Hearth Record

Taos Home Dialysis

A dialysis facility in Taos, New Mexico 87571

1415 Weimer Rd, Taos, New Mexico 87571. (575) 999-6100.

CMS’s own record, on Care Compare

Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.

The short answer

Record last released by CMS on Oct 28, 2026.

The last 24 months 4 deficiencies in 1 month of the last 36. Last cited Jul 2025. Most serious: Standard-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean3
Star ratings
CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.

What did inspectors find?

The last inspection on record was on Jul 23, 2025: a standard inspection.

4 deficiencies cited in the last three years.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

When those deficiencies happened

4 deficiencies in 1 month of the last 36. Last cited Jul 2025. Most serious: Standard-level. The last 3 years, to Oct 30, 2026.

4 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 NovDec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOct

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

Jul 23, 2025: standard inspection4 deficiencies
  • Ep Program Patient Population

    The inspectors’ words, 299 words

    “EP Program Patient Population CFR(s): §403.748(a)(3), §416.54(a)(3), §418.113(a)(3), §441.184(a)(3), §460.84(a)(3), §482.15(a)(3), §483.73(a)(3), §483.475(a)(3), §484.102(a)(3), §485.68(a)(3), §485.542(a)(3), §485.625(a)(3), §485.727(a)(3), §485.920(a)(3), §491.12(a)(3), §494.62(a)(3). [(a) Emergency Plan. The [facility] must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least every 2 years. The plan must do the following:] (3) Address [patient/client] population, including, but not limited to, persons at-risk; the type of services the [facility] has the ability to provide in an emergency; and continuity of operations, including delegations of authority and succession plans.** *[For LTC facilities at §483.73(a):] Emergency Plan. The LTC facility must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least annually. The plan must do all of the following: (3) Address resident population, including, but not limited to, persons at-risk; the type of services the LTC facility has the ability to provide in an emergency; and continuity of operations, including delegations of authority and succession plans. *NOTE: [“Persons at risk” does not apply to: ASC, hospice, PACE, HHA, CORF, CMCH, RHC/FQHC, or ESRD facilities.] This Standard is not met as evidenced by: 47302 Based on record review and interview the facility failed to provide information in the emergency plan that outlined what their patient population would need in an emergency. This deficient practice can affect all patient’s and lead to lack of planning for specific patient in the event there is an emergency that limits access to the facility. The findings are: A. Record review of the facility’s emergency plan revealed that the plan did not address the specific needs of the facility’s patient population. B. During an interview on 07/22/2025 at 2:00 PM with S(Staff)1, clinical, it was confirmed that the emergency preparedness plan did not address the specific needs of the facility’s patient population.”

    Rule E0007. Standard-level.

  • Roles Under A Waiver Declared By Secretary

    The inspectors’ words, 306 words

    “Roles Under a Waiver Declared by Secretary CFR(s): §403.748(b)(8), §416.54(b)(6), §418.113(b)(6)(C)(iv), §441.184(b)(8), §460.84(b)(9), §482.15(b)(8), §483.73(b)(8), §483.475(b)(8), §485.542(b)(7), §485.625(b)(8), §485.920(b)(7), §494.62(b)(7). [(b) Policies and procedures. The [facilities] must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least every 2 years [annually for LTC facilities]. At a minimum, the policies and procedures must address the following:] (8) [(6), (6)(C)(iv), (7), or (9)] The role of the [facility] under a waiver declared by the Secretary, in accordance with section 1135 of the Act, in the provision of care and treatment at an alternate care site identified by emergency management officials. *[For RNHCIs at §403.748(b):] Policies and procedures. (8) The role of the RNHCI under a waiver declared by the Secretary, in accordance with section 1135 of Act, in the provision of care at an alternative care site identified by emergency management officials. This Standard is not met as evidenced by: 47302 Based on record review and interview the facility failed to identify what the facility’s role would be under an 1135 waiver (allowed modification of regulatory requirements) as an alternate care site. This deficient practice could lead to lack of planning if an 1135 waiver were enacted and affect all patients in an emergency. The findings are: A. Record review of the facility’s emergency plan revealed that the plan did not address what the role of the facility would be under an 1135 waiver. B. During an interview on 07/22/2025 at 2:00 PM with S(Staff)1, clinical, it was confirmed that the emergency preparedness did not contain what the role of the facility would be under an 1135 waiver.”

    Rule E0026. Standard-level.

  • Primary/Alternate Means For Communication

    The inspectors’ words, 229 words

    “Primary/Alternate Means for Communication CFR(s): §403.748(c)(3), §416.54(c)(3), §418.113(c)(3), §441.184(c)(3), §460.84(c)(3), §482.15(c)(3), §483.73(c)(3), §483.475(c)(3), §484.102(c)(3), §485.68(c)(3), §485.542(c)(3), §485.625(c)(3), §485.727(c)(3), §485.920(c)(3), §486.360(c)(3), §491.12(c)(3), §494.62(c)(3). [(c) The [facility] must develop and maintain an emergency preparedness communication plan that complies with Federal, State and local laws and must be reviewed and updated at least every 2 years [annually for LTC facilities]. The communication plan must include all of the following: (3) Primary and alternate means for communicating with the following: (i) [Facility] staff. (ii) Federal, State, tribal, regional, and local emergency management agencies. *[For ICF/IIDs at §483.475(c):] (3) Primary and alternate means for communicating with the ICF/IID’s staff, Federal, State, tribal, regional, and local emergency management agencies. This Standard is not met as evidenced by: 47302 Based on record review and interview the facility failed to have a primary and an alternate means of communication in their Emergency Preparedness Plan. This deficient practice could lead to an inability to coordinate care for all patients in the event of an emergency. The findings are: A. Record review of the facility’s Emergency Preparedness Plan undated under the section “Communication Plan,” revealed there wasn’t any primary and alternate means of communication in the event of an emergency. B. During an interview on 07/22/2025 at 2:00 PM with S(Staff)1, clinical, it was confirmed that the emergency preparedness did not contain a primary and alternate means of communication.”

    Rule E0032. Standard-level.

  • Pe - Equipment Maintenance - Manufacturer’S Dfu

    The inspectors’ words, 319 words

    “PE-EQUIPMENT MAINTENANCE-MANUFACTURER’S DFU CFR(s): 494.60(b) The dialysis facility must implement and maintain a program to ensure that all equipment (including emergency equipment, dialysis machines and equipment, and the water treatment system) are maintained and operated in accordance with the manufacturer’s recommendations. This Standard is not met as evidenced by: 47302 Based on record review, observation and interview the facility failed to ensure that the arterial drip chambers [small, transparent container that holds blood coming from the patient’s artery before it is filtered by the dialysis machine] were filled approximately ¾ full for all patients during hemodialysis (process of cleaning the blood for patients that have kidney failure) treatments for 3 (P[patients]1, P6, and P8) of 8 (P1, P2, P6, P7, P8, P9, P10 and P11) patients receiving hemodialysis treatments. This deficient practice could lead to the risk of air embolism, (a condition where air bubbles enter the bloodstream, and may cause serious health issues like heart of brain damage) blood clotting, and inefficient blood flow which can compromise patient safety and dialysis effectiveness for all patients receiving hemodialysis treatments at the facility. The findings are: A. Record review of the facility’s Hemodialysis Operator’s Manual titled, “2008T Hemodialysis Machine Operator’s Manual” dated 2024 in Chapter 2 under “Daily Preparation for Treatment” it stated, “9. Fill the arterial drip chamber to an acceptable level. using the [up] key (level adjust) on the blood pump ...” B. During an observation on 07/23/2025 at 8:30 AM, the arterial drip chamber for P1 was less than half full. C. During an observation on 07/23/2025 at 8:30 AM, the arterial drip chamber for P6 was less than half full. D. During an observation on 07/23/2025 at 8:30 AM, the arterial drip chamber for P8 was less than half full. E. During an interview on 07/23/2025 at 8:30 AM with S(staff)1, clinical, it was confirmed that the drip chambers should be filled at least ¾ full.”

    Rule V0403. Standard-level.

The one inspection in the last three years
Inspections on record
DateVisitWhat the record says
Jul 23, 2025Standard inspection4 deficiencies cited

Is it certified?

  • Medicare-certified dialysis facility, certified or last recertified on Aug 17, 2022.
  • Run for profit.
  • No deficiency on record in the last three years.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

Has it been penalized?

  • CMS doesn’t publish fines or other penalties for dialysis facilities.
  • None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

What does it offer?

  • Offers in-center hemodialysis, peritoneal dialysis and home hemodialysis training.
  • Doesn’t offer a shift starting at 5 p.m. or later.
  • 6 dialysis stations.
  • CMS doesn’t publish staffing levels for dialysis facilities.
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Who owns it?

  • CMS lists it as independent, not owned or managed by a chain.
  • CMS publishes no owners file for dialysis facilities, so no other owner is named.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

How do patients fare?

  • CMS rates it 1 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
  • Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; emergency department visits, as expected; patients dialysing through a fistula, worse than expected; patients on a kidney transplant waitlist, as expected.
  • CMS gives no : “Survey data not available for this reporting period.”
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Ratings and measures, as published
MeasureRating
Star ratingCMS’s star rating for dialysis facilities, 1 to 51 of 5
Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5Not rated

How does it compare nearby?

  • Of the 2 dialysis facilities CMS lists in Taos County, 2 have a star rating from CMS: 1 rated 3 of 5, 1 rated 1 of 5.
  • CMS rates this one 1 of 5.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

1 compared
PlaceStar rating
322514 Taos Dialysis (Dci)3

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
  • CMS doesn’t publish staffing levels for dialysis facilities.
  • CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Oct 30, 2026.

From the facility

The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 8, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.