Hearth Record

Usrc Edgefield

A dialysis facility in Edgefield, South Carolina 29824

306 Main Street, Edgefield, South Carolina 29824. (803) 637-3225.

CMS’s own record, on Care Compare

Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.

The short answer

Record last released by CMS on Oct 28, 2026.

The last 24 months 7 deficiencies in 1 month of the last 36. Last cited Mar 2024. Most serious: Condition-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean4
Star ratings
CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
Condition-level deficiency
For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual.

What did inspectors find?

The last inspection on record was on Mar 6, 2024: a standard inspection.

7 deficiencies cited in the last three years, 1 of them at condition level, the most serious.

1 deficiency at condition level, the more serious of CMS’s two levels

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

When those deficiencies happened

7 deficiencies in 1 month of the last 36. Last cited Mar 2024. Most serious: Condition-level. The last 3 years, to Oct 30, 2026.

7 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 NovDec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOct

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

Mar 6, 2024: standard inspection7 deficiencies
  • Cfc - Infection Control

    The inspectors’ words, 144 words

    “CFC-INFECTION CONTROL CFR(s): 494.30 This Condition is not met as evidenced by: 28883 Based on observations, interviews, and review of the facility’s policies and procedures, the facility failed to ensure staff responsible for monitoring and changing external wetted transducer protectors adhered to the facility’s policies for management of wetted external transducer protectors for 3 of 4 staff identified as responsible for the management of the external transducers during hemodialysis. Lack of accurate management of the external transducer protectors could potentially cross contaminate the dialysis machine with blood borne pathogens for other patients. The findings are: Cross Reference to V-0120: Dialysis staff responsible for monitoring and changing wetted external transducer protectors failed to change 3 of 4 wetted external transducer protectors per the facility’s policy and failed to inspect the backside of 2 of 4 wetted external transducer protectors when removed from the dialysis machine.”

    Rule V0110. Condition-level.

  • Ic - Transducer Protectors: Not Wetted/Changed

    The inspectors’ words, 1,025 words

    “IC-TRANSDUCER PROTECTORS-NOT WETTED/CHANGED CFR(s): 494.30(a)(1)(i) Use external venous and arterial pressure transducer filters/protectors for each patient treatment to prevent blood contamination of the dialysis machines’ pressure monitors. If the external transducer protector becomes wet, replace immediately and inspect the protector. If fluid is visible on the side of the transducer protector that faces the machine, have qualified personnel open the machine after the treatment is completed and check for contamination. This includes inspection for possible blood contamination of the internal pressure tubing set and pressure sensing port. If contamination has occurred, the machine must be taken out of service and disinfected using either 1:100 dilution of bleach (300-600 mg/L free chlorine) or a commercially available, EPA-registered tuberculocidal germicide before reuse. Change filters/protectors between each patient treatment, and do not reuse them. Internal transducer filters do not need to be changed routinely between patients. This Standard is not met as evidenced by: 28883 Based on observations, interviews, and review of the facility policy, titled,”Intradialytic Monitoring of Patient”, the dialysis clinic nursing staff failed to immediately change a blood wetted external transducer protector for 3 of 4 patients (Patient #2, #6, and #7). Registered Nurse (RN) #1 and Patient Care Technician (PCT) #2 failed to inspect the backside of the external transducer protector for Patient #2 and #7 to determine if blood could have leaked to the backside of the wetted external transducer protector causing potential cross contamination of the hemodialysis machine with a potential bloodborne pathogen. PCT #2 could not state the action to take if blood/fluid was observed on the backside of the external transducer protector. The findings included: Observations on 3/4/24 at 12:55 PM, 1:06 PM, 1:17 PM, 1:40 PM, 2:07 PM, 2:15 PM, 2:40 PM, and 3:15 PM revealed Patient #7 dialyzing at dialysis machine 6 in dialysis station 15. The venous external transducer protector was wet on the front side with blood at the above times. Observation on 3/4/24 at 3:33 PM revealed RN #1 disconnected the wet external transducer protector from the dialysis machine with the lines and dialyzer. RN #1 did not inspect the backside of the wet external transducer protector. RN #1 took the lines and dialyzer to the biohazard box for disposal. RN #1 was informed of the observations related to RN #1 not inspecting the backside of the wetted external transducer protector. Upon inspection of the wetted external transducer protector, no blood or fluid breakthrough was observed on the backside of the wet external transducer protector. RN #1 verified she/he had not inspected the backside of the wet external transducer protector. On 3/5/24 at 2:51 PM, review of the patient’s dialysis treatment sheet dated 3/4/24 revealed documented patient and/or dialysis machine checks at 1:05 PM, 1:36 PM, 2:10 PM, and 2:39 PM without changing the wetted external transducer protector. Observations on 3/4/29 at 1:49 PM, 2:07 PM, 2:15 PM, and 2:28 PM revealed Patient #2 dialyzing at dialysis machine 2 in dialysis station 11. The venous external transducer protector was wetted on the front side with blood at all of the above times. Observations on 3/4/24 at 2:53 PM revealed PCT #2 at dialysis machine 2 in dialysis station 11. PCT #2 disconnected the external transducer protector that was wetted with blood on the front side from the dialysis machine, removed the lines/dialyzer, and without inspecting the back side of the wet external transducer protector, was attempting to place the lines/dialyzer into the biohazard container. When PCT #2 was informed that the front side of the venous external transducer protector was wetted with blood, PCT #2 observed the wet external transducer protector and verified that she/he had not observed the wet external transducer protector’s back side prior to attempting to discard it. When asked what action was necessary when blood was observed on the front side of the external transducer protector, PCT #2 stated the wet external transducer protector would require changing but could not verbalize what to do for blood strike through on the back side of the wetted external protector. When asked to look on the backside of the wetted external transducer protector, PCT #2 and the surveyor observed the backside of the wetted external transducer protector which did not have blood or fluid. After a moment, PCT #2 stated that she/he would need to check for breakthrough on the backside. When asked what was required if there was blood on the backside of the wet external transducer protector, PCT #2 did not state to pull the dialysis machine for inspection for potential internal contamination from blood borne pathogens. PCT #2 stated she/he had not been told about doing that. The wet external transducer protector was observed wetted with blood from 1:49 PM until the patient’s dialysis treatment ended at 2:30 PM. Review on 3/5/24 at 10:40 AM of the patient’s dialysis treatment sheet dated 3/4/24 revealed PCT #2 had documented a dialysis machine line check at 2:08 PM, but the wet external transducer protector was not changed. Observations on 3/4/24 at 1:40 PM, 1:46 PM, 2:07 PM, 2:15 PM, and 2:40 PM revealed Patient #6 dialyzing on dialysis machine 5 in dialysis station 13. The venous external transducer protector was observed wetted with blood on the front side at all of the above times. Review on 3/5/24 at 10:40 AM of the patient’s dialysis treatment sheet dated 3/4/24 revealed nursing staff documented either patient or dialysis machine checks at 2:09 PM and 2:39 PM. The nursing staff did not change the wet external transducer protector until 3:32 PM. On 3/6/24 at 11:01 AM of the facility policy provided by the dialysis clinic, entitled, “Intradialytic Monitoring of Patient”, revealed, “....direct patient care staff will monitor the dialysis delivery system during each dialysis treatment that included the integrity of the extracorporeal circuit. They are to monitor pressure readings (check arterial and venous drip chambers are filled with blood but are not backed up into the transducer filter protector). If the transducer filter becomes wet, replace immediately. Inspect the side of the protector that faces the machine. If fluid is visible, biomed technician will be notified and machine taken out of service after dialysis treatment is completed.””

    Rule V0120. Standard-level.

  • Carbon Adsorption - Action If First Test Positive

    The inspectors’ words, 363 words

    “CARBON ADSORP-ACTION IF FIRST TEST + CFR(s): 494.40(a) 5.2.5 Carbon adsorption: action if first test positive When samples from the first sampling port are positive for chlorine or chloramine, operation may be continued for a short time (up to 72 hours) until a replacement bed is installed, provided that samples from the second sampling port remain negative. The replacement bed should be placed in the second position, and the existing second bed should be moved to the first position to replace the exhausted bed. If it is not possible to rotate the position of the beds, both beds should be replaced. This Standard is not met as evidenced by: 28883 Based on observations, interview, and review of the facility policy, titled, “Total Chlorine Testing”, Patient Care Technician #1 who was one of one PCT observed performing the total chlorine check on the quality water failed to accurately identify the port to check if testing after the primary Carbon tank indicated a total Chlorine level of greater than or equal to 0.1 parts per million (ppm). The findings included: Observations on 3/4/24 at 2:16 PM revealed Patient Care Technician (PCT) #1 performing a total Chlorine check on the quality water. After performing the check at TP4, the port after the primary Carbon tank, PCT #1 was asked what she/he would do if the total Chlorine check resulted in a total Chlorine level greater that 0.1 ppm (parts per million). PCT #1 stated she/he would do a re-check of the sample at TP4. If the total Chlorine was still greater than 0.1 ppm, she/he would do a check at the port after the second Carbon tank, and pointed to the port labeled TP3 which was incorrect as the port labeled TP3 was actually located before the primary carbon tank. Review on 3/6/24 at 11:21 AM of the facility policy provided by the dialysis clinic, entitled, “Total Chlorine Testing” revealed that if the results of repeat Total Chlorine testing from the primary Carbon filter indicate a level of greater than or equal to 0.1 ppm, a sample should be drawn from the sample port located downstream of the second (secondary) Carbon tank or set of tanks.”

    Rule V0197. Standard-level.

  • Dialysate Proportioning - Monitor Ph/Conductivity

    The inspectors’ words, 295 words

    “DIALYS PROPORT-MONITOR PH/CONDUCTIVITY CFR(s): 494.40(a) 5.6 Dialysate proportioning: monitor pH/conductivity It is necessary for the operator to follow the manufacturer’s instructions regarding dialysate conductivity and to measure approximate pH with an independent method before starting the treatment of the next patient. This Standard is not met as evidenced by: 28883 Based on a review of the dialysis treatment sheets, the Fresenius 2008K2 Operator’s Manual, the clinic policy, entitled, “Initiation of Dialysis Treatment”, and interview, the nursing staff failed to identify and act on a dialysis machine conductivity parameter that was out of range for Patient #1 for 1 of 6 patients. The findings included: On 3/5/24 at 12:29 PM, review of a dialysis treatment sheet for Patient #1 dated 1/26/24 revealed the meter conductivity had been documented as 13.9 mS (milliSeconds) and the theoretical conductivity had been documented as 13.4 mS which was greater than 0.4 mS/cm(centimeters) difference. There was no indication of any action taken to resolve the discrepancy before the patient’s dialysis treatment started. The finding was verified by the Regional Director during an interview on 3/6/24 at 1:28 PM. On 3/6/24 at 10:28 AM, review of the Fresenius 2008K2 Operator’s Manual revealed staff are to verify conductivity is within 0.4 mS/cm (centimeters) of the theoretical conductivity, and the pH between 6.9 and 7.6. If conductivity and pH are not within these limits, do not initiate dialysis. On 3/6/24 at 11:01 AM, review of the policy provided by the dialysis clinic, entitled, “Initiation of Dialysis Treatment”, revealed two staff members must verify and document on the flow sheet indicating the conductivity and pH are within acceptable parameters. They are to verify that both the actual conductivity value on the machine and the phoenix meter value are +/-0.4 mS of TCD (Theoretical Conductivity) value.”

    Rule V0250. Standard-level.

  • Pe - Safe, Functional, Comfortable Environment

    The inspectors’ words, 252 words

    “PE-SAFE/FUNCTIONAL/COMFORTABLE ENVIRONMENT CFR(s): 494.60 The dialysis facility must be designed, constructed, equipped, and maintained to provide dialysis patients, staff, and the public a safe, functional, and comfortable treatment environment. This Standard is not met as evidenced by: 28883 Based on observations and interviews, nursing staff failed to ensure the medication refrigerator was clean and free of a black substance and debris, and expired glucose control solution was not removed from staff access in a storage drawer in the dialysis treatment room. The findings included: Observations on 3/5/24 at 9:40 AM of the medication refrigerator in the dialysis treatment room revealed a black substance covering the back area/bottom of the refrigerator in spots along with debris (paper/tape). The refrigerator contained parenteral medications that included cath flo activase, the influenza vaccine, Epogen, and Tubersol ppd (Purified Protein Derivative). The finding was verified by Registered Nurse (RN) #1 during an interview on 3/5/24 at 9:42 AM. RN #1 stated that the black spots/debris was from the Mircera (medication) packaging when it got wet. Observations on 3/6/24 at 1:45 PM of the medication refrigerator revealed it still held parenteral medications and had the black substance in the back area/bottom of the refrigerator in spots along with debris (paper/tape). Observations on 3/5/24 at 9:43 AM of a supply storage drawer in the dialysis treatment room revealed 2 opened containers of glucose control solution that expired on 1/13/24. The solution was stored next to the glucometer. The finding was verified by RN #1 on 3/5/24 at 9:45 AM.”

    Rule V0401. Standard-level.

  • Continuously Monitor/Take Action/Track/Sustain Improve

    The inspectors’ words, 386 words

    “QAPI-MONITOR/ACT/TRACK/SUSTAIN IMPROVE CFR(s): 494.110(b) The dialysis facility must continuously monitor its performance, take actions that result in performance improvements, and track performance to ensure that improvements are sustained over time. This Standard is not met as evidenced by: 28883 Based on record reviews, review of the facility policy, titled, “Incident and Sentinel Event Reporting”, and interview, the clinic nursing staff failed to ensure adverse occurrences such as clotted dialyzers were documented to ensure monitoring/tracking/trending could be carried out as appropriate. The findings included: On 3/5/24 at 3:06 PM, review of the dialysis treatment sheets for Patient #3 revealed a dialysis treatment sheet dated 2/14/24 that documented the patient’s dialyzer had clotted. A post dialysis comment by the nurse showed the dialyzer clotted with 24 minutes left for the patient’s dialysis treatment and the patient refused a new set up. On 3/5/24 at 3:30 PM, review of dialysis treatment sheets for Patient #4 revealed a dialysis treatment sheet dated 1/26/24 that documented the patient’s dialyzer had clotted. According to the documentation, the TMP alarmed. Due to the patient being Heparin free, the blood flow was decreased with the dialysis treatment ended about 10 minutes later due to dialyzer clotted. On 3/5/25 at 9:14 AM, review of adverse occurrences (e.g., clinical variances, medical errors, unusual events) for the past 6 months revealed one incident listed related to a change in level of consciousness. There was no documentation related to dialyzers clotted. On 3/6/24 at 2:28 PM, review of clinic’s Quality Assurance Process Improvement meeting minutes dated 1/29/24 and 2/23/24 revealed no documentation relative to incidents of clotted dialyzers to indicate monitoring or tracking/trending of these type of incidents. During an interview on 3/6/24 at 3:05 PM, the Regional Director verified there was no documentation in the facility incident reporting system of the clotted dialyzers for the two patients in January 2024 and February 2024 or documentation of review of the incidents during the clinic’s QAPI (Quality Assessment Performance Improvement) meetings. On 3/6/24 at 11:23 AM, review of the facility policy provided by the dialysis clinic, entitled, “Incident and Sentinel Event Reporting” revealed that all occurrences/incidents involving patients would be documented on an occurrence/incident report and reviewed by the Facility Administrator. The incident report must be completed within 24 hours of the occurrence. Common incidents/adverse occurrences include “Clotted Lines/Dialyzer”.”

    Rule V0638. Standard-level.

  • Staff Licensed As Req/Qualified/Demonstrate Competencies

    The inspectors’ words, 642 words

    “PQ-STAFF LIC AS REQ/QUAL/DEMO COMPETENCY CFR(s): 494.140 All dialysis facility staff must meet the applicable scope of practice board and licensure requirements in effect in the State in which they are employed. The dialysis facility’s staff (employee or contractor) must meet the personnel qualifications and demonstrated competencies necessary to serve collectively the comprehensive needs of the patients. The dialysis facility’s staff must have the ability to demonstrate and sustain the skills needed to perform the specific duties of their positions. This Standard is not met as evidenced by: 28883 Based on observations, record reviews, interview, and review of the facility policy, titled, “Initiation of Dialysis Treatment”, the nursing staff failed to ensure the dialysis treatment sheet documentation included comments about the patient’s status at least every 30 minutes for (Patient #1, #3, #4, and #5) which was 4 of 5 patients reviewed for monitoring. One of four random patients observed for dialysis treatment initiation did not have orders followed related to the dialysate flow rate. The findings included: On 3/5/24 at 12:29 PM, review of the dialysis treatment sheets for Patient #1 revealed staff had not documented monitoring of the patient at least every 30 minutes. A dialysis treatment dated 1/29/24 documented the dialysis treatment started at 1:50 PM with a comment indicating monitoring at 3:05 PM, but missing the 2:30 PM monitoring. A dialysis treatment dated 2/19/24 documented monitoring at 2:33 PM and again at 3:33 PM. A dialysis treatment dated 2/28/24 documented monitoring at 2:32 PM and again at 4:07 PM. A dialysis treatment dated 3/4/24 documented monitoring at 2:43 PM and again at 3:34 PM, at 3:35 PM, and again at 4:40 PM. On 3/5/24 at 3:06 PM, review of the dialysis treatment sheets for Patient #3 revealed monitoring had not been documented at least every 30 minutes. A dialysis treatment sheet dated 3/4/24 documented monitoring at 9:08 AM and again at 10:09 AM. On 2/23/24, staff documented a blood pressure and pulse at 8:06 AM and again at 9:00 AM and a comment related to monitoring at 8:06 AM and again at 9:08 AM. On 3/5/24 at 3:20 PM, review of the dialysis treatment sheets for Patient #4 revealed monitoring had not been documented at least every 30 minutes. On 2/9/24, a comment for monitoring had been documented at 4:01 PM and again at 5:01 PM, and on 1/22/24, monitoring had been documented at 4:33 PM and again at 5:33 PM. On 3/6/24 at 9:47 AM, review of the dialysis treatment sheets for Patient #5 revealed monitoring had not been documented at least every 30 minutes. On 2/23/24, staff documented comments at 8:02 AM and again at 9:02 AM. On 2/14/24, monitoring had been documented at 7:02 AM and again at 8:05 AM. On 3/6/24 at 11:01 AM, review of the facility policy provided by the dialysis clinic, entitled, “Initiation of Dialysis Treatment”, revealed direct patient care staff will monitor certain parameter during treatment and make a comment regarding the patient status/observation at least every 30 minutes. The findings related to lack of monitoring every 30 minutes was verified by the Regional Director during an interview on 3/6/24 at 1:32 PM. Observations on 3/4/24 at 3:01 PM revealed Registered Nurse (RN) #1 initiating a dialysis treatment for a patient on dialysis machine 4 in dialysis station 4. The dialysis treatment was started at 3:12 PM with the dialysate flow rate at 500. Observations on 3/4/24 at 3:46 PM with RN #2 revealed the dialysate flow rate was at 500. Review of physician orders with RN #2 revealed the ordered dialysate flow rate was 600. On 3/6/24 at 11:01 AM, review of the facility policy provided by the dialysis clinic, entitled, “Initiation of Dialysis Treatment”, revealed that prior to walking away from the dialysis machine, staff are to verify all prescribed orders including correct dialysate flow rate are followed.”

    Rule V0681. Standard-level.

The one inspection in the last three years
Inspections on record
DateVisitWhat the record says
Mar 6, 2024Standard inspection7 deficiencies cited

Is it certified?

  • Medicare-certified dialysis facility, certified or last recertified on Mar 20, 2006.
  • Run for profit.
  • Cited at in the last three years: it didn’t meet a whole condition of Medicare’s rules for dialysis facilities.
  • Chain: US Renal Care, Inc.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

Has it been penalized?

  • CMS doesn’t publish fines or other penalties for dialysis facilities.
  • None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

What does it offer?

  • Offers in-center hemodialysis.
  • Doesn’t offer peritoneal dialysis, home hemodialysis training and a shift starting at 5 p.m. or later.
  • 15 dialysis stations.
  • CMS doesn’t publish staffing levels for dialysis facilities.
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Who owns it?

  • Part of the US Renal Care, Inc. chain, as CMS lists it.
  • CMS publishes no owners file for dialysis facilities, so no other owner is named.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

How do patients fare?

  • CMS rates it 4 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
  • Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, as expected; patients dialysing through a fistula, as expected; patients put on a kidney transplant waitlist in their first year of dialysis, as expected; patients on a kidney transplant waitlist, as expected.
  • CMS gives no : “Too few completed survey responses to report.”
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Ratings and measures, as published
MeasureRating
Star ratingCMS’s star rating for dialysis facilities, 1 to 54 of 5
Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5Not rated

How does it compare nearby?

  • No other dialysis facility CMS lists is in Edgefield County.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
  • CMS doesn’t publish staffing levels for dialysis facilities.
  • CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Oct 30, 2026.

From the facility

The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 28, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.