Davita Quad Counties Dialysis
A dialysis facility in Auburn, Indiana 46706
528 N Grandstaff Drive, Auburn, Indiana 46706. (260) 927-0100.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 14, 2026.
- 4of 5 CMS’s star rating
- Not rated patient survey rating
- 6 deficiencies cited in the last three years
- 9 dialysis stations
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Dec 31, 2025: a standard inspection.
6 deficiencies cited in the last three years.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.
When those deficiencies happened
6 deficiencies in 1 month of the last 36. Last cited Dec 2025. Most serious: Standard-level. The last 3 years, to Oct 19, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.
Dec 31, 2025: standard inspection6 deficiencies
-
Ic - Wear Gloves/Hand Hygiene
The inspectors’ words, 594 words
“IC-WEAR GLOVES/HAND HYGIENE CFR(s): 494.30(a)(1) Wear disposable gloves when caring for the patient or touching the patient’s equipment at the dialysis station. Staff must remove gloves and wash hands between each patient or station. This Standard is not met as evidenced by: 44714 Based on observation, record review, and interview, the facility failed to ensure employees followed hand hygiene practices for 1 of 2 CVC exit site care observations (RN 1), 1 of 2 CVC discontinuation observations (PCT 1), 1 of 2 observations of the initiation of dialysis with a fistula (RN 1), 1 of 2 observations of dialysis station disinfection (PCT 3), and employee use of hand sanitizer for 1 of 2 observation days (PCT 1). Findings include: 1. The facility policy, “Infection Control for Dialysis Facilities,” last revised April 2023, indicated hand hygiene was required prior to gloving and immediately after removal of gloves, after contamination with blood or other infectious material, after contact with the patient or dialysis machine, and before touching clean items or supplies. 2. During an observation on 12/29/2025 at 10:08 AM, PCT 1 discontinued Patient # 5’s dialysis with a CVC. During the process, PCT 1 had completed hand hygiene and donned clean gloves, then pulled the sharps container over to the patient station with their gloved hands. PCT 1 then connected syringes with saline to flush the CVC lines. PCT 1 failed to complete hand hygiene and glove change after touching the sharps container. During an interview on 12/30/2025 beginning at 2:50 PM, PCT 1 indicated hand hygiene (use of hand sanitizer and donning new gloves) was required after touching something “dirty” and doing a clean task. PCT 1 indicated the sharps container was considered dirty and required hand hygiene prior to touching the patient access sites. 3. During an observation on 12/29/2025 at 10:26 AM, PCT 1 used hand sanitizer after removing their gloves. PCT 1 then waved their hands back and forth. PCT 1 failed to allow hand sanitizer to air dry. During an interview beginning at 2:50 PM, PCT 1 acknowledged they waved their hands to dry the hand sanitizer more quickly. 4. During an observation on 12/30/2025 at 5:39 AM, RN 1 prepared to initiate Patient #12’s dialysis via a fistula. RN 1, wearing gloves, washed the skin from elbow to wrist to ensure the access site was clean. RN 1 then removed gloves, used hand sanitizer, and charted on the CWOW (computer work on wheels). RN 1 donned gloves without using hand sanitizer. RN 1 used an antiseptic on Patient #12’s access site. RN 1 failed to use hand sanitizer prior to donning clean gloves. 5. During an observation on 12/30/2025 at 6:36 AM, RN 1 completed CVC exit site care for Patient #13. RN 1 removed the old dressing covering the CVC exit site. RN 1 completed hand hygiene, documented on the CWOW, donned gloves, and cleansed the CVC exit site. RN 1 failed to use hand sanitizer after using the CWOW and prior to donning gloves. During an interview on 12/30/2025 beginning at 2:30 PM, the Alternate Administrator indicated hand sanitizer was required prior to donning gloves. 6. During an observation on 12/30/2025 at 9:45 AM, PCT 3 disinfected the dialysis station. After emptying the prime waste bucket, PCT 3 continued to disinfect the dialysis machine. PCT 3 failed to complete hand hygiene and don new gloves after emptying the prime waste bucket. During an interview on 12/30/2025 beginning at 03:10 PM, the Alternate Administrator indicated their policy did not address hand hygiene after emptying the prime waste bucket.”
-
Ic - Sinks Available
The inspectors’ words, 195 words
“IC-SINKS AVAILABLE CFR(s): 494.30(a)(1)(i) A sufficient number of sinks with warm water and soap should be available to facilitate hand washing. This Standard is not met as evidenced by: 44714 Based on observation and interview, the facility failed to ensure there was warm water at the handwashing sink on the treatment floor for 1 of 1 facility surveyed. Findings include: 1. On 12/29/2025 beginning at 9:00 AM, this surveyor used the handwashing sink on the treatment floor by stepping on the floor pedal to operate the water. Surveyor noted the water to be cold even though the hot water pedal was used. When checked, the hot water temperature was 72° after running for 3 minutes. During an interview on 12/29/2025 beginning 11:12 AM, the biomedical technician indicated they do not check the water temperature. During an interview on 12/29/2025 beginning 2:10 PM, Corporate Person 1, the administrator from another facility, indicated the water temperature was cool. During an observation on 12/30/2025 at 10:15 AM, this surveyor noted Corporate Person 3, a maintenance employee, on the treatment floor checking the water temperature on the handwashing sink. Corporate Person 3 indicated the water was still too cold.”
-
Ic - Wear Gowns, Shields/Masks; Staff Not Eat/Drink In Tx Area
The inspectors’ words, 201 words
“IC-GOWNS, SHIELDS/MASKS-NO STAFF EAT/DRINK CFR(s): 494.30(a)(1)(i) Staff members should wear gowns, face shields, eye wear, or masks to protect themselves and prevent soiling of clothing when performing procedures during which spurting or spattering of blood might occur (e.g., during initiation and termination of dialysis, cleaning of dialyzers, and centrifugation of blood). Staff members should not eat, drink, or smoke in the dialysis treatment area or in the laboratory. This Standard is not met as evidenced by: 44714 Based on observation, record review, and interview, the facility failed to ensure direct care staff did not chew gum while on the treatment floor for 1 of 2 PCTs observed on 12/30/2025 (PCT 1). Findings include: 1. The facility policy, “Infection Control for Dialysis Facilities,” last revised April 2023, stated, “Food and drinks in the treatment area will be limited to patients.” 2. During an observation on 12/30/2025 at 02:50 PM, surveyor observed PCT 1 chewing gum while on the treatment floor. During an interview beginning at 0:250 PM, PCT 1 acknowledged chewing gum and indicated they did not know if it was allowed. During an interview beginning at 03:10 PM, the Alternate Administrator indicated they did not allow food on the treatment floor.”
-
Softeners - Automatically Regenerated/Timers/Salt/Salt Level
The inspectors’ words, 351 words
“SOFTENERS-AUTO REGENERATE/TIMERS/SALT LVL CFR(s): 494.40(a) 5.2.4 Softeners: auto regen/timers/salt/salt level Prior to exhaustion, softeners should be restored; that is, new exchangeable sodium ions are placed on the resin by a process known as “regeneration,” which involves exposure of the resin bed to a saturated sodium chloride solution. 5.2.4 Softeners Refer to RD62:2001, 4.3.10 Automatically regenerated water softeners: Automatically regenerated water softeners shall be fitted with a mechanism to prevent water containing the high concentrations of sodium chloride used during regeneration from entering the product water line during regeneration. The face of the timers used to control the regeneration cycle should be visible to the user. 6.2.4 Softeners Timers should be checked at the beginning of each day and should be interlocked with the RO system so that the RO is stopped when a softener regeneration cycle is initiated. The softener brine tank should be monitored daily to ensure that a saturated salt solution exists in the brine tank. Salt pellets should fill at least half the tank. Salt designated as rock salt should not be used for softener regeneration since it is not refined and typically contains sediments and other impurities that may damage O-rings and pistons and clog orifices in the softener control head. This Standard is not met as evidenced by: 44714 Based on observation, record review, and interview, the facility failed to maintain a brine tank per industry standards for 1 of 1 facility surveyed. Findings include: 1. During an observation of the facility water room on 12/29/2025 beginning at 11:12 AM, the brine tank was not half filled with salt pellets and water was visible above the salt. The brine tank had a label on it with instructions to verify the salt level was above the water line. During an interview on 12/29/2025 beginning at 11:12 AM, the Biomedical Technician indicated the brine tank was not half full of salt pellets and the water line was visible. During an interview on 12/29/2025 beginning at 02:10 PM, Corporate Person 1 indicated the brine tank should be half full of salt and the water level should not be visible.”
-
Pe - Equipment Maintenance - Manufacturer’S Dfu
The inspectors’ words, 127 words
“PE-EQUIPMENT MAINTENANCE-MANUFACTURER’S DFU CFR(s): 494.60(b) The dialysis facility must implement and maintain a program to ensure that all equipment (including emergency equipment, dialysis machines and equipment, and the water treatment system) are maintained and operated in accordance with the manufacturer’s recommendations. This Standard is not met as evidenced by: 44714 Based on observation, record review, and interview, the facility failed to secure oxygen cylinders for 1 of 1 facility surveyed. Findings include: 1. During an observation on 12/29/2025 beginning at 09:05 AM, this surveyor noted 9 oxygen cylinders in an alcove. Three cylinders were not secured. During an interview on 12/29/2025 beginning at 09:20 AM, RN 1 indicated there were three unsecured oxygen tanks in the alcove and they were unsure of the need to secure them.”
-
Va Monitor To Prevent Failure/Stenosis
The inspectors’ words, 224 words
“POC-VA MONITOR/PREVENT FAILURE/STENOSIS CFR(s): 494.90(a)(5) The patient’s vascular access must be monitored to prevent access failure, including monitoring of arteriovenous grafts and fistulae for symptoms of stenosis. This Standard is not met as evidenced by: 44714 Based on observation, record review, and interview, the facility failed to ensure direct care staff assessed the fistula access sites prior to cannulation for 2 of 2 fistula cannulation observations. Findings include: 1. Facility policy, “AV Fistula or Graft Cannulation ...,” last revised April 2025, stated “Perform inspection, auscultation [listen to internal sounds of the body] and palpation [ using touch to assess blood flow] on entire length of access.” 2. During an observation on 12/30/2025 at 05:39 AM, RN 1 prepared to initiate Patient #12’s dialysis via a fistula. RN 1 failed to evaluate access by palpating the cannulation sites (location of needle insertion). 3. During an observation on 12/30/2025 at 05:52 AM, PCT1 prepared to initiate Patient #6’s dialysis via a fistula. PCT 1 failed to evaluate access by palpating the cannulation sites. During an interview on 12/30/2025 beginning at 02:50 PM, PCT 1 indicated the cannulation sites should be assessed by listening and feeling the blood flow, prior to cannulation. During an interview on 12/30/2025 beginning at 03:10 PM, Corporate Person 1 indicated the fistula access sites should be assessed by palpation prior to canulation.”
The one inspection in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Dec 31, 2025 | Standard inspection | 6 deficiencies cited |
Is it certified?
- Medicare-certified dialysis facility, certified or last recertified on Aug 26, 1996.
- Run for profit.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Chain: DaVita.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for dialysis facilities.
- None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.
What does it offer?
- Offers in-center hemodialysis.
- Doesn’t offer peritoneal dialysis, home hemodialysis training and a shift starting at 5 p.m. or later.
- 9 dialysis stations.
- CMS doesn’t publish staffing levels for dialysis facilities.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
Who owns it?
- Part of the DaVita chain, as CMS lists it.
- CMS publishes no owners file for dialysis facilities, so no other owner is named.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
How do patients fare?
- CMS rates it 4 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
- Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, better than expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, better than expected; patients dialysing through a fistula, as expected; patients on a kidney transplant waitlist, as expected.
- CMS gives no CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.: “Too few completed survey responses to report.”
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Star ratingCMS’s star rating for dialysis facilities, 1 to 5 | 4 of 5 |
| Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5 | Not rated |
How does it compare nearby?
- Of the 2 dialysis facilities CMS lists in Dekalb County, 2 have a star rating from CMS: 1 rated 4 of 5, 1 rated 3 of 5.
- CMS rates this one 4 of 5.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
| Place | Star rating |
|---|---|
| Fmc - Dekalb County Dialysis | 3 |
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
- CMS doesn’t publish staffing levels for dialysis facilities.
- CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.
Sources
-
Centers for Medicare & Medicaid Services, Dialysis Facility - Listing by Facility (23ew-n7w9).
Released Jul 15, 2026 and checked Oct 19, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (ICH CAHPS) - Facility (59mq-zhts).
Released Jul 15, 2026 and checked Oct 19, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies (ESRD_2567s_2018_to_2026YTD.xlsx).
Released Oct 14, 2026 and checked Oct 19, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 19, 2026.
From the facility
The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.