Hearth Record

Davita South Shore Dialysis Center

A dialysis facility in League City, Texas 77573

212 Gulf Fwy S, Suite G3, League City, Texas 77573. (281) 554-6050.

CMS’s own record, on Care Compare

Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.

The short answer

Record last released by CMS on Oct 28, 2026.

The last 24 months 7 deficiencies in 1 month of the last 36. Last cited Mar 2024. Most serious: Standard-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean3
Star ratings
CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.

What did inspectors find?

The last inspection on record was on Mar 1, 2024: a complaint and standard inspection.

7 deficiencies cited in the last three years.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

When those deficiencies happened

7 deficiencies in 1 month of the last 36. Last cited Mar 2024. Most serious: Standard-level. The last 3 years, to Oct 30, 2026.

7 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 NovDec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOct

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

Mar 1, 2024: complaint and standard inspection7 deficiencies
  • Environment: Secure And Restricted

    The inspectors’ words, 309 words

    “ENVIRONMENT-SECURE & RESTRICTED CFR(s): 494.40(a) 8 Environment: secure & restricted The water purification and storage system should be located in a secure area that is readily accessible to authorized users. The location should be chosen with a view to minimizing the length and complexity of the distribution system. Access to the purification system should be restricted to those individuals responsible for monitoring and maintenance of the system. This Standard is not met as evidenced by: 22676 Based on observation, interview, and policy review, the facility failed to restrict access to the water purification and storage system to only individuals responsible for monitoring and maintenance of the system on one of three survey days. Failure to restrict access to the water purification and storage system to only individuals responsible for monitoring and maintenance of the system had the potential to negatively impact the safety and well-being of the 55 in-center dialysis patients receiving treatments at this facility. Findings include: During tour of the facility on 02/28/24 at 1:30 PM, the door leading to the water purification system and the bicarb and acid storage area was observed wide open with no one in the water treatment area. During an interview with the Administrator on 02/28/24 at 1:30 PM, he/she confirmed the door was open and no one was in the water room. During an interview on 02/28/24 at 2:00 PM, Biomed 6 confirmed access to the water purification and storage system was not restricted to only authorized users who were responsible for the monitoring and maintaining the system. Biomed 6 stated that he must have left the door open when he/she left. Review of the facility’s policy titled, “Water Treatment System Minimum Component Requirement,” dated October 2021, indicated, “Access to the water treatment system should be restricted to those personnel/trained teammates responsible for monitoring, maintenance of the system and supply ordering.””

    Rule V0184. Standard-level. From a complaint.

  • Softeners - Testing Hardness/Log

    The inspectors’ words, 280 words

    “SOFTENERS: TESTING HARDNESS/LOG CFR(s): 494.40(a) 6.2.4 Softeners: Testing hardness/log Users should ensure that test accuracy and sensitivity are sufficient to satisfy the total hardness monitoring requirements of the reverse osmosis machine manufacturer. Total hardness of the water exiting the water softener should be measured at the end of each treatment day. Water hardness test results should be recorded in a water softener log. This Standard is not met as evidenced by: 22676 Based on observation, interview, and the facility’s policy, the facility failed to ensure the staff monitored the end of day hardness of water quality by failing to ensure one of one water hardness strips were not expired. This deficient practice had the potential to affect the water quality of the all 55 in-center hemodialysis patients receiving treatment and staff at this facility. Findings include: Observation in the water treatment area on 02/28/24 at 1:30 PM, revealed one bottle of RPR, [sic]lot #108041, water hardness test strips expired on 05/31/23. The bottle was dated by unknown staff, as being opened on 12/29/23. The date of opening was recorded but not initialed with the staff initials. During an interview on 02/28/24 at 1:30 PM, the Administrator confirmed the manufactures expiration date was 05/31/23 and the bottle was opened for use on 12/29/23. The Administrator confirmed there was not another opened bottle and this bottle had only three test strips left which indicated it had been used since the date of opening on 12/29/23 and expired 02/29/23. A review of the facility’s policy titled, “Hardness Test Using RPC Water Hardness Test Strips” dated 10/21, revealed, “Do not use test strips after the manufacturing expiration date which is printed on the bottle.””

    Rule V0191. Standard-level. From a complaint.

  • Pe - Equipment Maintenance - Manufacturer’S Dfu

    The inspectors’ words, 249 words

    “PE-EQUIPMENT MAINTENANCE-MANUFACTURER’S DFU CFR(s): 494.60(b) The dialysis facility must implement and maintain a program to ensure that all equipment (including emergency equipment, dialysis machines and equipment, and the water treatment system) are maintained and operated in accordance with the manufacturer’s recommendations. This Standard is not met as evidenced by: 22676 Based on review of glucometer logs, interview, facility policy review, and review of manufacturer’s instructions, the facility failed to ensure the glucometers were in the control range and follow manufacturer’s instructions for one of one glucometer used in the facility. This had the potential to provide inaccurate glucose results that could result in mistreated blood glucose levels to all 69 patients receiving care at the facility. Findings include: Review of “Blood Glucose Logs” provided by the Administrator, for glucometer E19LA01248, from 01/01/24 through 02/27/24, revealed the acceptable low blood glucose control range should be 92-124. On 01/30/24, the recorded low control was 127. During an interview on 02/28/24 at 2:00 PM, with Clinical Coordinator 3, he/she confirmed the staff did not repeat calibration of the abnormal low testing level. Review of the facility’s policy titled, “Embrace PRO Blood Glucose Monitoring System Quality Control” dated September 2020, revealed, “. . . 16. If control results fall outside the acceptable range the test must be repeated.” Review of the “Embrace Pro” blood glucose monitoring system manufactures instruction revision date 09/2020 revealed, “ ...p. eleven, if the “test fall outside the range printed on the test strip vial, repeat the test ...””

    Rule V0403. Standard-level. From a complaint.

  • Appropriateness Of Dialysis Rx

    The inspectors’ words, 464 words

    “PA-APPROPRIATENESS OF DIALYSIS RX CFR(s): 494.80(a)(2) The patient’s comprehensive assessment must include, but is not limited to, the following: (2) Evaluation of the appropriateness of the dialysis prescription, This Standard is not met as evidenced by: 22676 Based on record reviews, interview, and policy review, the facility failed to follow the individualized dialysis (an artificial means of kidney function that removes the waste and excess fluid from the blood by passing through a filter) prescription as determined by the medical provider for four of six sampled in-center patients (Patient (P) 7, P9, P10 and P12). Failure to follow the medical providers’ dialysis prescription had the potential to negatively impact the effectiveness of the prescribed dialysis treatments for the all 55 patients receiving in-center dialysis treatments at this facility. Findings include: 1. Review of P7’s electronic medical record (EMR) revealed a prescribed blood flow rate (BFR) 350 milliliters per min (ml/min) and the dialysis flow rate (DFR) was 500 ml/min. Review of one of six “Post Treatment” flowsheets from 02/12/24 through 02/28/24, in the EMR indicated the following: a. On 02/24/24, the BFR was documented at 300 ml/min and the DFR was documented at 800 ml/min from 7:32 AM until 11:23 AM. There was no documented rationale for the change to the prescribed BFR. 2. Review of P9’s EMR revealed a prescribed DFR was 500 ml/min. Review of one of five “Post Treatment” flowsheets from 02/15/24 through 02/24/24, in the EMR indicated the following: a. On 02/24/24, the DFR was documented at 800 ml/min from 10:44 AM until 2:16 PM. There was no documented rationale for the change to the prescribed BFR. 3. Review of P10’s EMR revealed a prescribed DFR was 500 ml/min. Review of one of six “Post Treatment” flowsheets from 02/13/24 through 02/25/24, in the EMR indicated the following: a. On 02/25/24 DFR was documented at 800 ml/min from 7:17 PM until 1:20 AM. There was no documented rationale for the change to the prescribed BFR. 4. Review of P12’s EMR revealed a prescribed BFR 400 ml/min and the DFR was 800 ml/min. Review of one of six “Post Treatment” flowsheets from 02/16/24 through 02/28/24, in the EMR indicated the following: a. On 02/28/24, the BFR was documented at 350 ml/min from 11:02 AM until 2:16 PM and the DFR was documented at 700 ml/min from 12:02AM until 2:16 PM. There was no documented rationale for the change to the prescribed BFR. During an interview on 02/29/24 at 1:30 PM, Clinical Coordinator 3 confirmed the above findings and confirmed that staff did not follow the physician order for dialysis treatment. Review of the facility’s policy titled, “Pre-Intra-Post Treatment Data Collection, Monitoring, and Assessment,” dated 10/23, revealed, “The Nursing assessment will be performed and documented ...Verification of the prescription including machine parameters ...””

    Rule V0503. Standard-level. From a complaint.

  • Poc Completed/Signed By Idt & Patient

    The inspectors’ words, 471 words

    “POC-COMPLETED/SIGNED BY IDT & PT CFR(s): 494.90(b)(1) The patient’s plan of care must- (i) Be completed by the interdisciplinary team, including the patient if the patient desires; and (ii) Be signed by the team members, including the patient or the patient’s designee; or, if the patient chooses not to sign the plan of care, this choice must be documented on the plan of care, along with the reason the signature was not provided. This Standard is not met as evidenced by: 22676 Based on record review, interviews, and review of the facility’s policy, the facility failed to ensure four of six patients (Patient (P) 8, P9, P10, and P11) reviewed, participated in the plan of care (POC), or received the information within a timely manner. Failure to ensure the patients reviewed the POC and understand the goals set had the potential to negatively impact the effectiveness of the dialysis treatments for the 69 patients receiving dialysis treatments at this facility. Findings include: 1. Review of P8’s 30-day POC in the electronic medical Record (EMR) under the “Plan of Care” section, dated 06/06/23 revealed the patient was not provided with the information in the POC until 07/11/23. 2. Review of P9’s 30-day POC, EMR under the “Plan of Care” section, dated 12/19/23, revealed the facility failed to ensure the patients signature was dated to indicate if the information in the POC was provided within a timely manner. Review of the 90-day POC for P8 dated 02/08/24 the form the patient sign was also left blank. There was no evidence that the POC information for the initial 30-day POC or the 90-day POC was provided to P9 in a timely manner. 3. Review of P10’s 90-day POC, in the EMR under the “Plan of Care” section, dated 01/26/24, revealed the facility failed to document evidence P10 POC information was provided to the patient. The date for the patient to sign was left blank and there was no notation in the medical record that indicated the information was provided to the patient. 4. Review of P11’s POC in the EMR under the “Plan of Care” section the unstable POC dated 10/31/23 revealed the patient was not provided with the information until 11//20/23. During an interview on 02/29/24 at 1:30 PM, Clinical Coordinator 3 confirmed the facility failed to show the POC information was provided to the patients in a timely manner for P8, P9, P10 and P11. Review of the facility’s form tilted “Patient Plan of Care” “ stated “ ...the form required a patient signature and date when the plan was reviewed, and the patient understood the plan...” Review of the facility’s policy titled, “Interdisciplinary Team (IDT) patient assessment and Plan of Care” dated 07/23, indicated, “. . . “The patient’s plan of care will be signed by all members of the IDT.””

    Rule V0556. Standard-level. From a complaint.

  • Initial Poc Implemented - 30 Days/13 Tx

    The inspectors’ words, 310 words

    “POC-INITIAL IMPLEMENTED-30 DAYS/13 TX CFR(s): 494.90(b)(2) Implementation of the initial plan of care must begin within the latter of 30 calendar days after admission to the dialysis facility or 13 outpatient hemodialysis sessions beginning with the first outpatient dialysis session. This Standard is not met as evidenced by: 22676 Based on record review, interviews, and review of the facility’s policy, the facility failed to ensure one of six patients (Patient (P) 9) 30-day plan of care (POC) was not completed within 13 treatments or 30 days as required by federal regulations. Failure to ensure the POC was completed within the first 13 treatments or within 30 days of admission had the potential to negatively impact the effectiveness of the dialysis treatments for all 69 patients receiving dialysis at this facility. Findings include: Review of P9’s electronic medical record (EMR) revealed the patient was admitted on 09/20/23. Review of the EMR under the “Plan of Care” section indicated that the facility failed to conduct a POC meeting within 13 treatments or 30 days as required. According to the EMR, the POC the 30-day meeting was not held until 12/19/23. In addition, there was no documented evidence that the information was provided to the patient as of 02/29/24. During an interview on 02/29/23 at 130 PM, Clinical Coordinator 3 confirmed the patient was admitted on 09/20/23 and the POC meeting was not held until 12/19/23. Clinical Coordinator 3 confirmed the staff did not follow the Federal Regulations and facility policy. Review of the facility’s policy titled “Interdisciplinary Team (IDT) Patient Assessment and Plan of Care” dated 7/23 states ...”An initial Plan of Care, based on the findings from the comprehensive assessment, will be completed on all patients new to dialysis within 30 calendar days or 13 outpatient dialysis sessions for hemodialysis beginning with the first outpatient dialysis treatment or per state guidelines.””

    Rule V0557. Standard-level. From a complaint.

  • Implement Updates Of Poc - 15 Days P Pt Assessment

    The inspectors’ words, 349 words

    “POC-IMPLEMENT UPDATE-15 DAYS P PT ASSESS CFR(s): 494.90(b)(2) Implementation of monthly or annual updates of the plan of care must be performed within 15 days of the completion of the additional patient assessments specified in §494.80(d). This Standard is not met as evidenced by: 22676 Based on medical record reviews, interviews, and review of the facility’s policy and the Comprehensive Interdisciplinary Assessment and Plan of Care form, the facility failed to ensure two of six patients (Patient (P)7 and P9) plan of care (POC), was completed within 15 days of the reassessment as required by federal regulations. Failure to ensure the POC was developed using current assessment information had the potential to negatively impact the effectiveness of the dialysis treatments for all 69 patients receiving dialysis at this facility. Findings include: 1. Review of P7’s POC in the electronic medical record (EMR) under the “Plan of Care” section, indicated that the POC meeting was held on 09/20/23 the Registered Dietician (RD) completed the assessment on 08/09/23, the Social Worker (SW) on 08/15/23 and the Registered Nurse (RN) on 08/26/23. All assessments were conducted more than 15 days before the POC meeting and there was no evidence of an update. 2. Review of P9’s initial 30-day POC in the EMR under the “Plan of Care” section indicated that the POC meeting was held on 12/19/23. The RN conducted the assessment on 11/16/23, the SW on 10/13/23 and the RD on 10/09/23. All assessments were conducted more than 15 days before the POC meeting and there was no evidence of an update. During an interview on 02/29/24 at 1:30 PM, Clinical Coordinator 3, confirmed the above findings. Review of the facility’s form titled, “Comprehensive Interdisciplinary Assessment and Plan of Care” dated 07/03/23 indicated, “Implementation of monthly or annual updates of the plan of care must be performed within 15 days of the completion of the additional assessments.” Review of the facility’s policy titled, “Interdisciplinary Team (IDT) patient assessment and Plan of Care” dated 7/23, indicated,” ... the plan of care must be performed within 15 days of the completion of assessments.””

    Rule V0558. Standard-level. From a complaint.

The one inspection in the last three years
Inspections on record
DateVisitWhat the record says
Mar 1, 2024Complaint and standard inspection7 deficiencies cited

Is it certified?

  • Medicare-certified dialysis facility, certified or last recertified on Oct 5, 2005.
  • Run for profit.
  • No deficiency on record in the last three years.
  • Chain: DaVita.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

Has it been penalized?

  • CMS doesn’t publish fines or other penalties for dialysis facilities.
  • 7 deficiencies cited in the last three years came from inspections that included a complaint investigation.
Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

What does it offer?

  • Offers in-center hemodialysis, peritoneal dialysis, home hemodialysis training and a shift starting at 5 p.m. or later.
  • 12 dialysis stations.
  • CMS doesn’t publish staffing levels for dialysis facilities.
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Who owns it?

  • Part of the DaVita chain, as CMS lists it.
  • CMS publishes no owners file for dialysis facilities, so no other owner is named.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

How do patients fare?

  • CMS rates it 3 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
  • Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; blood transfusions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, better than expected; patients dialysing through a fistula, as expected; patients put on a kidney transplant waitlist in their first year of dialysis, as expected; patients on a kidney transplant waitlist, as expected.
  • CMS gives no : “Too few completed survey responses to report.”
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Ratings and measures, as published
MeasureRating
Star ratingCMS’s star rating for dialysis facilities, 1 to 53 of 5
Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5Not rated

How does it compare nearby?

  • Of the 11 dialysis facilities CMS lists in Galveston County, 11 have a star rating from CMS: 1 rated 5 of 5, 1 rated 4 of 5, 6 rated 3 of 5, 3 rated 2 of 5.
  • CMS rates this one 3 of 5.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
  • CMS doesn’t publish staffing levels for dialysis facilities.
  • CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Oct 30, 2026.

From the facility

The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 8, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.