Hearth Record

Dialysis Center of East Providence

A dialysis facility in East Providence, Rhode Island 02914

318 Waterman Avenue, East Providence, Rhode Island 02914. (401) 435-5200.

CMS’s own record, on Care Compare

Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.

The short answer

Record last released by CMS on Oct 14, 2026.

The last 24 months 4 deficiencies in 1 month of the last 36. Last cited Jul 2025. Most serious: Standard-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean3
Star ratings
CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.

What did inspectors find?

The last inspection on record was on Jul 10, 2025: a standard inspection.

4 deficiencies cited in the last three years.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.

When those deficiencies happened

4 deficiencies in 1 month of the last 36. Last cited Jul 2025. Most serious: Standard-level. The last 3 years, to Oct 19, 2026.

4 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 NovDec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOct

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.

Jul 10, 2025: standard inspection4 deficiencies
  • Microbial Monitoring - Mo Dialysate Sample/Collection/Freq

    The inspectors’ words, 533 words

    “MICROB MONITOR-MO DIALYS SAMPLE/COLLECT/FREQ CFR(s): 494.40(a) 7.2 Microbial monitoring methods: 7.2.1 General: Dialysate: monthly dialysate sample/collection/freq Culture ...dialysate fluid weekly for new systems until a pattern has been established. For established systems, culture monthly unless a greater frequency is dictated by historical data at a given institution. Dialysate samples should be collected from at least two machines monthly and from enough machines so that each machine is tested at least once per year. If testing of any dialysis machine reveals a level of contamination above the action level, an investigation should be conducted that includes retesting the offending machine, reviewing compliance with disinfection and sampling procedures, and evaluating microbiological data for the previous 3 months to look for trends. The medical director also should be notified. An example of a decision tree for this process is given in Figure 1. 7.2.2 Sample collection Dialysate samples should be collected from a dialysate port of the dialyzer ... [or] dialysate sampling ports that can be accessed using a syringe. At least 25 mL of fluid, or the volume specified by the laboratory performing the test, should be collected in sterile endotoxin-free specimen containers. This Standard is not met as evidenced by: 46715 Based on record review and staff interview it has been determined that the facility failed to ensure that dialysate (a specially formulated solution to remove waste products and excess fluid from the blood when the kidneys are not functioning properly) samples were collected from at least two dialysis machines monthly and from enough machines so that each machine was tested once per year for 2 of 24 machines reviewed, machine #s 5 and 6. Findings are as follows: Review of a facility policy titled, “Microbiological testing: Dialysate” dated 2/5/2024 states in part, “...Machine Dialysate Testing Frequency: All dialysis machines must be tested: for bacteria and endotoxin. Scheduled so as each machine is sampled within a calendar year. Minimum of 2 machines each calendar month...” Review of a dialysate and endotoxin schedule for 2024 revealed that machine #s 5 and 6 are to be tested in January of every calendar year. Review of the “Environmental Testing Results” from January of 2024 through June of 2025 revealed that the last date that machine #s 5 and 6 were tested for bacteria and endotoxins was 1/8/2024, indicating that they are 6 months overdue for annual testing. Surveyor observation on 7/9/2025 at approximately 11:15 AM revealed a patient was undergoing dialysis treatment on machine #5. During a surveyor interview on 7/10/2025 at approximately 10:00 AM with the Facility Technical Manager, he acknowledged that both machine #s 5 and 6 were not tested annually per the facility policy and the regulation. Additionally, he revealed that samples had been taken from both machines for dialysate testing after it was brought to the facility’s attention by the surveyor. During a surveyor interview on 7/10/2025 at 10:15 AM with the Clinic Manager, she revealed that she would expect every machine to be tested annually per the regulation and the facility policy. During a surveyor observation on 7/10/2025 at 10:40 AM of the treatment room revealed both machine #s 5 and 6 were in the dialysis treatment room to be used. 47279”

    Rule V0253. Standard-level.

  • Pe - Safe, Functional, Comfortable Environment

    The inspectors’ words, 241 words

    “PE-SAFE/FUNCTIONAL/COMFORTABLE ENVIRONMENT CFR(s): 494.60 The dialysis facility must be designed, constructed, equipped, and maintained to provide dialysis patients, staff, and the public a safe, functional, and comfortable treatment environment. This Standard is not met as evidenced by: 47279 Based on surveyor observation and staff interview, it has been determined that the facility failed to be maintained to provide dialysis patients and staff with a safe and functioning treatment environment. Findings are as follows: Surveyor observation on 7/9/2025 at approximately 2:30 PM of the patient treatment area in the presence of the Clinic Manager and the Clinical Regulatory Manager, revealed the following: - A large glass window panel with spiderwebbed cracks throughout - A double bay sink with tape over the basins. During a surveyor interview immediately following the above observations with the Clinic Manager and the Clinical Regulatory Manager, they acknowledged the cracked glass window panel and that the sink had tape over the basins. Additionally, the Clinic Manager indicated the window has been in that condition for a while, but she did not realize it was the glass that was cracked and thought that it was only the film that covered the glass that was damaged. Further, she revealed the sink has been out of service for a while because of a plumbing issue that has been unresolved. Furthermore, they were unable to provide evidence that the facility maintained a safe and functioning treatment environment for the patients and staff.”

    Rule V0401. Standard-level.

  • Pe - Building - Constructed/Maintained To Ensure Safety

    The inspectors’ words, 283 words

    “PE-BUILDING-CONSTRUCT/MAINTAIN FOR SAFETY CFR(s): 494.60(a) The building in which dialysis services are furnished must be constructed and maintained to ensure the safety of the patients, the staff and the public. This Standard is not met as evidenced by: 46715 Based on surveyor observation and staff interview it has been determined that the facility failed to ensure that the building is maintained to ensure the safety of patients and staff, relative to the access to the patient treatment area being restricted to authorized personnel only for 1 of 1 patient treatment room. Findings are as follows: During a surveyor observation on 7/8/2025 at approximately 8:45 AM during the initial flash tour of the facility revealed the Clinic Manager entering the treatment room through double doors. Further observation revealed that she entered through the left-sided door that was unlocked. During an interview directly following the above observation the Clinic Manager acknowledged that there are locks on the doors leading to the treatment room, however, she revealed that the lock for the left door has been broken for a while. During a surveyor observation on 7/8/2025 at approximately 11:00 AM the left door leading to the patient treatment room was noted to be propped open. Additionally, neither the receptionist nor any other staff were present in the front office or immediate vicinity. During subsequent surveyor observations from 7/8/2025 through 7/10/2025 revealed the left door that leads to the patient treatment room was left unlocked and accessible. During a surveyor interview on 7/9/2025 at approximately 2:30 PM with the Clinic Manager and the Clinical Regulatory Manager they acknowledged that the broken lock of the left door allowed access to the patient treatment area by unauthorized personnel. 47279”

    Rule V0402. Standard-level.

  • Pe - Equipment Maintenance - Manufacturer’S Dfu

    The inspectors’ words, 400 words

    “PE-EQUIPMENT MAINTENANCE-MANUFACTURER’S DFU CFR(s): 494.60(b) The dialysis facility must implement and maintain a program to ensure that all equipment (including emergency equipment, dialysis machines and equipment, and the water treatment system) are maintained and operated in accordance with the manufacturer’s recommendations. This Standard is not met as evidenced by: 47279 Based on surveyor observation and staff interview, it has been determined that the facility failed to ensure that the water filtration and distribution equipment was properly maintained for the water and dialysate (a specially formulated solution to remove waste products and excess fluid from the blood when the kidneys are not functioning properly) treatment systems including the Reverse Osmosis (RO) machine (a water purification system that uses a semi-permeable membrane to remove contaminants from water used in dialysis treatments) and components of the dialysate storage tank and water pump. Findings are as follows: 1a. During a surveyor observation on 7/8/2025 at approximately 8:45 AM of the water treatment area, in the presence of the Clinic Manager and the Facility Technical Manager (FTM), revealed the following: - Clear fluid leaking from the regulator (a component of the RO machine) and dripping on the floor below, forming a puddle - An accumulation of a crystallized white substance approximately the size of a grapefruit noted in two separate areas of components of the dialysate storage and distribution system including the piping attached to the storage tank and the piping of the distribution system leading to the patient treatment center During a surveyor interview immediately following the above observations with the FTM in the presence of the Clinic Manager, he acknowledged the leaking regulator and build-up of white substances and indicated he was aware of both but had yet to address them. 1b. During a surveyor observation on 7/10/2025 at approximately 8:30 AM of the water treatment area, in the presence of the FTM, revealed one of the two water pumps that propel water into the water treatment and distribution system was noted to be leaking. During a surveyor interview immediately following the above observation with the FTM, he acknowledged the leaking water pump. During a surveyor interview on 7/10/2025 at approximately 1:00 PM with the Clinic Manager, in the presence of the FTM and Clinical Regulatory Manager, they were unable to provide evidence that the facility properly maintained all components of the water filtration and distribution system and dialysate storage and distribution system.”

    Rule V0403. Standard-level.

The one inspection in the last three years
Inspections on record
DateVisitWhat the record says
Jul 10, 2025Standard inspection4 deficiencies cited

Is it certified?

  • Medicare-certified dialysis facility, certified or last recertified on Jun 4, 2004.
  • Run for profit.
  • No deficiency on record in the last three years.
  • Chain: American Renal Associates.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.

Has it been penalized?

  • CMS doesn’t publish fines or other penalties for dialysis facilities.
  • None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.

What does it offer?

  • Offers in-center hemodialysis and peritoneal dialysis.
  • Doesn’t offer home hemodialysis training and a shift starting at 5 p.m. or later.
  • 21 dialysis stations.
  • CMS doesn’t publish staffing levels for dialysis facilities.
  • In CMS’s survey, patients rate its staff 4 of 5.
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Who owns it?

  • Part of the American Renal Associates chain, as CMS lists it.
  • CMS publishes no owners file for dialysis facilities, so no other owner is named.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

How do patients fare?

  • CMS rates it 4 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
  • Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; blood transfusions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, better than expected; patients dialysing through a fistula, as expected; patients put on a kidney transplant waitlist in their first year of dialysis, as expected; patients on a kidney transplant waitlist, better than expected.
  • Patients rate it 3 of 5 in CMS’s survey of in-center hemodialysis patients (44 interviews, Oct 18, 2024 to Jul 11, 2025): 75% rated the facility 9 or 10 out of 10.
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Ratings and measures, as published
MeasureRating
Star ratingCMS’s star rating for dialysis facilities, 1 to 54 of 5
Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 53 of 5

How does it compare nearby?

  • Of the 11 dialysis facilities CMS lists in Providence County, 11 have a star rating from CMS: 3 rated 5 of 5, 2 rated 4 of 5, 5 rated 3 of 5, 1 rated 2 of 5.
  • CMS rates this one 4 of 5.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
  • CMS doesn’t publish staffing levels for dialysis facilities.
  • CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Oct 19, 2026.

From the facility

The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 28, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.