Dialysis Center of Tiverton
A dialysis facility in Tiverton, Rhode Island 02878
22 Hurst Lane, Tiverton, Rhode Island 02878. (401) 624-4403.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 28, 2026.
- 5of 5 CMS’s star rating
- 5of 5 patient survey rating
- 3 deficiencies cited in the last three years
- 21 dialysis stations
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Feb 7, 2024: a complaint inspection.
3 deficiencies cited in the last three years.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
When those deficiencies happened
3 deficiencies in 1 month of the last 36. Last cited Feb 2024. Most serious: Standard-level. The last 3 years, to Oct 30, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Feb 7, 2024: complaint inspection3 deficiencies
-
Pe - Safe, Functional, Comfortable Environment
The inspectors’ words, 340 words
“PE-SAFE/FUNCTIONAL/COMFORTABLE ENVIRONMENT CFR(s): 494.60 The dialysis facility must be designed, constructed, equipped, and maintained to provide dialysis patients, staff, and the public a safe, functional, and comfortable treatment environment. This Standard is not met as evidenced by: 41720 Based on surveyor observation, record review, and staff interview, it has been determined that the facility failed to be maintained to provide dialysis patients, staff, and the public with a comfortable treatment environment, relative to garbage and other debris on the grounds of the facility. Findings are as follows: Review of a community reported complaint received at the Rhode Island Department of Health on 2/1/2024, alleges in part, “...the exterior of the building is not well maintained. The paint and facade are deteriorating, and on the west side of the building the paved area is breaking away and often times there is standing water in that area. Pine trees on the west side are not being trimmed at their base and therefore debris is being trapped in the lower branches...” Surveyor observation on 2/7/2024 at 8:25 AM of the exterior of the building revealed four visibly dirty surgical masks, discarded examination gloves, and other paper debris strewn about on the ground and in the shrubbery along the walkway leading to the facility. Further observations revealed additional discarded materials such as surgical masks on the ground and intertwined within the lower branches of a pine tree in the front of the building. During an additional surveyor observation on 2/7/2024 at 10:15 AM in the presence of the Facility Technical Manager (FTM), he acknowledged the above observations and indicated that he was aware that outside of the building has not been maintained but is unaware for how long. Additionally, he indicated that he is responsible for maintaining the building and the grounds. During a surveyor interview on 2/7/2024 at 12:00 PM with the Regional Technical Manager, he indicated that his expectation would be that all staff would monitor the outside of the building to ensure that the area is free of garbage and debris.”
-
Pe - Equipment Maintenance - Manufacturer’S Dfu
The inspectors’ words, 326 words
“PE-EQUIPMENT MAINTENANCE-MANUFACTURER’S DFU CFR(s): 494.60(b) The dialysis facility must implement and maintain a program to ensure that all equipment (including emergency equipment, dialysis machines and equipment, and the water treatment system) are maintained and operated in accordance with the manufacturer’s recommendations. This Standard is not met as evidenced by: 41720 Based on surveyor observation, record review and staff interview, it has been determined that that facility failed to ensure that the acid bicarbonate distribution system was properly maintained (bicarbonate is added to the dialysis fluid during hemodialysis to replenish the buffers in the body and neutralize acid accumulation between dialysis treatments), for 1 of 1 bicarbonate storage tank observed. Findings are as follows: Review of the facility’s monthly maintenance documentation of the Acid/Bicarbonate Distribution System, states in part, “...The expectation is that systems will have little to no build up of precipitate [matter that forms on the exterior of the systems due to seepage of the contents]. External surfaces should be sprayed with vinegar and wipe down precipitate...” Surveyor observation on 2/7/2024 at 10:01 AM of the bicarbonate storage tank in the presence of the Facility Technical Manager (FTM), revealed a buildup of thick white, hardened crystallized matter approximately two inches wide, surrounding the entirety of the area where the drainage tubing and spigot of the tank connect. Further observation revealed multiple pieces of this white hard crystallized matter on the floor underneath the tubing and the spigot’s connection. During a surveyor interview immediately following the above-mentioned observation, the FTM indicated that the white hard crystallized matter is a build up of acid. Additionally, he revealed that he was aware of the built-up of acid precipitate and indicated it has been like that since he began working at the facility in early January of this year. During a surveyor interview on 2/7/2024 at 12:00 PM with the Regional Technical Manager, he indicated that his expectation would be that the acid/bicarbonate distribution system would be properly maintained.”
-
Internal Grievance Process Components & Implemented
The inspectors’ words, 382 words
“GOV-INTERNAL GRIEVANCE SYS ID/IMPLEMENTED CFR(s): 494.180(e) The facility’s internal grievance process must be implemented so that the patient may file an oral or written grievance with the facility without reprisal or denial of services. The grievance process must include- (1) A clearly explained procedure for the submission of grievances. (2) Timeframes for reviewing the grievance. (3) A description of how the patient or the patient’s designated representative will be informed of steps taken to resolve the grievance. This Standard is not met as evidenced by: 41720 Based on record review and staff interview, it has been determined that the facility failed to ensure that their grievance process was implemented and included a description of how the patient will be informed of the steps taken to resolve their grievance for 1 of 1 grievance reviewed. Findings are as follows: Review of the facility policy titled, “Grievance Process: Patients”, states in part, “...The Center Manager will keep a log of all patient complaints that are addressed and resolved without progressing to a formal grievance. The log should include the patient name, complaint, and date/details of complaint resolution. The Center Manager shall keep a log of all grievances that notes the date the grievance was initiated and the ongoing status of the grievance...” During a surveyor interview on 2/7/2024 at 11:25 AM with Patient ID #1, s/he indicated that s/he had discussed concerns s/he had regarding the lack of maintenance of the facility and the grounds with staff previously. Additionally, s/he indicated that s/he has not received any follow-up regarding the status of his/her grievance. Review of a document titled, “Complaint and Grievance Tracking Form”, revealed in part, that Resident ID #1 filed a grievance relative to “...messy parking lot; trash, lawns not well maintained...” in September of 2023. Further review revealed the resolution documented was, “...will speak with FTM to speak with lawn services/maintenance...” During a surveyor interview on 2/7/2024 at 12:52 PM with the Clinical Manager, she was unable to provide evidence of a resolution to the complaint that Patient ID #1 submitted in September of 2023. Additionally, she acknowledged that the outside of the building has not been maintained and that all staff are responsible for ensuring that garbage and debris are not littered about on the property grounds. Cross Reference V-401”
The one inspection in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Feb 7, 2024 | Complaint inspection | 3 deficiencies cited |
Is it certified?
- Medicare-certified dialysis facility, certified or last recertified on Sep 3, 1998.
- Run for profit.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Chain: American Renal Associates.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for dialysis facilities.
- 3 deficiencies cited in the last three years came from inspections that included a complaint investigation.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
What does it offer?
- Offers in-center hemodialysis.
- Doesn’t offer peritoneal dialysis, home hemodialysis training and a shift starting at 5 p.m. or later.
- 21 dialysis stations.
- CMS doesn’t publish staffing levels for dialysis facilities.
- In CMS’s survey, patients rate its staff 5 of 5.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
Who owns it?
- Part of the American Renal Associates chain, as CMS lists it.
- CMS publishes no owners file for dialysis facilities, so no other owner is named.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
How do patients fare?
- CMS rates it 5 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
- Compared by CMS with what it expects for the facility’s patients: patient survival, better than expected; hospital admissions, as expected; readmissions to hospital, as expected; blood transfusions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, as expected; patients dialysing through a fistula, as expected; patients on a kidney transplant waitlist, as expected.
- Patients rate it 5 of 5 in CMS’s survey of in-center hemodialysis patients (49 interviews, Oct 18, 2024 to Jul 11, 2025): 86% rated the facility 9 or 10 out of 10.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Star ratingCMS’s star rating for dialysis facilities, 1 to 5 | 5 of 5 |
| Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5 | 5 of 5 |
How does it compare nearby?
- No other dialysis facility CMS lists is in Newport County.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
- CMS doesn’t publish staffing levels for dialysis facilities.
- CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.
Sources
-
Centers for Medicare & Medicaid Services, Dialysis Facility - Listing by Facility (23ew-n7w9).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (ICH CAHPS) - Facility (59mq-zhts).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies (ESRD_2567s_2018_to_2026YTD.xlsx).
Released Oct 28, 2026 and checked Oct 30, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 30, 2026.
From the facility
The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.