Fmc Brunswick County
A dialysis facility in Supply, North Carolina 28462
98 Stone Chimney Road SE, Supply, North Carolina 28462. (910) 754-3280.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 28, 2026.
- 4of 5 CMS’s star rating
- Not rated patient survey rating
- 3 deficiencies cited in the last three years
- 10 dialysis stations
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Jul 15, 2025: a standard inspection.
3 deficiencies cited in the last three years.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
When those deficiencies happened
3 deficiencies in 1 month of the last 36. Last cited Jul 2025. Most serious: Standard-level. The last 3 years, to Oct 30, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Jul 15, 2025: standard inspection3 deficiencies
-
Ic - Wear Gowns, Shields/Masks; Staff Not Eat/Drink In Tx Area
The inspectors’ words, 346 words
“IC-GOWNS, SHIELDS/MASKS-NO STAFF EAT/DRINK CFR(s): 494.30(a)(1)(i) Staff members should wear gowns, face shields, eye wear, or masks to protect themselves and prevent soiling of clothing when performing procedures during which spurting or spattering of blood might occur (e.g., during initiation and termination of dialysis, cleaning of dialyzers, and centrifugation of blood). Staff members should not eat, drink, or smoke in the dialysis treatment area or in the laboratory. This Standard is not met as evidenced by: 35306 Based on policy review, observation, and staff interview, the facility staff failed to wear PPE in order to cover the arms and prevent potential blood exposure while performing exit site care and initiating dialysis via a central venous catheter in 1 of 2 observations (Station #6, RN #1, Patient #1). Findings include: Review on 07/15/2025 of the facility policy “Personal Protective Equipment” (Published Date: 11/06/2023), revealed “Personal protective equipment including ... fluid-resistant gowns ... must be worn to protect employees from blood or other potentially infectious materials (OPIM). PPE is used to protect employees who are occupationally exposed to blood or OPIM when performing procedures during which spurting or spattering of blood might occur (e.g., during initiation and termination of dialysis ...).” Observation on 07/14/2025 at 1209 at dialysis station #6 of the patient treatment area revealed RN #1 performing exit site care initiating hemodialysis treatment to Patient #1 via the patient’s CVC access and initiating treatment at 1217. The observation revealed that while RN #1 performed exit site care and subsequently initiated treatment, the staff member’s cover gown sleeves were pulled above her gloved hands, exposing the wrists. The observation revealed the staff member failed to ensure the forearms were covered during time of exposure risk. Interview on 07/14/2025 at 1230 with RN #1 revealed that the staff are educated by the facility to use PPE appropriately and that gown sleeves should be pulled down, covering all exposed skin during CVC care. Interview on 07/15/2025 at 1325 with the facility’s CM revealed that wrists should be covered and not exposed when staff are at risk for potential exposures.”
-
Ic - Clean, Disinfect Surfaces & Equipment/Written Protocols
The inspectors’ words, 369 words
“IC-DISINFECT SURFACES/EQUIP/WRITTEN PROTOCOL CFR(s): 494.30(a)(4)(ii) [The facility must demonstrate that it follows standard infection control precautions by implementing- (4) And maintaining procedures, in accordance with applicable State and local laws and accepted public health procedures, for the-] (ii) Cleaning and disinfection of contaminated surfaces, medical devices, and equipment. This Standard is not met as evidenced by: 35306 Based on policy review, observation, and staff interview, the facility staff failed to prevent potential cross-contamination between patients by failing to ensure the hemodialysis station was completely vacated prior to cleaning the HDM at station #7 in 1 of 2 observations (Station #7, PCT #1, Patient #8 ). Findings include: Review on 07/15/2025 of the facility policy “Cleaning and Disinfecting the Dialysis Station” (Published Date: 09/05/2023), revealed “... Vacating the Machine To prevent cross-contamination between patients, it is important that the previous patient completely vacate the station before staff begin cleaning and disinfection of the station and set up for the next patient. For patients dialyzing in a treatment area where multiple patients dialyze, the patient must completely vacate the dialysis station before the dialysis machine can be externally disinfected, allowed to dry and set up for the next treatment.” Observation on 07/14/2025 at 1059 at dialysis station #7 of the patient treatment area revealed that while Patient #8 applied pressure to the access sites post-treatment, PCT #1 turned the HDM away from the patient, cleaned and disinfected the machine and then re-strung the machine in preparation for the next scheduled patient. The observation revealed the PCT failed to wait until the hemodialysis station was completely vacated prior to cleaning and disinfecting the HDM. Interview on 07/14/2025 at 1430 with RN #1 revealed that the nurse spoke with PCT #1 following the observation and that the PCT stated that she had been told that if the HDM was turned away from the patient, it could be cleaned and disinfected. RN #1 stated that reeducation was provided and that the PCT assured her that it would never happen again. Interview on 07/14/2025 at 1715 with the facility’s CM revealed that the “patient has to be completly gone from the station area prior to cleaning and re-stringing” the HDM for the next scheduled patient.”
-
Md Resp - Ensure All Adhere To P&P
The inspectors’ words, 365 words
“MD RESP-ENSURE ALL ADHERE TO P&P CFR(s): 494.150(c)(2)(i) The medical director must- (2) Ensure that- (i) All policies and procedures relative to patient admissions, patient care, infection control, and safety are adhered to by all individuals who treat patients in the facility, including attending physicians and nonphysician providers; This Standard is not met as evidenced by: 35306 Based on policy review, observation and staff interview, the facility’s nursing staff failed to ensure that expiration dates for stored medications were monitored and not available for use in 1 of 1 stored medication observations. Findings include: Review on 07/15/2025 of the facility policy “Medication Preparation and Administration” (Published Date: 07/07/2025), revealed “... Monitoring Expired Medications Expiration dates for all stored medications are to be monitored on a monthly basis. Expired medications are to be discarded via (Organization name) off-site return program or in accordance with local and/or state law.” Observation on 07/14/2025 at 1101 of stored medications revealed a container of RPC E-Z Chek Blood Leak K100-0114 strips (Lot #101064) with an expiration date of 07/31/2024; a box with 3, 1.3 oz tubes of Glutose 15 Oral Glucose Gel (Lot # 2308625) with an expiration date of 06/30/2025; a box with 1, 1.3 oz tube of Glutose 15 Oral Glucose Gel (Lot # 2308625) with an expiration date of 06/30/2025; a bottle of Benadryl (Diphenhydramine HCI) 25mg capsules (Lot #112436) 1 capsule with an expiration date of 03/2024, a bottle of Benadryl (Diphenhydramine HCI) 25mg capsules (Lot # 129430) 65 capsules with an expiration date of 03/2025, and a box of Medi-First Triple Antibiotic Ointment with 41, 1/57 oz packets (Lot # A175) with an expiration date of 02/2025. Interview on 07/14/2025 at 1715 with the facility’s CM revealed monthly checks of the stored medications should be performed by the nursing staff to ensure expired medications are not available for use. The CM stated that the facility was currently being staffed by the agency’s float pool and that recruitment efforts have been ongoing for permanent staff for some time. Interview revealed the CM planned to develop a process to ensure practices are streamlined and consistent with float staff. “This is definitely an area of opportunity for us.””
The one inspection in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Jul 15, 2025 | Standard inspection | 3 deficiencies cited |
Is it certified?
- Medicare-certified dialysis facility, certified or last recertified on Aug 29, 2012.
- Run for profit.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Chain: Fresenius Medical Care.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for dialysis facilities.
- None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
What does it offer?
- Offers in-center hemodialysis and peritoneal dialysis.
- Doesn’t offer home hemodialysis training and a shift starting at 5 p.m. or later.
- 10 dialysis stations.
- CMS doesn’t publish staffing levels for dialysis facilities.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
Who owns it?
- Part of the Fresenius Medical Care chain, as CMS lists it.
- CMS publishes no owners file for dialysis facilities, so no other owner is named.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
How do patients fare?
- CMS rates it 4 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
- Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, as expected; patients dialysing through a fistula, as expected; patients on a kidney transplant waitlist, as expected.
- CMS gives no CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.: “Too few completed survey responses to report.”
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Star ratingCMS’s star rating for dialysis facilities, 1 to 5 | 4 of 5 |
| Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5 | Not rated |
How does it compare nearby?
- Of the 4 dialysis facilities CMS lists in Brunswick County, 4 have a star rating from CMS: 3 rated 4 of 5, 1 rated 3 of 5.
- CMS rates this one 4 of 5.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
| Place | Star rating |
|---|---|
| Davita Sedc Shallotte Dialysis Center | 4 |
| Davita Southport Dialysis Center | 4 |
| Davita Leland Dialysis Center | 3 |
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
- CMS doesn’t publish staffing levels for dialysis facilities.
- CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.
Sources
-
Centers for Medicare & Medicaid Services, Dialysis Facility - Listing by Facility (23ew-n7w9).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (ICH CAHPS) - Facility (59mq-zhts).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies (ESRD_2567s_2018_to_2026YTD.xlsx).
Released Oct 28, 2026 and checked Oct 30, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 30, 2026.
From the facility
The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.