Fkc Belleville
A dialysis facility in Belleville, New Jersey 07109
36 Newark Avenue Suite 304, Belleville, New Jersey 07109. (973) 450-0385.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 28, 2026.
- 3of 5 CMS’s star rating
- 3of 5 patient survey rating
- 3 deficiencies cited in the last three years
- 16 dialysis stations
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Nov 10, 2023: a standard inspection.
3 deficiencies cited in the last three years.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
When those deficiencies happened
3 deficiencies in 1 month of the last 36. Last cited Nov 2023. Most serious: Standard-level. The last 3 years, to Oct 30, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Nov 10, 2023: standard inspection3 deficiencies
-
Dialysate Proportioning - Monitor Ph/Conductivity
The inspectors’ words, 242 words
“DIALYS PROPORT-MONITOR PH/CONDUCTIVITY CFR(s): 494.40(a) 5.6 Dialysate proportioning: monitor pH/conductivity It is necessary for the operator to follow the manufacturer’s instructions regarding dialysate conductivity and to measure approximate pH with an independent method before starting the treatment of the next patient. This Standard is not met as evidenced by: 22676 Based on interview, policy review, and review of the manufacturers direction for use, it was determined that the facility failed to ensure that one of one bottles of Mesa Lab Potential Hydrogen (PH) solution, used to check the pH calibration of the Myron L[sic] D6 meter (a meter used to conduct the conductivity of the dialysis machines), was dated when opened as required. Findings include: During a tour of the Water Room on 11/08/23 at 9:30 AM, one bottle of Mesa Lab pH calibration solution was opened but not dated with the date it was opened. Instructions on the side of the bottle directed that it expired ninety-days from opening. The side of the bottle contained a blank to record the date opened and the date expired. During an interview on 11/08/23 at 9:30 AM, Biomedical Technician 6 confirmed the pH solution was open and not dated and therefore could not determine the last day the solution was to be used. Review of the facility’s policy titled, “Myron L D6 Maintenance Procedure,” indicated, “At the beginning of the day, check conductivity, TDS[sic] (442), and PH solution’s expirations dates. . .” N.J.A.C. 8:43A-24.4(a)”
-
Pe - Equipment Maintenance - Manufacturer’S Dfu
The inspectors’ words, 309 words
“PE-EQUIPMENT MAINTENANCE-MANUFACTURER’S DFU CFR(s): 494.60(b) The dialysis facility must implement and maintain a program to ensure that all equipment (including emergency equipment, dialysis machines and equipment, and the water treatment system) are maintained and operated in accordance with the manufacturer’s recommendations. This Standard is not met as evidenced by: 22676 Based on review of the glucometer logs, interview, facility policy review, it was determined that the facility failed to ensure the glucometers were in the control range for one of two glucometers used in the facility. This deficient practice had the potential to provide incorrect blood glucose results and could result in an inaccurate glucose result that could result in mistreated blood glucose levels and could result in harm. Findings included: Review of the electronic “Blood Glucose Logs” for unit one labeled V2 [sic] ISO (Isolation Room) from 09/01/23 through 10/31/23 revealed the following: On 09/19/23, the recorded acceptable high control range was 301-405, the recorded high control was 529. On 10/07/23, the recorded acceptable high control range was 301-405, the recorded high control was 260. On 10/31/23, the recorded acceptable low control range was 94-126 the recorded low control 132. Interview with the Administrator confirmed the findings on 11/09/23 at 11:45 AM. Both staff confirmed the staff did not repeat the low-level or high-level calibrations as required. During an interview on 11/09/23 at 1:00 PM, the Biomedical Technician 6 confirmed the above log findings. Review of the facility’s policy titled, “Blood Glucose Monitoring Device,” dated 07/05/22, revealed, under the “Policy Training” section, “Calibration of the device per manufactures recommendations, testing of the device using control solutions to assure proper functioning ...” Review of the “Embrace Pro” blood glucose monitoring system manufactures instruction revision date 09/2020 revealed, “ ...p. eleven, if the “test fall outside the range printed on the test strip vial, repeat the test ...” N.J.A.C. 8:43A-24.4(a)”
-
Achieve Adequate Clearance
The inspectors’ words, 554 words
“POC-ACHIEVE ADEQUATE CLEARANCE CFR(s): 494.90(a)(1) Achieve and sustain the prescribed dose of dialysis to meet a hemodialysis Kt/V of at least 1.2 and a peritoneal dialysis weekly Kt/V of at least 1.7 or meet an alternative equivalent professionally-accepted clinical practice standard for adequacy of dialysis. This Standard is not met as evidenced by: 22676 Based on record reviews, interview, and review of the facility’s policy, it was determined that the facility failed to follow the individualized dialysis prescription as determined by the medical provider for four of nine sampled in-center patients (Patient (P) 1, P4, P6, and P8). Failure to follow the medical providers’ dialysis prescription had the potential to negatively impact the effectiveness of the prescribed dialysis treatments. Findings include: 1. Review of P1’s electronic medical record (EMR) revealed a prescribed blood flow rate (BFR) of 350 milliliters per min (ml/min) and a dialysate flow rate (DFR) of 2.0 the BFR, which would be 700 ml/min. Review of one of six “Post Treatment” flowsheets from 10/21/23 through 11/06/23, indicated the following: On 11/06/23, the DFR was documented at 600 ml/min from 2:46 PM through the end of treatment at 6:45 PM. There was no documented rationale for the change to the prescribed DFR. 2. Review of P4s EMR revealed a prescribed BFR of 350 ml/min and a DFR of 600 ml/min. Review of three of six “Post Treatment” flowsheets from 10/25/23 through 11/03/23, indicated the following: On 10/27/23, the BFR was documented at 300 ml/min and the DFR was documented at 500 ml/min from 3:20 PM through 4:31 PM. The BFR was increased to run at 360 ml/min from 4:31 PM and the DFR was left at 500 ml/min until the end of treatment at 6:35 PM. On 10/30/23, the DFR was documented at 500 ml/min from 3:16 PM through the end of treatment at 6:30 PM. On 11/01/23, the BFR was documented at 300 ml/min from 3:59 PM through the end of treatment at 6:36 PM. There was no documented rationale for the change to the prescribed BFR and DFR. 3. Review of P6’s EMR revealed a prescribed DFR of 800 ml/min. Review of one of six “Post Treatment” flowsheets from 10/25/23 through 11/06/23, indicated the following: On 10/27/23, the DFR was documented at 700 ml/min from 11:29 AM through the end of the treatment at 2:15 PM. There was no documented rationale for the change to the prescribed DFR. 4. Review of P8’s EMR revealed a prescribed BFR of 450 ml/min and a DFR of 2.0 the BFR. Review of one of six “Post Treatment” flowsheets from 10/27/23 through 11/08/23, indicated the following: On 11/08/23, the BFR was documented at 300 ml/min and the DFR at 500 ml/min from 5:12 AM until the treatment ended at 9:27 AM. There was no documented rationale for the change to the prescribed BFR and DFR. During an interview on 10/10/32 at 9:46 AM, the Administrator confirmed the above findings and confirmed that staff did not follow the facility’s policy. Review of the facility’s policy titled, “Patient Assessment and Monitoring,” dated 05/01/23, revealed, “Check the prescribed blood flow rate is being achieved or the reason is documented in the medical record if unable to meet prescribed flow rate. Check dialysate flow rate setting is correct, and the correct prescribed flow is being ...” N.J.A.C. 8:43A-24.4(a)”
The one inspection in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Nov 10, 2023 | Standard inspection | 3 deficiencies cited |
Is it certified?
- Medicare-certified dialysis facility, certified or last recertified on Oct 3, 2018.
- Run for profit.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Chain: Fresenius Medical Care.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for dialysis facilities.
- None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
What does it offer?
- Offers in-center hemodialysis and a shift starting at 5 p.m. or later.
- Doesn’t offer peritoneal dialysis and home hemodialysis training.
- 16 dialysis stations.
- CMS doesn’t publish staffing levels for dialysis facilities.
- In CMS’s survey, patients rate its staff 2 of 5.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
Who owns it?
- Part of the Fresenius Medical Care chain, as CMS lists it.
- CMS publishes no owners file for dialysis facilities, so no other owner is named.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
How do patients fare?
- CMS rates it 3 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
- Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; blood transfusions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, as expected; patients dialysing through a fistula, as expected; patients put on a kidney transplant waitlist in their first year of dialysis, as expected; patients on a kidney transplant waitlist, as expected.
- Patients rate it 3 of 5 in CMS’s survey of in-center hemodialysis patients (39 interviews, Oct 18, 2024 to Jul 11, 2025): 64% rated the facility 9 or 10 out of 10.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Star ratingCMS’s star rating for dialysis facilities, 1 to 5 | 3 of 5 |
| Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5 | 3 of 5 |
How does it compare nearby?
- Of the 22 dialysis facilities CMS lists in Essex County, 22 have a star rating from CMS: 6 rated 5 of 5, 3 rated 4 of 5, 7 rated 3 of 5, 4 rated 2 of 5, 2 rated 1 of 5.
- CMS rates this one 3 of 5.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
- CMS doesn’t publish staffing levels for dialysis facilities.
- CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.
Sources
-
Centers for Medicare & Medicaid Services, Dialysis Facility - Listing by Facility (23ew-n7w9).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (ICH CAHPS) - Facility (59mq-zhts).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies (ESRD_2567s_2018_to_2026YTD.xlsx).
Released Oct 28, 2026 and checked Oct 30, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 30, 2026.
From the facility
The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.