Davita Millburn Dialysis
A dialysis facility in Millburn, New Jersey 07041
25 East Willow Street, Ste 2, Millburn, New Jersey 07041. (973) 379-7309.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 28, 2026. We couldn’t read Centers for Medicare & Medicaid Services’ list since Nov 2, 2026: qcor.cms.gov now refuses our reader. This record is as of then.
- 5of 5 CMS’s star rating
- 4of 5 patient survey rating
- 3 deficiencies cited in the last three years
- 18 dialysis stations
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Sep 20, 2024: a standard inspection.
3 deficiencies cited in the last three years.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
When those deficiencies happened
3 deficiencies in 1 month of the last 36. Last cited Sep 2024. Most serious: Standard-level. The last 3 years, to Oct 30, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Sep 20, 2024: standard inspection3 deficiencies
-
Ic - Clean/Dirty Areas, Med Prep Area, No Common Med Carts
The inspectors’ words, 697 words
“IC-CLEAN/DIRTY;MED PREP AREA;NO COMMON CARTS CFR(s): 494.30(a)(1)(i) Clean areas should be clearly designated for the preparation, handling and storage of medications and unused supplies and equipment. Clean areas should be clearly separated from contaminated areas where used supplies and equipment are handled. Do not handle and store medications or clean supplies in the same or an adjacent area to that where used equipment or blood samples are handled. When multiple dose medication vials are used (including vials containing diluents), prepare individual patient doses in a clean (centralized) area away from dialysis stations and deliver separately to each patient. Do not carry multiple dose medication vials from station to station. Do not use common medication carts to deliver medications to patients. If trays are used to deliver medications to individual patients, they must be cleaned between patients. This Standard is not met as evidenced by: 39228 Based on one of one observation of medication preparation, review of manufacturer’s instructions for use (MIFU), staff interviews, and a review of facility policy, it was determined that the facility failed to ensure that: 1) clean areas utilized for medication preparation are separate from hand washing sink areas to avoid possible cross contamination for one of one medication preparation observation; and 2) one of two Embrace PRO blood glucose meters are stored in a clean and dry area, in accordance with the MIFU. Findings include: 1. On 09/18/24 at 10:20 AM, while on the Treatment Floor, Sink 18, labeled “Clean Sink,” located next to the Nurse’s Station, was observed to be directly adjacent to a countertop that had a refrigerator, a cabinet underneath it, and a cabinet above it. At 11:04 AM, Staff (S) 5, the Charge Nurse, removed ten of the 10 ml (milliliter) syringes and one Heparin vial from the cabinets, and placed them onto the countertop. S5 stated that the countertop area was used for medication preparation and that he/she was going to prepare the Heparin into the ten syringes for intravenous medication administration. At 11:10 AM, while S5 prepared the Heparin syringes on the countertop, S6, a Licensed Practical Nurse, washed his/her hands with soap and water in Sink 18. S6 then dried his/her hands with a paper towel at Sink 18. This created a potential for cross contamination due to splashing while S6 washed and his/her hands at Sink 18. At 11:25 AM, an interview was conducted with S9, the Supervising Manager of Clinical Services. S9 confirmed the above finding and stated that he/she would install “Plexiglass” between the sink and the medication preparation area to protect it from potential cross contamination. Facility policy titled, “Medication Policy,” revised October 2023, stated, “... Policy: ... 21. An aseptic environment ... is used when preparing medications. ...” N.J.A.C. 8:43A-9.3(a) 50912 2. On 09/18/24 at 10:15 AM, during a tour of the Treatment Room, an Embrace PRO (Professional Choice) blood glucose meter was located on top of a narrow shelf adjacent to “Dirty” Sink 13. The surfaces of “Dirty” Sink 13 and the narrow shelf where the glucose meter was lying had multiple areas of clear liquids present. During an interview at 11:05 AM, the findings were reviewed with S2, a Registered Nurse. He/She could not determine if the blood glucose meter had been cleaned after it was last used. S2 stated that after each use, the glucometer should be cleaned with a 1:100 bleach solution, allowed to dry, and returned to the glucometer case located inside a drawer labeled “Glucometer.” When questioned, S2 was not sure if the policy was to keep the glucometer in a clean or dirty area. He/She stated, “The glucometer machine needs to be cleaned after each patient use and not kept on a shelf that has splashes of water.” S2 then proceeded to clean the glucometer with a 1:100 bleach cleaning solution, waited for it to dry, placed it inside the glucometer case and put it back in the drawer labeled “Glucometer.” A review of the MIFU for the Embrace PRO blood glucose monitor stated, “... Safekeeping ... Make sure to keep the Embrace PRO Meter in a sanitary environment ... Keep the test port away from dirt, blood, or water ...” N.J.A.C. 8:43A-24.8(d)”
-
Pe - Equipment Maintenance - Manufacturer’S Dfu
The inspectors’ words, 302 words
“PE-EQUIPMENT MAINTENANCE-MANUFACTURER’S DFU CFR(s): 494.60(b) The dialysis facility must implement and maintain a program to ensure that all equipment (including emergency equipment, dialysis machines and equipment, and the water treatment system) are maintained and operated in accordance with the manufacturer’s recommendations. This Standard is not met as evidenced by: 50912 Based on observation of one of two Embrace PRO (Professional Choice) Blood Glucose Test Strips, review of facility policy and procedures, manufacturer’s instructions for use (MIFU), and staff interview, it was determined the facility failed to ensure that the Embrace PRO test strips (strips used in blood glucose meters for testing blood sugar) are maintained in accordance with the MIFU. Findings include: On 09/18/24 at 10:20 AM, during tour of the Dialysis Treatment Floor, an opened container of “Embrace PRO” test strips was located inside the bottom drawer of a cabinet left of “Dirty” Sink 13. The container did not have a label indicating the date it was opened. During an interview at 11:15 AM, Staff (S) 2, Registered Nurse stated that he/she did not know who opened the container of test strips or when it was opened. S2 stated the glucometer strips expire four months after opening. S2 then discarded the opened bottle of glucometer strips since he/she was not able to determine when it was opened. S2 then opened a new container of glucometer strips and labeled it with his/her initials, the date and the time. Facility policy titled, “Blood Glucose Testing,” revised December 2019, stated, “ ...Policy... 4. The monitor and strips are stored and used in accordance to monitor manufacturer instructions and approved policies and procedures. ...” A review of the MIFU for the Embrace PRO test strips, stated, “... Storage and Handling ... Use all the strips within 4 months after the first opening ...” N.J.A.C. 8:43A-24.11(c)”
-
Vascular Access - Monitor/Referrals
The inspectors’ words, 366 words
“POC-VASCULAR ACCESS-MONITOR/REFERRALS CFR(s): 494.90(a)(5) The interdisciplinary team must provide vascular access monitoring and appropriate, timely referrals to achieve and sustain vascular access. The hemodialysis patient must be evaluated for the appropriate vascular access type, taking into consideration co-morbid conditions, other risk factors, and whether the patient is a potential candidate for arteriovenous fistula placement. This Standard is not met as evidenced by: 48966 Based on observation, staff interview, and a review of facility documents, it was determined that the facility failed to ensure that the staff perform skin disinfection of the access site prior to initiating the dialysis treatment in accordance with facility policy for one of one observation of the initiation of hemodialysis through an arteriovenous graft/fistula (AVG/AVF). Findings include: On 09/18/24 at 10:02 AM, Staff (S) 6, a Licensed Practical Nurse (LPN), initiated dialysis through a patient’s AVF in Station 17. After cleansing each site of the AVF with alcohol pads in a circular motion, S6 applied betadine for 20 seconds in a circular motion to each site and allowed the betadine to dry for one minute and 30 seconds prior to cannulation (the action of inserting a metal tube into the body to draw fluid or introduce medication). The application of betadine was 10 seconds less than required by facility policy. The betadine dry time was 30 seconds less than required by facility policy. During an interview at 10:18 AM on 09/18/24, S6 stated, “I think I should clean the sites with betadine for 60 seconds and allow to dry for two minutes.” A review of S6’s personnel record indicated the Nurse Skills Checklist for cleansing cannulation sites were demonstrated on 04/16/24 and satisfactory performance by a new teammate signed off on 05/01/24. Facility policy titled, “AV Fistula Or Graft Cannulation With Nipro Or Medisystems Safety Fistula Needles (SFN) And Administration of Heparin Loading Dose,” revised October 2022, stated, “... Procedure 11. While maintaining aseptic technique, cleanse the site by applying skin antiseptic using a circular motion, moving from the center out and allow to dry. (For contact and dry time refer to the table above) ... Povidone Iodine ... Effective Contact Time 30 seconds, Air Drying Time 2 minutes ...” N.J.A.C. 8:43A-24.8(b)”
The one inspection in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Sep 20, 2024 | Standard inspection | 3 deficiencies cited |
Is it certified?
- Medicare-certified dialysis facility, certified or last recertified on Dec 10, 2014.
- Run for profit.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Chain: DaVita.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for dialysis facilities.
- None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
What does it offer?
- Offers in-center hemodialysis, peritoneal dialysis and home hemodialysis training.
- Doesn’t offer a shift starting at 5 p.m. or later.
- 18 dialysis stations.
- CMS doesn’t publish staffing levels for dialysis facilities.
- In CMS’s survey, patients rate its staff 4 of 5.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
Who owns it?
- Part of the DaVita chain, as CMS lists it.
- CMS publishes no owners file for dialysis facilities, so no other owner is named.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
How do patients fare?
- CMS rates it 5 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
- Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; blood transfusions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, better than expected; patients dialysing through a fistula, as expected; patients put on a kidney transplant waitlist in their first year of dialysis, better than expected; patients on a kidney transplant waitlist, as expected.
- Patients rate it 4 of 5 in CMS’s survey of in-center hemodialysis patients (31 interviews, Oct 18, 2024 to Jul 11, 2025): 78% rated the facility 9 or 10 out of 10.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Star ratingCMS’s star rating for dialysis facilities, 1 to 5 | 5 of 5 |
| Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5 | 4 of 5 |
How does it compare nearby?
- Of the 22 dialysis facilities CMS lists in Essex County, 22 have a star rating from CMS: 6 rated 5 of 5, 3 rated 4 of 5, 7 rated 3 of 5, 4 rated 2 of 5, 2 rated 1 of 5.
- CMS rates this one 5 of 5.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
- CMS doesn’t publish staffing levels for dialysis facilities.
- CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.
Sources
-
Centers for Medicare & Medicaid Services, Dialysis Facility - Listing by Facility (23ew-n7w9).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (ICH CAHPS) - Facility (59mq-zhts).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies (ESRD_2567s_2018_to_2026YTD.xlsx).
Released Oct 28, 2026 and checked Oct 30, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 30, 2026.
From the facility
The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.