Statesville Dialysis Center
A dialysis facility in Statesville, North Carolina 28625
627 Signal Hill Drive Ext, Statesville, North Carolina 28625. (704) 872-0148.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 28, 2026.
- 3of 5 CMS’s star rating
- Not rated patient survey rating
- 3 deficiencies cited in the last three years
- 27 dialysis stations
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Aug 28, 2025: a standard inspection.
3 deficiencies cited in the last three years.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
When those deficiencies happened
3 deficiencies in 1 month of the last 36. Last cited Aug 2025. Most serious: Standard-level. The last 3 years, to Oct 30, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Aug 28, 2025: standard inspection3 deficiencies
-
Ic - Wear Gloves/Hand Hygiene
The inspectors’ words, 354 words
“IC-WEAR GLOVES/HAND HYGIENE CFR(s): 494.30(a)(1) Wear disposable gloves when caring for the patient or touching the patient’s equipment at the dialysis station. Staff must remove gloves and wash hands between each patient or station. This Standard is not met as evidenced by: 32003 Based on policy review, observations, staff interview and personnel worksheet review, the facility staff failed to prevent cross-contamination by failing to ensure patients performed hand hygiene for 2 of 2 AVF/G discontinuation (Patients #19and #21). The findings include: Review on August 28, 2025 of the facility’s policy, “Infection Control Practices for Hemodialysis” revised May 2025 revealed, “Purpose ...Responsibility ...Policy ...Procedure ...Infection Control Practices ...Patient Practice [space] ...Patients should be instructed to wash hands or use hand sanitizer, prior to leaving the patient care area. ...” 1. Observation on August 28, 2025 at 10:30 AM revealed, Patient #21 applied manual pressure with a gloved hand to a left AVF/G access site. Hemostasis was achieved and CCHT #2 applied tape to finish securing the access site. Once tape was applied, the patient went to the scale for a post-treatment weight and exited the in-center treatment area without performing hand hygiene. Review on August 28, 2025 of the personnel worksheet revealed CCHT #2 completed infection control training in April 2025. Interview on August 26, 2025 at 10:45 AM during the entrance conference revealed, the Clinical Manager and another staff member performed infection control audits and no major concerns had been identified. 2. Observation on August 28, 2025 at 11:05 AM revealed, Patient #19 applied manual pressure with a gloved hand to a left AVF/G access site. Hemostasis was achieved and CCHT #3 applied tape to finish securing the access site. Once tape was applied, the patient went to the scale for a post-treatment weight and exited the in-center treatment area without performing hand hygiene. Review on August 28, 2025 of the personnel worksheet revealed CCHT #3 completed infection control training in July 2025. Interview on August 26, 2025 at 10:45 AM during the entrance conference revealed, the Clinical Manager and another staff member performed infection control audits and no major concerns had been identified.”
-
Ic - Wear Gowns, Shields/Masks; Staff Not Eat/Drink In Tx Area
The inspectors’ words, 246 words
“IC-GOWNS, SHIELDS/MASKS-NO STAFF EAT/DRINK CFR(s): 494.30(a)(1)(i) Staff members should wear gowns, face shields, eye wear, or masks to protect themselves and prevent soiling of clothing when performing procedures during which spurting or spattering of blood might occur (e.g., during initiation and termination of dialysis, cleaning of dialyzers, and centrifugation of blood). Staff members should not eat, drink, or smoke in the dialysis treatment area or in the laboratory. This Standard is not met as evidenced by: 32003 Based on policy review, observations and staff interview, the facility staff failed to ensure all buttons on the laboratory coat (PPE) were buttoned up for 1 of 2 nurses during patient care activities (Nurse #2). The findings include: Review on August 28, 2025 of the facility’s policy, “Infection Control Practices for Hemodialysis” revised May 2025 revealed, “Purpose ...Responsibility ...Policy ...Points of Emphasis [space] 1. ...4. Gowns must be worn at all times in the treatment area ...The front must be closed - every button must be buttoned ...” Observation on August 26, 2025 from 11:30 AM through 1:05 PM (95-minutes) and from 3:45 PM through 4:35 PM (60-minutes), Nurse #2 wore a white laboratory coat for barrier precautions during patient care, however, none of the buttons were buttoned up and the coat remained open during patient care activities. Interview on August 26, 2025 at 10:45 AM during the entrance conference revealed, the Clinical Manager and another staff member performed infection control audits and no major concerns had been identified.”
-
Ic - Clean, Disinfect Surfaces & Equipment/Written Protocols
The inspectors’ words, 1,063 words
“IC-DISINFECT SURFACES/EQUIP/WRITTEN PROTOCOL CFR(s): 494.30(a)(4)(ii) [The facility must demonstrate that it follows standard infection control precautions by implementing- (4) And maintaining procedures, in accordance with applicable State and local laws and accepted public health procedures, for the-] (ii) Cleaning and disinfection of contaminated surfaces, medical devices, and equipment. This Standard is not met as evidenced by: 32003 Based on policy review, observations, staff interview and personnel worksheet review, the facility staff failed to clean and disinfect the and Hansen connectors for 4 of 4 HDM and station disinfections (Station #14, HDM #16; Station #32, HDM #25; Station #35, HDM #9 and Station #31, HDM #6) and failed to disinfect non-disposable equipment for 3 of 3 observations (wheelchair, Hoyer lift and stand-assist). The findings include: A. Review on August 28, 2025 of the facility’s policy, “Infection Control Practices for Hemodialysis” revised May 2025 revealed, “Purpose ...Responsibility ...Policy ...Procedure ...Infection Control Practices ...Patient Practice ...Medication Practices ...Supply Practices ...Cleaning and Disinfection Practices [space] ...The dialysis station (chairs, machines, priming buckets, special bath jugs, acetic acid jugs, clamps, the chase wall and any Tx signs used) must be disinfected with a 1:100 bleach solution between each patient. ...” Review on August 28, 2025 of the facility’s policy, “Infection Control Practices for Hemodialysis” revised May 2025 revealed, “Purpose ...Responsibility ...Policy ...Procedure ...Infection Control Practices ...Patient Practice ...Medication Practices ...Supply Practices ...Cleaning and Disinfection Practices [space] ...Non-disposable equipment (doppler, pulse oximeter, glucometer, stethoscopes, scissors, line clamps, Phoenix meters, Myron L, etc.) taken to the patient’s station must be disinfected with a 1:100 bleach solution or according to the manufacturer’s instructions prior to being returned to a common clean area or used on another patient. ...” 1. Observation on August 26, 2025 at 3:45 PM revealed, CCHT #1 obtained 1:100 bleach cloths to clean and disinfect Station #14, HDM #16. The observation revealed, all non-disposable equipment was cleaned and disinfected except for the Hansen connectors. Interview on August 26, 2025 at 10:45 AM during the entrance conference revealed, the Clinical Manager and another staff member performed infection control audits and no major concerns had been identified. Review on August 28, 2025 of the personnel worksheet revealed CCHT #1 completed infection control training in April 2025. 2. Observation on August 26, 2025 at 3:57 PM revealed, PCT #1 obtained 1:100 bleach cloths to clean and disinfect Station #32, HDM #25. The observation revealed, all non-disposable equipment was cleaned and disinfected except for the Hansen connectors. Interview on August 26, 2025 at 10:45 AM during the entrance conference revealed, the Clinical Manager and another staff member performed infection control audits and no major concerns had been identified. Review on August 28, 2025 of the personnel worksheet revealed PCT #1 completed infection control training in June 2025. 3. Observation on August 26, 2025 at 4:10 PM revealed, PCT #2 obtained 1:100 bleach cloths to clean and disinfect Station #35, HDM #9. The observation revealed, all non-disposable equipment was cleaned and disinfected except for the Hansen connectors. Interview on August 26, 2025 at 10:45 AM during the entrance conference revealed, the Clinical Manager and another staff member performed infection control audits and no major concerns had been identified. Review on August 28, 2025 of the personnel worksheet revealed PCT #2 completed infection control training in April 2025. 4. Observation on August 27, 2025 at 10:05 AM revealed, Nurse #1 obtained 1:100 bleach cloths to clean and disinfect Station #31, HDM #6. The observation revealed, all non-disposable equipment was cleaned and disinfected except for the Hansen connectors. Interview on August 26, 2025 at 10:45 AM during the entrance conference revealed, the Clinical Manager and another staff member performed infection control audits and no major concerns had been identified. Review on August 28, 2025 of the personnel worksheet revealed PCT #2 completed infection control training in April 2025. 5. Observation on August 28, 2025 at 10:20 AM revealed, DT #1 obtained the facility’s wheelchair, presented to Station #27 as Patient #16 treatment was completed. The technician wheeled the patient from the treatment area to the weight scale. Immediately, thereafter, the technician wheeled the patient back into the treatment area for assistance from the staff. Once the patient was stabilized, the technician wheeled the patient back to the weight scale, obtained a post-treatment weight and wheeled the patient to the lobby area for discharge transportation pick-up. Once transportation arrived, the patient was assisted into the vehicle and exited the facility premises. Observation revealed, the wheelchair was returned to the designated storage area - Bay C without being cleaned or disinfected after patient use. Interview on August 26, 2025 at 10:20 AM during the entrance conference revealed, the Clinical Manager and another staff member performed infection control audits and no major concerns had been identified. Review on August 28, 2025 of the personnel worksheet revealed DT #1 completed infection control training in April 2025. 6. Observation on August 28, 2025 at 10:35 AM revealed, DT #1 obtained the facility’s stand-assist equipment, presented to Station #26 for Patient #17 treatment initiation. DT #1 and CCHT #4 used the stand-assist equipment and assisted the patient from the wheelchair to the station chair. Once the patient was settled into the station chair, DT #1 returned the stand-assist equipment to the designated storage area - Bay C without being cleaned or disinfected after patient use. Interview on August 26, 2025 at 10:45 AM during the entrance conference revealed, the Clinical Manager and another staff member performed infection control audits and no major concerns had been identified. Review on August 28, 2025 of the personnel worksheet revealed DT #1 completed infection control training in April 2025. 7. Observation on August 28, 2025 at 11:00 AM revealed, DT #1 obtained the facility’s Hoyer Lift, presented to Station #31 as Patient #21 treatment was completed. DT #1 and CCHT #1 used the lift and assisted the patient from the station chair to the wheelchair. Once the patient was settled into the wheelchair, DT #1 returned the Hoyer Lift o the designated storage area - Bay C without being cleaned or disinfected after patient use. Interview on August 26, 2025 at 10:45 AM during the entrance conference revealed, the Clinical Manager and another staff member performed infection control audits and no major concerns had been identified. Review on August 28, 2025 of the personnel worksheet revealed DT #1 completed infection control training in April 2025.”
The one inspection in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Aug 28, 2025 | Standard inspection | 3 deficiencies cited |
Is it certified?
- Medicare-certified dialysis facility, certified or last recertified on Dec 15, 1986.
- Run as a non-profit.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Chain: Wake Forest University.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for dialysis facilities.
- None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
What does it offer?
- Offers in-center hemodialysis, peritoneal dialysis and home hemodialysis training.
- Doesn’t offer a shift starting at 5 p.m. or later.
- 27 dialysis stations.
- CMS doesn’t publish staffing levels for dialysis facilities.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
Who owns it?
- Part of the Wake Forest University chain, as CMS lists it.
- CMS publishes no owners file for dialysis facilities, so no other owner is named.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
How do patients fare?
- CMS rates it 3 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
- Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; blood transfusions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, as expected; patients dialysing through a fistula, as expected; patients on a kidney transplant waitlist, as expected.
- CMS gives no CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.: “Too few completed survey responses to report.”
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Star ratingCMS’s star rating for dialysis facilities, 1 to 5 | 3 of 5 |
| Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5 | Not rated |
How does it compare nearby?
- Of the 4 dialysis facilities CMS lists in Iredell County, 4 have a star rating from CMS: 1 rated 4 of 5, 3 rated 3 of 5.
- CMS rates this one 3 of 5.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
| Place | Star rating |
|---|---|
| West Iredell Dialysis Center | 3 |
| Fmc Ins Statesville | 4 |
| Lake Norman Dialysis Center | 3 |
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
- CMS doesn’t publish staffing levels for dialysis facilities.
- CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.
Sources
-
Centers for Medicare & Medicaid Services, Dialysis Facility - Listing by Facility (23ew-n7w9).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (ICH CAHPS) - Facility (59mq-zhts).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies (ESRD_2567s_2018_to_2026YTD.xlsx).
Released Oct 28, 2026 and checked Oct 30, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 30, 2026.
From the facility
The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.