an interview on 07/29/2024 at 9:32 AM, Building Occupant A stated their office is located directly below the dialysis facility. Occupant A stated there has been sporadic leaking into their office space since they moved into the building in 12/2016, with the most recent leak occurring on 7/15/2024. During an interview on 07/29/2024 at 9:46 AM, Building Occupant D stated, “We had a leak two weeks ago in [Office A] ... It was dripping from the corner of the light fixture. It dripped on the floor and on the chair.” Occupant D stated there was a leak in their meeting room in December 2023 and “it had such [a chemical] odor that we closed the office. “ Per D, “Those leaks have been occurring since we moved in.” During a phone interview on 07/29/2024 at 10:38 AM, Building Manager E stated, “Davita operates with a certain type of water that helps their system work. They have stations set up with tubing that at times forms leaks. Each time we are informed, we contact Davita and help with the remediation. Davita will repair the leaks. They have a specific tech in their operation that handles that.” Per Manager E, the leaks entering the space below the facility are not from any building plumbing or pipes located in the cavity between the lower level and main level. Manager E stated he believes the leaks are coming from Davita’s equipment in their space and leaks through the floor/ceiling assembly. Per E, when a leak is reported, Davita is notified of the approximate location of the leak and Davita then repairs the leak. When asked if there were numerous leaks, Manager E stated, “it’s been on and off with the leaks and there’s no consistency.” On 07/29/2024 at 11:05 AM, observation of the facility’s dialysis treatment area revealed a headwall that ran continuous along the exterior wall of the building, directly above Office B. There was a total of (3) head walls in the treatment area. The 2nd head wall (headwall located in the middle of the treatment area) appeared to be consistent with the location of the reported leak in Office A. Observation of the interior piping behind the enclosure cabinet of the 2nd headwall revealed white crystallized material in multiple locations on plastic piping and at valve connections; a build-up of material light brown in color in multiple locations where the plastic piping terminated at a threaded connection to a larger off-white colored container. This light brown material was also observed on top of black foam insulation on one of the pipes and underneath the plastic piping within the headwall enclosure. Review of the facility floor plan revealed the facility’s head wall locations were consistent with evidence of leaking observed in the floor space below the facility in Office A and Office B. During a telephone interview on 07/29/2024 at 3:19 PM, Biomed Technician C stated, “It’s common for dialysis equipment to have leaks. Most places don’t have a tenant below.” Technician C stated that typically the cabinets that house the dialysis equipment have a gap between the floor and the cabinet so if a leak occurs, it can be noticed quickly, but the cabinets at the facility are continuous to the floor and no one is aware until it has permeated through the floor. Technician C stated, “it seeps through the concrete floor from the piping in the headwall. Sometimes a line cracks or a valve breaks, and it leaks to the basement.” Per Technician C, the solution in the piping is a potassium, calcium, and sodium mixture. When asked if the sporadic leaking has occurred for the past six years, C stated, “yes, that’s accurate.” There was no evidence that facility staff had a plan in place to identify leaks, parts in need of repair or other preventive measures to mitigate equipment leaks prior to the point of affecting adjacent occupied spaces outside of the facility.”

    Rule V0402. Standard-level. From a complaint.

The one inspection in the last three years
Inspections on record
DateVisitWhat the record says
Jul 29, 2024Complaint inspection2 deficiencies cited

Is it certified?

  • Medicare-certified dialysis facility, certified or last recertified on Apr 1, 1998.
  • Run for profit.
  • Cited at in the last three years: it didn’t meet a whole condition of Medicare’s rules for dialysis facilities.
  • Chain: DaVita.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

Has it been penalized?

  • CMS doesn’t publish fines or other penalties for dialysis facilities.
  • 2 deficiencies cited in the last three years came from inspections that included a complaint investigation.
Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

What does it offer?

  • Offers in-center hemodialysis, peritoneal dialysis and a shift starting at 5 p.m. or later.
  • Doesn’t offer home hemodialysis training.
  • 26 dialysis stations.
  • CMS doesn’t publish staffing levels for dialysis facilities.
  • In CMS’s survey, patients rate its staff 3 of 5.
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Who owns it?

  • Part of the DaVita chain, as CMS lists it.
  • CMS publishes no owners file for dialysis facilities, so no other owner is named.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

How do patients fare?

  • CMS rates it 3 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
  • Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; blood transfusions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, as expected; patients dialysing through a fistula, as expected; patients put on a kidney transplant waitlist in their first year of dialysis, as expected; patients on a kidney transplant waitlist, as expected.
  • Patients rate it 4 of 5 in CMS’s survey of in-center hemodialysis patients (30 interviews, Oct 18, 2024 to Jul 11, 2025): 79% rated the facility 9 or 10 out of 10.
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Ratings and measures, as published
MeasureRating
Star ratingCMS’s star rating for dialysis facilities, 1 to 53 of 5
Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 54 of 5

How does it compare nearby?

  • Of the 3 dialysis facilities CMS lists in Marathon County, 3 have a star rating from CMS: 2 rated 3 of 5, 1 rated 2 of 5.
  • CMS rates this one 3 of 5.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
  • CMS doesn’t publish staffing levels for dialysis facilities.
  • CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Oct 30, 2026.

From the facility

The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 28, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.