Usrc NW Indianapolis
A dialysis facility in Indianapolis, Indiana 46268
6488 Corporate Drive, Indianapolis, Indiana 46268. (317) 328-9667.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 28, 2026. We couldn’t read Centers for Medicare & Medicaid Services’ list since Nov 2, 2026: qcor.cms.gov now refuses our reader. This record is as of then.
- 3of 5 CMS’s star rating
- Not rated patient survey rating
- 3 deficiencies cited in the last three years
- 16 dialysis stations
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on May 12, 2025: a complaint inspection.
3 deficiencies cited in the last three years.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
When those deficiencies happened
3 deficiencies in 1 month of the last 36. Last cited May 2025. Most serious: Standard-level. The last 3 years, to Oct 30, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
May 12, 2025: complaint inspection3 deficiencies
-
Ic - Wear Gloves/Hand Hygiene
The inspectors’ words, 449 words
“IC-WEAR GLOVES/HAND HYGIENE CFR(s): 494.30(a)(1) Wear disposable gloves when caring for the patient or touching the patient’s equipment at the dialysis station. Staff must remove gloves and wash hands between each patient or station. This Standard is not met as evidenced by: 44232 Based on observation, record review, and interview, the facility failed to ensure the staff instructed the patients on the proper use of hand hygiene after holding their access with a gloved hand during 3 of 3 observations. (Patients: #4, 12, and 15) (Employee: PCT 3(3 times)) Findings include: 1. A review of a US Renal Care policy revision date 08/2020, titled, “Hand Hygiene” indicated but was not limited to, “ HAND HYGIENE consists of either: 1. Handwashing with soap and water. 2. Use of an alcohol-based formulation ... HAND HYGIENE will be performed: After gloves are removed ...”. 2. During an observation on 05/07/2025 at 11:26 AM, observed Patient #4 remove their glove from their right hand after holding their pressure dressing on their left access site. PCT 3 obtained the patient’s weight, and temperature at the scale and Patient #4 left the treatment area after gathering their blanket and phone. PCT 3 failed to instruct the patient to perform hand hygiene or offer hand sanitizer prior to leaving the treatment area. 3. On 05/07/2025 a sign was posted on the wall above the sink by the scale that stated, “Handwashing Prevents Infection.” 4. During an observation on 05/07/2025 at 2:10 PM, observed Patient #15 remove their glove from their left hand after holding their pressure dressing on their right access site. PCT 3 assisted Patient #15 with their walker to the scale. The PCT obtained the patient’s weight, and temperature at the scale and Patient #15 left the treatment area. PCT 3 failed to instruct the patient to perform hand hygiene or offer hand sanitizer prior to leaving the treatment area. 5. During an observation on 05/07/2025 at 2:36 PM, observed Patient #12 remove their glove from their left hand after holding their pressure dressing on their right access site. The PCT obtained the patient’s weight, and temperature at the scale and Patient #12 left the treatment area. PCT 3 failed to instruct the patient to perform hand hygiene or offer hand sanitizer prior to leaving the treatment area. 6. A review of the personnel record for PCT 3, contained a document titled “Clinical Orientation Checklist-Initial” revision date 05/2023. The checklist evidenced PCT 3 completed by return demonstration and verbalization on 08/17/2024 infection control precautions. During an interview on 05/07/2025 at 2:56 PM, when queried about post dialysis treatment instructions to patients, PCT 3 indicated after temperature and weight they were to encourage hand washing.”
-
Pe - Building - Constructed/Maintained To Ensure Safety
The inspectors’ words, 244 words
“PE-BUILDING-CONSTRUCT/MAINTAIN FOR SAFETY CFR(s): 494.60(a) The building in which dialysis services are furnished must be constructed and maintained to ensure the safety of the patients, the staff and the public. This Standard is not met as evidenced by: 44232 Based on observation, record review, and interview, the facility failed to ensure the safety and functionality of the facility was in for patients and staff as observed over 1 of 1 observations. Findings Include: 1. A review of a US Renal Care policy revision date 04/2023, titled “Facility Space/Design and Safety Requirements” indicated but was not limited to, “ ... Facilities will provide a physical environment that protects the health and safety of patients, staff, and public ... “ 2. During a treatment floor observation on 05/07/2025 at 9:07 AM, observed brown-rust colored substance surrounding the drainage pipe and cabinet shelf of the cabinet under the dirty sink in the lab area. During an interview on 05/07/2025 at 9:0+9 AM, when quired regarding the brown substance surrounding the drainage pipe and cabinet shelf, the Biomed Technician confirmed the strain valve corroded and needed replaced. 3. During an observation on 05/12/2025 at 8:35 AM, noted the in the hallways across from the FA’s office the wall bubbled and cracked from the baseboard to approximated 2 feet of the wall and 3 feet in width. During an interview on 05/12/2025, the FA confirmed the damage to the wall was from a water leak in the treatment area.”
-
Manage Volume Status
The inspectors’ words, 438 words
“POC-MANAGE VOLUME STATUS CFR(s): 494.90(a)(1) The plan of care must address, but not be limited to, the following: (1) Dose of dialysis. The interdisciplinary team must provide the necessary care and services to manage the patient’s volume status; This Standard is not met as evidenced by: 44232 Based on record review and interview, the agency failed to ensure direct patient care staff monitored the patients during their dialysis treatment within the timelines to ensure patient safety in 2 of 2 active clinical records reviewed. (Patients: #1 and 4) Findings include: 1. A review of a US Renal Care policy revision date 07/2024, titled “Intradialytic Monitoring of Patient” indicated but was not limited to, “ ... for the delivery of a safe, effective and comfortable treatment ... Vital signs: obtained and documented at least every 30 minutes ... “ 2. A review of the clinical record for Patient #1contained treatment sheets dated 03/03/2025 through 05/05/2025 evidenced the following: Treatment sheet dated 03/05/2025, the CM completed an assessment with a blood pressure and pulse check at 11:43 AM. PCT 2 completed the next blood pressure and pulse check at 12:48 PM. Treatment sheet dated 05/05/2025, the PCT 3 completed a blood pressure and pulse check at 2:04 PM. PCT 3 completed the next blood pressure and pulse check at 3:04 PM. During an interview on 05/07/2025 at 2:56 PM, when queried regarding the process of pre, during, and post patient care, PCT 3 indicated blood pressure and pulse safety checks are to be done every 30 minutes during dialysis treatment. 3. A review of the clinical record for Patient #4 contained treatment sheets dated 04/14/2025 through 05/07/2025 evidenced the following: Treatment sheet dated 04/23/2025, PCT 3 completed a blood pressure and pulse check at 9:33 AM. PCT 3 completed the next blood pressure and pulse check at 9:33 AM. Treatment sheet dated 04/25/2025, PCT 2 completed a blood pressure and pulse check at 9:35 AM. PCT 2 completed the next blood pressure and pulse check at 10:20 AM. Treatment sheet dated 05/02/2025, PCT 3 completed a blood pressure and pulse check at 9:27 AM. PCT 2 completed the next blood pressure and pulse check at 10:59 AM. Treatment sheet dated 05/05/2025, PCT 3 completed a blood pressure and pulse check at 9:57 AM. PCT 3 completed the next blood pressure and pulse check at 11:06 AM. During an interview on 05/07/2025 at 9:40 AM, when queried regarding the patient process pre, during and post dialysis treatment, PCT 2 indicated safety checks including a blood pressure and pulse were to be completed on the patients during dialysis treatment every 30 minutes.”
The one inspection in the last three years
| Date | Visit | What the record says |
|---|---|---|
| May 12, 2025 | Complaint inspection | 3 deficiencies cited |
Is it certified?
- Medicare-certified dialysis facility, certified or last recertified on Dec 31, 2005.
- Run for profit.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Chain: US Renal Care, Inc.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for dialysis facilities.
- 3 deficiencies cited in the last three years came from inspections that included a complaint investigation.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
What does it offer?
- Offers in-center hemodialysis.
- Doesn’t offer peritoneal dialysis, home hemodialysis training and a shift starting at 5 p.m. or later.
- 16 dialysis stations.
- CMS doesn’t publish staffing levels for dialysis facilities.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
Who owns it?
- Part of the US Renal Care, Inc. chain, as CMS lists it.
- CMS publishes no owners file for dialysis facilities, so no other owner is named.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
How do patients fare?
- CMS rates it 3 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
- Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, as expected; patients dialysing through a fistula, as expected; patients on a kidney transplant waitlist, as expected.
- CMS gives no CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.: “Too few completed survey responses to report.”
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Star ratingCMS’s star rating for dialysis facilities, 1 to 5 | 3 of 5 |
| Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5 | Not rated |
How does it compare nearby?
- Of the 25 dialysis facilities CMS lists in Marion County, 22 have a star rating from CMS: 8 rated 3 of 5, 7 rated 2 of 5, 7 rated 1 of 5.
- CMS rates this one 3 of 5.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
- CMS doesn’t publish staffing levels for dialysis facilities.
- CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.
Sources
-
Centers for Medicare & Medicaid Services, Dialysis Facility - Listing by Facility (23ew-n7w9).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (ICH CAHPS) - Facility (59mq-zhts).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies (ESRD_2567s_2018_to_2026YTD.xlsx).
Released Oct 28, 2026 and checked Oct 30, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 30, 2026.
From the facility
The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.