Circle Medical Management
A dialysis facility in Chicago, Illinois 60607
1606 W Adams St, Chicago, Illinois 60607. (312) 829-1424.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 28, 2026.
- 1of 5 CMS’s star rating
- Not rated patient survey rating
- 5 deficiencies cited in the last three years (needs attention)
- 28 dialysis stations
Each figure’s source sits beside it, in its section below.
What these words mean4
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
- Condition-level deficiency
- For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual.
What did inspectors find?
The last inspection on record was on Jan 22, 2025: a complaint inspection.
5 deficiencies cited in the last three years, 1 of them at condition level, the most serious.
1 deficiency at condition level, the more serious of CMS’s two levels
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
When those deficiencies happened
5 deficiencies in 1 month of the last 36. Last cited Jan 2025. Most serious: Condition-level. The last 3 years, to Oct 30, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Jan 22, 2025: complaint inspection5 deficiencies
-
Cfc - Physical Environment
The inspectors’ words, 103 words
“CFC-PHYSICAL ENVIRONMENT CFR(s): 494.60 This Condition is not met as evidenced by: 36774 Based on observation, document review, and interview, it was determined that the facility failed to comply with the Condition for Coverage, 42 CFR 494.60, Physical Environment. Findings include: 1. The facility failed to ensure that dialysis equipment, supplies, or training materials, were available. See deficiency at V-401 A. 2. The facility failed to ensure that the temperature within the room is comfortable. See deficiency at V-401 B. 3. The facility failed to ensure that a mechanism to call for help during emergency was available, as required. See deficiency at 402.”
-
Compliance With Fed/State/Local Laws
The inspectors’ words, 356 words
“COMPLIANCE WITH FED/STATE/LOCAL LAWS CFR(s): 494.20 The facility and its staff must operate and furnish services in compliance with applicable Federal, State, and local laws and regulations pertaining to licensure and any other relevant health and safety requirements. This Standard is not met as evidenced by: 36774 Based on observation, document review, and interview, the Facility failed to ensure that the CMS (Centers for Medicare and Medicaid Services) approval process for relocation of incenter hemodialysis, home hemodialysis, and home peritoneal dialysis program was followed, as required. This has the potential to affect 117 patients on the census. Findings include: 1. On 1/16/2025 at approximately 12:30 PM, an onsite visit to the dialysis facility was conducted. Between 1:00 PM through 2:00 PM, an observational tour of the dialysis treatment area was conducted. The dialysis treatment area had 24 stations (one isolation room for Hepatitis B+ patients) with 13 patients currently receiving dialysis treatments. 2. On 1/21/2025, the notices posted and provided to the facility’s patients prior to relocation were reviewed: - The document titled, “Important Notice” (undated) included, “(Name of Dialysis Facility) ... is MOVING!! Our new facility, located at 140 S. Ashland, the corner of Ashland and Adams is finally complete! It will be business as usual the week of 10/12/21 through 10/26, but starting Monday, October 28th, will begin dialysis treatments in the new facility. OUR PATIENT ENTRANCE is located at 1606 W. Adams ... Any questions can be directed via email to (E #7/Director of Support Services) ...” - The letters sent to patients (undated) included, “Hello Everyone! We want to thank you all for your patience during this time. We have great news: we are finally moving to our new building! Treatment at the new clinic will start on Monday, October 28th, 2024 ...” 3. On 1/21/2025 at approximately E #7 (Director of Support Services) stated that the facility sent the requested documents to the State before moving to its current address. E #7 stated that the relocation should be approved before the move. E #7 could not provide any documentation that the relocation of the facility to its current location was approved.”
-
Dist Sys - Culture/Lal/Sample Sites/Frequency(New)/Log
The inspectors’ words, 456 words
“DIST SYS-CULTURE/LAL/SITES/FREQ(NEW)/LOG CFR(s): 494.40(a) 6.3.3 Water distribution systems: culture/LAL sample sites/frequency (new)/log Water distribution piping systems should be monitored for bacteria and endotoxin levels. Bacteria and endotoxins shall not exceed the levels specified in [AAMI] 4.1.2. [(i.e., bacteria <200 CFU/mL and endotoxin <2 EU/mL] Bacteria and endotoxin testing should be conducted at least monthly. For a newly-installed water distribution piping system, or when a change has been made to an existing system, it is recommended that weekly testing be conducted for 1 month to verify that bacteria or endotoxin levels are consistently within the allowed limits. Monitoring should be accomplished by taking samples from the first and last outlets of the water distribution loop and the outlets supplying reuse equipment and bicarbonate concentrate mixing tanks. If the results of this testing are unsatisfactory, additional testing (e.g., ultrafilter inlet and outlet, RO product water, and storage tank outlet) should be undertaken as a troubleshooting strategy to identify the source of contamination, after which appropriate corrective actions can be taken. Bacteria and endotoxin levels shall be measured as specified in ANSI/AAMI RD62:2001 (see 2.3). All bacteria and endotoxin results should be recorded on a log sheet to identify trends that may indicate the need for corrective action. This Standard is not met as evidenced by: 36774 Based on document review and interview, it was determined that for 1 of 4 monthly dialysis water testing (December 2024) reviewed for presence of endotoxin and colony count, the facility failed to ensure that the required sample was tested, as required. Findings include: 1. On 1/16/2025, the monthly water testing for presence of endotoxin and colony count from October 2024 through January 2025, were reviewed. The testing conducted lacked monthly checking for presence of endotoxin and colony count for the RO (Reverse Osmosis/water purification) loop return in December 2024. 2. On 1/21/2025, the facility’s policy titled, “Drawing Endotoxin Samples” (3/2013) was reviewed and included, “ ... Policy: The water used to prepare concentrates and dialysate will be tested monthly for endotoxin levels. Samples will be obtained from various points within the water treatment system ...” 3. On 1/21/2025, the facility’s guidance for obtaining water samples for endotoxin and colony counts (undated) was reviewed and included, “ ... In Center dialysis new requirements: All RO need ‘dialysis water samples’ for ... endotoxins test ... monthly, 3 samples ... RO loop return ...” All RO need ... samples for colony counts ... monthly, 3 samples ... RO loop return ...” 4. On 1/16/2025 at approximately 3:00 PM and on 1/21/2025 at approximately 10:00 AM, an interview was conducted with E #3 (Biomedical Technician). E #3 stated that the result for the RO loop return is missing for December 2024, and should have been completed.”
-
Pe - Safe, Functional, Comfortable Environment
The inspectors’ words, 529 words
“PE-SAFE/FUNCTIONAL/COMFORTABLE ENVIRONMENT CFR(s): 494.60 The dialysis facility must be designed, constructed, equipped, and maintained to provide dialysis patients, staff, and the public a safe, functional, and comfortable treatment environment. This Standard is not met as evidenced by: 36774 A. Based on observation, document review, and interview, it was determined that for 1 of 1 combined home peritoneal dialysis (HPD) and home hemodialysis (HHD) training room observed, the facility failed to ensure that dialysis equipment, supplies, or training materials, were available. This can potentially affect all 26 HPD patients on the census. Findings include: 1. On 1/21/2025 at approximately 9:00 AM, the facility’s home dialysis training room was observed. The training room had no supplies available e.g., dialysis machine/cycler, disconnection cap, tubing, or training materials for home peritoneal dialysis patients. 2. On 1/21/2025, the facility’s policy titled, “Services Available” was reviewed and included, “ ... Policy: 1. The Facility will provide ESRD (end stage renal disease) services to patients requiring renal replacement therapy ... 3. Services provided ... include: c. home dialysis from designated facilities ... g. designated Home Training Centers providing evaluation and patient teaching for home... peritoneal dialysis ...” 3. On 1/21/2025, the clinical record for Pt. #7 was reviewed. On 12/19/2024, Pt. #7 was admitted to the facility with a diagnosis of chronic kidney disease. The clinical record indicated that Pt. #1 required and received training on 1/13/2025, 1/14/2025, 1/15/2025, and 1/16/2025. 4. On 1/21/2025 at approximately 9:00 AM and 10:30 AM, E #1 (Director of Operations) and E #2 (Nurse Manager, Home Program) confirmed that the facility have only one training room for both HHD and HPD patients. E #2 stated that the dialysis training room at this location is not ready and do not have available equipment and supplies to train HPD patients. Because of this, E #2 stated that’s why Pt. #7 was trained at the doctor’s office. E #2 stated that services provided to home patients include provision of supplies, equipment, or materials needed during the training. B. Based on observation, document review, and interview, it was determined that for 1 of 1 combined HPD and HHD training room observed, the facility failed to ensure that the temperature within the room is comfortable. This can potentially affect any the 30 home dialysis patients on the census, staff and visitors. Findings include: 1. On 1/21/2025 at approximately 9:00 AM, the facility’s home dialysis training room was observed. The training room was cold, had no thermostat, or mechanism to check the temperature inside the room. 2. On 1/21/2025, the facility’s policy titled, “Physical Environment Dialysis Treatment Area” (11/2012) included, “ ... Purpose: To provide dialysis patients, staff, and the public a comfortable treatment environment ... Policy: The space for treating each patient must be sufficient to provide patient care and services ... 2. The facility must: a. Maintain a comfortable temperature within the Facility ...” 3. On 1/21/2025 at approximately 10:30 AM, an interview with E #2 (Nurse Manager, Home Program) was conducted. E #2 stated that there is no mechanism to tell if the temperature in the training room is comfortable for patients (or staff). E #2 stated, “Yes, it is cold in here.””
-
Pe - Building - Constructed/Maintained To Ensure Safety
The inspectors’ words, 285 words
“PE-BUILDING-CONSTRUCT/MAINTAIN FOR SAFETY CFR(s): 494.60(a) The building in which dialysis services are furnished must be constructed and maintained to ensure the safety of the patients, the staff and the public. This Standard is not met as evidenced by: 36774 Based on observation, document review, and interview, it was determined that for 1 of 1 combined home peritoneal dialysis (HPD) and home hemodialysis (HHD) training room observed, the facility failed to ensure that a mechanism to call for help during emergency was available, as required. This can potentially affect all 30 home dialysis patients on the census. Findings include: 1. On 1/21/2025 at approximately 9:00 AM, the facility’s home dialysis training room was observed. The training room had no call light or other mechanism for patients to call during emergencies. 2. On 1/21/2025, the facility’s policy titled, “Physical Environment Dialysis Treatment Area” (11/2012) was reviewed and included, “ ... Purpose: To provide dialysis patients, staff, and the public a comfortable treatment environment ... Policy: The space for treating each patient must be sufficient to provide patient care and services ... to accommodate medical emergency equipment ...” 3. On 1/21/2025 between approximately 10:30 AM and 11:00 AM, interviews were conducted with E #1 (Director of Operations) and E #2 (Nurse Manager, Home Dialysis Program). E #1 stated that the facility does not have a call light for patients to use. E #2 stated that the way to call for emergency assistance would be to yell, ask help from the incenter staff, and to call 911. On 1/22/2025 at approximately 10:15 AM, another interview was conducted with E #2. E #2 is not aware of any established process regarding use of hand-held call device for home dialysis patients.”
The one inspection in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Jan 22, 2025 | Complaint inspection | 5 deficiencies cited |
Is it certified?
- Medicare-certified dialysis facility, certified or last recertified on Jan 12, 1988.
- Run for profit.
- Cited at For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. in the last three years: it didn’t meet a whole condition of Medicare’s rules for dialysis facilities.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for dialysis facilities.
- 5 deficiencies cited in the last three years came from inspections that included a complaint investigation.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
What does it offer?
- Offers in-center hemodialysis, peritoneal dialysis and home hemodialysis training.
- Doesn’t offer a shift starting at 5 p.m. or later.
- 28 dialysis stations.
- CMS doesn’t publish staffing levels for dialysis facilities.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
Who owns it?
- CMS lists it as independent, not owned or managed by a chain.
- CMS publishes no owners file for dialysis facilities, so no other owner is named.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
How do patients fare?
- CMS rates it 1 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
- Compared by CMS with what it expects for the facility’s patients: patient survival, better than expected; hospital admissions, as expected; readmissions to hospital, as expected; blood transfusions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; patients dialysing through a fistula, worse than expected; patients put on a kidney transplant waitlist in their first year of dialysis, as expected; patients on a kidney transplant waitlist, as expected.
- CMS gives no CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.: “Survey data not available for this reporting period.”
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Star ratingCMS’s star rating for dialysis facilities, 1 to 5 | 1 of 5 |
| Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5 | Not rated |
How does it compare nearby?
- Of the 150 dialysis facilities CMS lists in Cook County, 136 have a star rating from CMS: 10 rated 5 of 5, 28 rated 4 of 5, 41 rated 3 of 5, 37 rated 2 of 5, 20 rated 1 of 5.
- CMS rates this one 1 of 5.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
- CMS doesn’t publish staffing levels for dialysis facilities.
- CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.
Sources
-
Centers for Medicare & Medicaid Services, Dialysis Facility - Listing by Facility (23ew-n7w9).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (ICH CAHPS) - Facility (59mq-zhts).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies (ESRD_2567s_2018_to_2026YTD.xlsx).
Released Oct 28, 2026 and checked Oct 30, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 30, 2026.
From the facility
The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.