Avera Gregory Healthcare Ctr Dialysis
A dialysis facility in Gregory, South Dakota 57533
110 S Logan Ave, Gregory, South Dakota 57533. (605) 835-8394.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 28, 2026.
- 4of 5 CMS’s star rating
- Not rated patient survey rating
- 2 deficiencies cited in the last three years (needs attention)
- 5 dialysis stations
Each figure’s source sits beside it, in its section below.
What these words mean4
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
- Condition-level deficiency
- For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual.
What did inspectors find?
The last inspection on record was on Jul 31, 2025: a standard inspection.
2 deficiencies cited in the last three years, 1 of them at condition level, the most serious.
1 deficiency at condition level, the more serious of CMS’s two levels
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
When those deficiencies happened
2 deficiencies in 1 month of the last 36. Last cited Jul 2025. Most serious: Condition-level. The last 3 years, to Oct 30, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Jul 31, 2025: standard inspection2 deficiencies
-
Cfc - Physical Environment
The inspectors’ words, 1,058 words
“CFC-PHYSICAL ENVIRONMENT CFR(s): 494.60 This Condition is not met as evidenced by: 50715 Based on observation, interview, and policy review, the provider failed to ensure: *Two of four observed patients (5 and 6) receiving dialysis in bays 1 and 5 allowed staff full view of the patients’ faces, vascular access sites, and bloodline connections for continuous assessment of their vascular access sits during dialysis treatments. *Patients (3, 4, 5, and 6) who were scheduled for dialysis on 7/30/25 in bays 1 and 5 had an observable view of their faces, vascular access sites, and bloodlines connections by staff at all times during dialysis treatments. Those conditions put all patients at risk for exsanguination (a severe loss of blood) and/or death. This deficient practice represented immediate jeopardy (IJ). IJ is a situation or event that may cause, or is likely to cause, serious injury, harm, impairment, or death to a patient. All patients were at risk. Findings include: 1. Observation during the environmental tour on 7/30/25 at 10:15 a.m. revealed: *The dialysis center had a main treatment area with four dialysis bays and one isolation room for a total of 5 bays each with dialysis machines. *Patient 5 was receiving dialysis in bay 1. *Patient 2 was receiving dialysis in bay 3. *Patient 6 was receiving dialysis in bay 5 (isolation room). *While receiving dialysis in bay 1, patient 5’s face, : -Vascular access site, and bloodline connections were not visible from the nurse’s station due to the obstruction of an opaque(cannot see through) glass. -A clear view of the patient was only obtained by standing directly in front of the bay or at the end of the nurses’ station closest to bay 1. *While receiving dialysis in bay 5, patient 6’s face, : -Vascular access site, and bloodline connections were not visible from the nurse’s station due to the obstruction of solid walls. -A window had been placed in the wall of the room between bay 5 and bay 4. -The window had a glare and was obstructed by a television in bay 4 that was positioned too high to visualize the patient’s face, vascular access site, and bloodline connections. -A clear view of the patient was only obtained by standing directly in front of the room or at the end of the nurses’ station closest to bay 5. *Registered nurses (RN) A and D and patient care technologist (PCT) C were on duty at the time of the observation. RN D was sitting at the nurses’ station and PCT C had been setting up the dialysis machine in bay 4, and the dialysis supervisor had been in and out of her office. *From where the staff were located, patient 5’s and patient 6’s vascular access sites and bloodline connections were not visible. Interview with RN D on 7/30/25 at 11:15 a.m. regarding visualization of patients’ vascular access sites revealed she: *Stated staff should have rounded on patients receiving dialysis every 15 minutes. *Stated staff have certain spots where they would sit while patients were receiving their dialysis treatment to allow for constant visualization. *Agreed, from where she was sitting, there were blind spots in bays 1 and 5. *Agreed the patient receiving dialysis in bay 5 was not visible unless someone had been sitting in front of the door. *Agreed the window placed between bay 5 and bay 4 had not allowed full visualization of patient 6 while receiving dialysis. *Agreed the television in bay 4 was obstructing the window view into bay 5. *Stated, “I was honestly surprised the room was constructed that way because of the blind spots.” Interview with dialysis supervisor A on 7/30/25 at 11:20 a.m. regarding visualization of patient’s 5 and 6 vascular access sites revealed she: *Stated for a patient receiving dialysis in bay 1, staff must sit in the chair at the end of the nurse’s station to visualize the patient. *Stated, “When I’m out on the floor, I always sit in that chair or else you can’t see.” *Agreed patient 5’s and patient 6’s faces, vascular access sites, or bloodline connections could not be visualized, while in bays 1 and 5, from the nurses’ station. *Stated that after the window was placed in bay 5 due to concerns of the visualization of access sites, she was still concerned because the staff could not visualize that patient’s vascular site from the nurses’ station, and that staff must be in the immediate area to see those sites. -Stated, “Staff were not consulted for the changes to bay 5 and I was concerned it wouldn’t pass [an] inspection.” 18559 Interview on 7/30/25 at 12:00 p.m. with dialysis supervisor A and PCT C revealed patients (3 and 4) were scheduled to and would have received dialysis in bays 1 and 5 that day (7/30/25). Notice: On 7/30/25 at 1:18 p.m. administrator B and dialysis supervisor A was notified of the IJ for failure to ensure patients receiving dialysis in bays 1 and 5 faces, vascular access sties, and bloodline connections were always visible during dialysis treatments. An immediate plan of correction (POC) was requested from administrator A on 7/30/25 at 1:18 p.m. Removal Plan: The provider’s immediate POC received and reviewed on 7/31/25 at 8:20 a.m. included: *”Bay 5 (eastern most bay) will no longer be used Until Further Notice (UFN). Staff is [was] notified as of 7/30/25 not to use station 5 until visibility of patients at all times is possible. *The transparent glass in bay 1 was removed on the 30th of July 2025 to further facilitate staff view of the dialysis treatment area. *The administrator will work with Avera Leadership to develop a plan to remodel Bay 5 (eastern most bay) so that the staff will have constant visualization of the access site of patients at all times. Initial plan has been drafted on 7/31/25 and is being sent out to bid through contractors. *Contingency funds will be requested from Avera to complete this project as soon as possible.” The removal plan was approved by the surveyors onsite, and the IJ was removed on 7/31/25 at 8:35 a.m. The deficiency remained at a condition level after the removal of the IJ and compliance with the immediate POC. Review of the provider’s 11/29/23 Hemodialysis: Initiation and Recirculation policy revealed a patient’s face, access site, and bloodline connections should have been visible.”
-
Patient Plan Of Care - Goals - Community-Based Standards
The inspectors’ words, 399 words
“POC-GOALS=COMMUNITY-BASED STANDARDS CFR(s): 494.90 The interdisciplinary team as defined at §494.80 must develop and implement a written, individualized comprehensive plan of care that specifies the services necessary to address the patient’s needs, as identified by the comprehensive assessment and changes in the patient’s condition, and must include measurable and expected outcomes and estimated timetables to achieve these outcomes. The outcomes specified in the patient plan of care must be consistent with current evidence-based professionally-accepted clinical practice standards. This Standard is not met as evidenced by: 50915 Based on observation, interview, and policy review, the provider failed to ensure the prescribed dialysis prescription was followed for one of one sampled patient (1). Findings include: 1. Observation on 7/30/25 at 4:35 p.m. of patient 1 during her dialysis treatment revealed: *The dialysate (a fluid that helps clean the blood during dialysis) connected to the machine was 2 K [Potassium], 2.5 Ca [Calcium]. -Patient 1’s prescribed dialysate was 3 K, 2.5 Ca. 2. Interview on 7/30/25 at 4:37 p.m. with registered nurse (RN) D revealed: *She verified the wrong prescribed dialysate was being used for resident 1’s dialysis treatment and immediately changed the dialysate to the correct prescription. *She stated that she performed the machine set-up and attached the wrong dialysate. -She stated patient care technologist C should have also verified the prescription when the dialysis treatment started. -Patient care technologist C was not available for interview on 7/31/25. *She then reported the medication error to her supervisor and completed an incident report. 3. Interview on 7/31/25 at 10:35 a.m. with dialysis supervisor A revealed: *She was aware of the medication error made by RN D on 7/30/25. *She expected that the patient’s prescribed dialysate would be verified by the staff according to the medication administration policy before the dialysis treatment was started. 4. Review of the provider’s 2/2023 medication administration policy revealed: *Section C. Medication administration, “3. The following will be verified at the patient [patient’s] bedside prior to medication administration.” -“a. right patient - no medications are to be administered to patients without proper identification with an ID band, comparing the patient name and birthdate on the ID band with the medication administration record. Recurring outpatient identification is verified by the patient stating his/her name and birthdate.” -“b. right medication - based on the medication order and product label; verify the patient has no allergies or contraindications to the medication.””
The one inspection in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Jul 31, 2025 | Standard inspection | 2 deficiencies cited |
Is it certified?
- Medicare-certified dialysis facility, certified or last recertified on May 1, 2002.
- Run as a non-profit.
- Cited at For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. in the last three years: it didn’t meet a whole condition of Medicare’s rules for dialysis facilities.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for dialysis facilities.
- None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
What does it offer?
- Offers in-center hemodialysis.
- Doesn’t offer peritoneal dialysis, home hemodialysis training and a shift starting at 5 p.m. or later.
- 5 dialysis stations.
- CMS doesn’t publish staffing levels for dialysis facilities.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
Who owns it?
- CMS lists it as independent, not owned or managed by a chain.
- CMS publishes no owners file for dialysis facilities, so no other owner is named.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
How do patients fare?
- CMS rates it 4 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
- Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, as expected; patients dialysing through a fistula, as expected; patients on a kidney transplant waitlist, as expected.
- CMS gives no CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.: “Survey data not available for this reporting period.”
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Star ratingCMS’s star rating for dialysis facilities, 1 to 5 | 4 of 5 |
| Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5 | Not rated |
How does it compare nearby?
- No other dialysis facility CMS lists is in Gregory County.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
- CMS doesn’t publish staffing levels for dialysis facilities.
- CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.
Sources
-
Centers for Medicare & Medicaid Services, Dialysis Facility - Listing by Facility (23ew-n7w9).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (ICH CAHPS) - Facility (59mq-zhts).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies (ESRD_2567s_2018_to_2026YTD.xlsx).
Released Oct 28, 2026 and checked Oct 30, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 30, 2026.
From the facility
The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.