Hearth Record

Davita Pikesville Dialysis

A dialysis facility in Baltimore, Maryland 21215

6609 Reisterstown Road Ste 100, Baltimore, Maryland 21215. (410) 358-1745.

CMS’s own record, on Care Compare

Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.

The short answer

Record last released by CMS on Oct 28, 2026.

The last 24 months 3 deficiencies in 1 month of the last 36. Last cited Jun 2025. Most serious: Condition-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean4
Star ratings
CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
Condition-level deficiency
For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual.

What did inspectors find?

The last inspection on record was on Jun 26, 2025: a complaint inspection.

3 deficiencies cited in the last three years, 1 of them at condition level, the most serious.

1 deficiency at condition level, the more serious of CMS’s two levels

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

When those deficiencies happened

3 deficiencies in 1 month of the last 36. Last cited Jun 2025. Most serious: Condition-level. The last 3 years, to Oct 30, 2026.

3 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 NovDec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOct

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

Jun 26, 2025: complaint inspection3 deficiencies
  • Cfc - Physical Environment

    The inspectors’ words, 124 words

    “CFC-PHYSICAL ENVIRONMENT CFR(s): 494.60 This Condition is not met as evidenced by: 44367 Based on the overall findings of the survey, the facility’s Governing Body, Administration and the Medical Director failed to meet the Condition for Coverage (CfC: 494.60) for Physical Environment as evidenced by: 1) failure to ensure machines safety checks were conducted in compliance with the manufacturer’s recommendation and its own policy; and 2) failure to ensure that patients received their dialysis treatment in a clinical treatment area that is comfortable and at an acceptable temperature. This failure placed all patients at an increased risk for serious harm and/or injury. Findings include: 1. Cross reference to Physical Environment - Equipment Maintenance (V0403) 2. Cross reference to Physical Environment - Comfortable Temperature (V0405)”

    Rule V0400. Condition-level. From a complaint.

  • Pe - Equipment Maintenance - Manufacturer’S Dfu

    The inspectors’ words, 726 words

    “PE-EQUIPMENT MAINTENANCE-MANUFACTURER’S DFU CFR(s): 494.60(b) The dialysis facility must implement and maintain a program to ensure that all equipment (including emergency equipment, dialysis machines and equipment, and the water treatment system) are maintained and operated in accordance with the manufacturer’s recommendations. This Standard is not met as evidenced by: 44367 Based on observations, record reviews, and staff interviews, the facility’s governing body failed to ensure that the clinical staff conducted safety checks of the dialysis machines in accordance with the manufacturer’s instructions and its own policy. This failure placed patients at risk for serious harm or death. Staff: Charge Nurse #1, Staff #1 and Staff #2 Findings include: Review on 06/25/2025 at 10:40 a.m. of the Fresenius 2008T Machine Operator’s Manual, page 74 stated: “Warning! ...If the machine fails this or any of the pressure, alarm, and diasafe tests and the cause cannot be corrected, or if it fails subsequent tests, do not use it for treatment. Remove the machine from service and have it inspected by a qualified technician to correct the problem.” Review on 06/25/2025 at 10:40 a.m. of the facility’s policy entitled, “Priming A Single Use Dialyzer Utilizing Fresenius 2008 Series Dialysis Delivery Systems and Nipro or Combiset Blood Lines for Subsequent Treatment Shifts” determined that page 7 stated, “If the dialysis delivery system fails any of the test and the cause cannot be corrected or if it fails subsequent tests the system should not be used for treatment.” On 06/25/2025 at 10:28 a.m. the surveyor observed that machine #23 located at station #18 failed the safety tests two consecutive times. The surveyor asked the Charge Nurse what the policy regarding machine testing was. The Charge Nurse #1 informed the surveyor that the machine can be tested three times and that machine #23 would be tested for a third time. At 10:30 a.m., the surveyor observed Charge Nurse #1 test machine #23 for a third time. The patient was sitting in the chair of station #18 waiting to receive treatment. At 10:33 a.m., the Facility Administrator (FA) and the Clinical Specialist were informed of the findings and the safety issue. Immediately after the surveyor informed the FA of the findings, the FA instructed the assigned patient care technician to pull machine #23 out of service. At 10:50 a.m. the surveyor asked Staff #1 and Staff #2 what was the policy regarding machine testing and both informed the surveyor that the machine can be tested three times before being removed from service. During an interview with the Clinical Specialist, the surveyor was informed that the staff were “trained to test three times on the new machines.” The surveyor asked if he/she provided education since the facility received the new machine and the Clinical Specialist stated “no.” The facility’s failure to conduct the required safety testing according to manufacturer instructions placed the facility ’ s patients at risk of serious injury, serious harm, and possible death. Due to the seriousness of the concern that the facility staff failed to operate dialysis machines according to manufacturer’s recommendations, an immediate jeopardy (IJ #2) statement was issued to the facility at 12:15 p.m. on 06/25/2025, by the Office of Health Care Quality (OHCQ). On 06/26/2025 at 11:30 a.m., the OHCQ survey team verified that the facility implemented an acceptable IJ removal plan, which included the following actions: 1. The facility held in-services to educate all teammates present in the facility. Education of all remaining teammates to be completed upon their return to work and prior to setting up machines. 2. The facility performed observational audits for every machine being used on each shift to verify 1) set up and safety testing is performed per policy and 2) any machine failing two (2) consecutive safety testing is removed from service. 3. This process to continue until one hundred percent (100%) compliance is achieved with following manufacturer instructions for setting up and safety testing of machines for two (2) consecutive weeks. Once achieved, the audits are to continue every shift once weekly for two (2) weeks then every shift monthly for two (2) months. 4. All instances of non-compliance to be addressed by the auditor with real-time coaching and/or following the facility disciplinary process up to and including termination when warranted. 5. The Facility Administrator on behalf of the Governing Body is responsible for compliance with this IJ removal plan.”

    Rule V0403. Standard-level. From a complaint.

  • Pe - Comfortable Temperature

    The inspectors’ words, 621 words

    “PE-COMFORTABLE TEMPERATURE CFR(s): 494.60(c)(2) The dialysis facility must: (i) Maintain a comfortable temperature within the facility; and (ii) Make reasonable accommodations for the patients who are not comfortable at this temperature. This Standard is not met as evidenced by: 44367 Based on observations, record reviews, and staff interviews, the facility’s governing body failed to ensure that the environment of clinical treatment was comfortable and at a suitable temperature for patients while they were receiving dialysis treatment. This failure placed patients at risk for serious harm due to exposure to high temperatures, which are associated with elevated risk for both mortality and health care utilization among hemodialysis patients. Findings include: On 06/24/2025 at 03:30 p.m., review of the facility’s policy entitled, “Physical Environment” page 1 stated, “The dialysis facility will take reasonable steps to: Maintain a comfortable temperature within the facility.” On 06/24/2025 at 03:15 p.m., during observations of the treatment floor, the surveyor noted that the temperature on the Clinical treatment floor was: “ 86 degrees Fahrenheit according to the thermometer between stations #19 and #20. “ 82.4 degrees Fahrenheit according to the thermometer between stations #2 and #3. “ Noted by the surveyor to be elevated compared to the office area of the clinic. There was no air circulating throughout the clinical treatment area, causing the remaining staff to visibly have sweat running down their faces and some with visible wet areas on thier clothing. The temperatures above were observed without the machines running. It was known that the temperatures would potentially increase with the machines running. At 03:16 p.m., three staff members were interviewed and all three informed the surveyor that the “air” had not worked for over a week. During an interview with the Facility Administrator on 06/24/2025, the “air” stopped working yesterday on 06/23/2025, but arrangements for patients have not been made. The FA corroborated that the air condition unit was not working in the clinical treatment area and that the facility did not make arrangements for patients to receive dialysis at the facility’s back up dialysis facility. The facility’s failure to ensure that the physical environment ’ s temperature (86 and 84.2-degrees Fahrenheit) of the clinical treatment area was at a comfortable range placed the facility ’ s patients at risk of serious injury and/or serious harm. An immediate jeopardy (IJ #1) statement was issued to the facility at 04:55 p.m. on 06/24/2025, by the Office of Health Care Quality (OHCQ). On 06/26/2025 at 11:30 a.m., the OHCQ survey team verified that the facility implemented an acceptable IJ removal plan, which included the following actions: 1. Four temporary spot coolers were set up and used to lower the temperature on the treatment floor until the unit became fully functional. Spot coolers to remain at the clinic as backups to ensure continuous patient care. 2. Facility Services reported to the Facility Administrator that the air conditioning system was repaired and operational. 3. A contingency plan for patients to dialyze in alternate facilities was developed in the event neither of the above plans results in acceptable ambient temperatures within the facility. 4. In-services held to educate all teammates present in the facility. Education of all remaining teammates to be completed upon their return to work. 5. Audits to be performed twice daily to record both temperature readings of the two wall thermostats located on the treatment floor and documented using the facility room temperature log. Audits will be performed first thing in the a.m. and midday. The facility to continue to perform twice daily audits for the next four (4) weeks, then weekly for the next two (2) months. 6. The Facility Administrator on behalf of the Governing Body is responsible for compliance with this IJ removal plan.”

    Rule V0405. Standard-level. From a complaint.

The one inspection in the last three years
Inspections on record
DateVisitWhat the record says
Jun 26, 2025Complaint inspection3 deficiencies cited

Is it certified?

  • Medicare-certified dialysis facility, certified or last recertified on May 12, 2003.
  • Run for profit.
  • Cited at in the last three years: it didn’t meet a whole condition of Medicare’s rules for dialysis facilities.
  • Chain: DaVita.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

Has it been penalized?

  • CMS doesn’t publish fines or other penalties for dialysis facilities.
  • 3 deficiencies cited in the last three years came from inspections that included a complaint investigation.
Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.

What does it offer?

  • Offers in-center hemodialysis.
  • Doesn’t offer peritoneal dialysis, home hemodialysis training and a shift starting at 5 p.m. or later.
  • 6 dialysis stations.
  • CMS doesn’t publish staffing levels for dialysis facilities.
  • In CMS’s survey, patients rate its staff 2 of 5.
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Who owns it?

  • Part of the DaVita chain, as CMS lists it.
  • CMS publishes no owners file for dialysis facilities, so no other owner is named.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

How do patients fare?

  • CMS rates it 3 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
  • Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; blood transfusions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, as expected; patients dialysing through a fistula, as expected; patients put on a kidney transplant waitlist in their first year of dialysis, as expected; patients on a kidney transplant waitlist, as expected.
  • Patients rate it 2 of 5 in CMS’s survey of in-center hemodialysis patients (33 interviews, Oct 18, 2024 to Jul 11, 2025): 55% rated the facility 9 or 10 out of 10.
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Ratings and measures, as published
MeasureRating
Star ratingCMS’s star rating for dialysis facilities, 1 to 53 of 5
Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 52 of 5

How does it compare nearby?

  • Of the 29 dialysis facilities CMS lists in Baltimore City, 25 have a star rating from CMS: 4 rated 4 of 5, 9 rated 3 of 5, 8 rated 2 of 5, 4 rated 1 of 5.
  • CMS rates this one 3 of 5.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
  • CMS doesn’t publish staffing levels for dialysis facilities.
  • CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Oct 30, 2026.

From the facility

The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 8, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.