Davita Delaware Valley Dialysis Center
A dialysis facility in Milford, Pennsylvania 18337
102 Davita Drive, Milford, Pennsylvania 18337. (570) 491-9210.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 28, 2026.
- 3of 5 CMS’s star rating
- Not rated patient survey rating
- 3 deficiencies cited in the last three years
- 16 dialysis stations
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Sep 3, 2025: a standard inspection.
3 deficiencies cited in the last three years.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
When those deficiencies happened
3 deficiencies in 1 month of the last 36. Last cited Sep 2025. Most serious: Standard-level. The last 3 years, to Oct 30, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Sep 3, 2025: standard inspection3 deficiencies
-
Carbon Adsorption - Monitoring, Testing Frequency
The inspectors’ words, 509 words
“CARBON ADSORP-MONITOR, TEST FREQUENCY CFR(s): 494.40(a) 6.2.5 Carbon adsorption: monitoring, testing freq Testing for free chlorine, chloramine, or total chlorine should be performed at the beginning of each treatment day prior to patients initiating treatment and again prior to the beginning of each patient shift. If there are no set patient shifts, testing should be performed approximately every 4 hours. Results of monitoring of free chlorine, chloramine, or total chlorine should be recorded in a log sheet. Testing for free chlorine, chloramine, or total chlorine can be accomplished using the N.N-diethyl-p-phenylene-diamine (DPD) based test kits or dip-and-read test strips. On-line monitors can be used to measure chloramine concentrations. Whichever test system is used, it must have sufficient sensitivity and specificity to resolve the maximum levels described in [AAMI] 4.1.1 (Table 1) [which is a maximum level of 0.1 mg/L]. Samples should be drawn when the system has been operating for at least 15 minutes. The analysis should be performed on-site, since chloramine levels will decrease if the sample is not assayed promptly. This Standard is not met as evidenced by: 19122 Based on review of facility policy/procedure and documentation and based on interview with the chief technician (Employee #6) and the Administrator (Employee #5), the facility failed to ensure total chlorine testing had been conducted in accordance with facility policy/procedure for 44 of 75 in-center hemodialysis (HD) treatment dates between June 1 and August 27, 2025. Findings include: On August 27, 2025 at approximately 1:35 PM, review of facility policy 1-18-10, titled “CM130 Total Chlorine Online Monitor Daily Start-Up and End of Day Procedures”, revealed the following: Notes: The CM130 Total Chlorine comparison is done on a daily basis prior to the use of dialysis quality water for any process and the start of dialysis treatment(s) and then the device will automatically check the chlorine level every five (5) minutes until all activities that require use of dialysis quality water are completed. Procedure: 5. Perform a manual total chlorine test utilizing the approved method of total chlorine test for the facility... 6. Compare the CMS130 reading to the total chlorine test device measurement...Document manual results in IT Clinical System and verify CMS130 results are automatically transferring... Between August 27, 2025 at approximately 9:28 AM and August 28, 2025 at approximately 12:30 PM, review of “Routine Total Chlorine Testing Log 1-18-02A” and “Water Monitoring Log” documentation failed to reveal that HD staff performed manual verification of the CM130 total chlorine result prior to the initiation of HD treatments for 44 of 75 treatment days between June 1 and August 27, 2025. During interview conducted on August 27, 2025 at approximately 2:03 PM, the Chief Technician confirmed manual verification of the CM130 total chlorine result is to be completed prior to the initiation of HD treatments. During interview conducted on August 28, 2025 at approximately 9:15 AM, the Administrator confirmed manual verification of the CM130 total chlorine result prior to the initiation of HD treatments had not been conducted in accordance with facility policy/procedure between June 1 and August 27, 2025.”
-
Frequency Reassessment - Unstable - Monthly
The inspectors’ words, 320 words
“PA-FREQUENCY REASSESSMENT-UNSTABLE Q MO CFR(s): 494.80(d)(2) In accordance with the standards specified in paragraphs (a)(1) through (a)(13) of this section, a comprehensive reassessment of each patient and a revision of the plan of care must be conducted- At least monthly for unstable patients including, but not limited to, patients with the following: (i) Extended or frequent hospitalizations; (ii) Marked deterioration in health status; (iii) Significant change in psychosocial needs; or (iv) Concurrent poor nutritional status, unmanaged anemia and inadequate dialysis. This Standard is not met as evidenced by: 19122 Based on review of facility policy/procedure and medical records and based on interview with the Administrator (Employee 5), the facility failed to ensure a plan of care was completed monthly for one (1) of three (3) unstable hemodialysis (HD) patients. (Patient #5) Findings include: On August 29, 2025 at approximately 12:53 PM, review of facility policy 1-14-01, titled Interdisciplinary Team (IDT) Patient Assessment and Plan of Care, revealed the following on page 8: Monthly (unstable patients)...Monthly until the patient is determined by the interdisciplinary team to be stable... Patient #5 (Discharge): On August 29, 2025 at approximately 9:05 AM, September 2, 2025 at approximately 10:30 AM and September 3, 2025 at approximately 3:45 PM, review of the clinical record revealed the patient stability status was determined to be unstable effective 07/30/2024 as documented on the patient plan of care. Review of the patient plan of care documentation revealed the following: -04/30/2025: The patient’s stability status was unstable due to psychosocial issues. -06/10/2025: The patient’s stability status was unstable due to deterioration of health status. There was no documentation in the medical record which provided evidence a patient plan of care had been completed by the IDT in May 2025. During interview conducted on August 29, 2025 at approximately 2:15 PM, the Administrator confirmed a patient plan of care had not been completed by the IDT in May 2025 for patient #5.”
-
Manage Volume Status
The inspectors’ words, 568 words
“POC-MANAGE VOLUME STATUS CFR(s): 494.90(a)(1) The plan of care must address, but not be limited to, the following: (1) Dose of dialysis. The interdisciplinary team must provide the necessary care and services to manage the patient’s volume status; This Standard is not met as evidenced by: 19122 Based on review of facility policy/procedure, documentation and medical records and based on interview with the Medical Director (Employee #8) and the Administrator (Employee 5), the facility failed to ensure hemodialysis staff notified the Medical Director of abnormal pre-treatment weight findings for one (1) of one (1) unstable hemodialysis patient for whom the pre-dialysis weight was below the prescribed target weight. (Patient #5) Findings include: On August 29, 2025 at approximately 1:03 PM, review of facility policy 1-03-08, titled Pre-Intra-Post Treatment Data Collection, Monitoring and Nursing Assessment, revealed the following: Pre-Treatment Data Collection/Assessment...7. If there are no abnormal findings or concerns identified during the pretreatment data collection, the treatment may be initiated. Abnormal Findings: Unless other abnormal parameters are established by the facility Governing Body and documented in the Governing Body Meeting minutes, the following are considered abnormal findings and should be reported to the licensed nurse and documented in the medical record. Within each category, definitions may be adjusted by a patient specific order... Fluid Status...Pre-Treatment: Any weight less from the last post treatment... On August 26, 2025 at approximately 12:54 PM, review of patient complaint documentation revealed that on 02/18/2025, patient #5 reported being dehydrated by the hemodialysis (HD) treatment. Patient #5 (Discharge): On August 29, 2025 at approximately 9:05 AM, September 2, 2025 at approximately 10:30 AM and September 3, 2025 at approximately 3:45 PM, review of the clinical record revealed the patient stability status was determined to be unstable effective 07/30/2024 and the reasons for identifying the patient as being unstable included concurrent conditions, deterioration in health status (06/10/2025) and psychosocial status (07/09/2025) as documented on the plan of care. Review of hemodialysis treatment orders revealed the prescribed target weight was 90 kilograms as evidenced by the physician order provided by the Medical Director on 06/22/2025. Review of hemodialysis (HD) treatment sheet documentation revealed the following: -07/05/2025: The post-treatment weight was 87.7 kilograms (kg.) -07/12/2025 (First treatment after the 07/05/2025 HD treatment): The pre-treatment weight was 86.1 kg which was a 1.6 kg weight loss since the 07/05/2025 treatment and 3.9 kg below the prescribed target weight. Review of post-treatment assessment findings revealed the post-treatment weight was 85.9 kg and that the registered nurse obtained a physician order to decrease the target weight to 86.5 kg after completion of the HD treatment. -07/15/2025: The pre-treatment weight was 85.1 kg which was a 0.8 kg weight loss since the 07/12/2025 HD treatment and 1.4 kg below the prescribed target weight. The post-treatment weight was 84.9 kg. -07/17/2025: The pre-treatment weight was 84.2 kg which was a 0.7 kg weight loss since the 07/15/2025 HD treatment and 2.3 kg below the prescribed target weight. The post-treatment weight was 84.3 kg. There was no documentation in the medical record which provided evidence that a licensed nurse notified the Medical Director of the abnormal pre-treatment weight findings on 07/12, 07/15 and 07/17/2025. During interview conducted on August 29, 2025 at approximately 2:15 PM, the Medical Director and the Administrator confirmed abnormal pre-treatment weight findings were not reported to the Medical Director prior to the above referenced HD treatments for patient #5.”
The one inspection in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Sep 3, 2025 | Standard inspection | 3 deficiencies cited |
Is it certified?
- Medicare-certified dialysis facility, certified or last recertified on Jul 28, 1995.
- Run for profit.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Chain: DaVita.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for dialysis facilities.
- None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
What does it offer?
- Offers in-center hemodialysis, peritoneal dialysis and home hemodialysis training.
- Doesn’t offer a shift starting at 5 p.m. or later.
- 16 dialysis stations.
- CMS doesn’t publish staffing levels for dialysis facilities.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
Who owns it?
- Part of the DaVita chain, as CMS lists it.
- CMS publishes no owners file for dialysis facilities, so no other owner is named.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
How do patients fare?
- CMS rates it 3 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
- Compared by CMS with what it expects for the facility’s patients: patient survival, better than expected; hospital admissions, as expected; readmissions to hospital, as expected; blood transfusions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, as expected; patients dialysing through a fistula, as expected; patients on a kidney transplant waitlist, as expected.
- CMS gives no CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.: “Too few completed survey responses to report.”
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Star ratingCMS’s star rating for dialysis facilities, 1 to 5 | 3 of 5 |
| Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5 | Not rated |
How does it compare nearby?
- No other dialysis facility CMS lists is in Pike County.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
- CMS doesn’t publish staffing levels for dialysis facilities.
- CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.
Sources
-
Centers for Medicare & Medicaid Services, Dialysis Facility - Listing by Facility (23ew-n7w9).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (ICH CAHPS) - Facility (59mq-zhts).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies (ESRD_2567s_2018_to_2026YTD.xlsx).
Released Oct 28, 2026 and checked Oct 30, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 30, 2026.
From the facility
The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.