Hearth Record

Usrc South Georgia

A dialysis facility in Valdosta, Georgia 31602

3564 North Crossing Circle, Valdosta, Georgia 31602. (229) 249-3222.

CMS’s own record, on Care Compare

Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.

The short answer

Record last released by CMS on Oct 14, 2026.

The last 24 months 4 deficiencies in 1 month of the last 36. Last cited Apr 2024. Most serious: Standard-level. Every month

Each figure’s source sits beside it, in its section below.

What these words mean3
Star ratings
CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
Inspection (survey)
A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
Deficiency, citation, violation
What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.

What did inspectors find?

The last inspection on record was on Apr 18, 2024: a complaint inspection.

4 deficiencies cited in the last three years.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.

When those deficiencies happened

4 deficiencies in 1 month of the last 36. Last cited Apr 2024. Most serious: Standard-level. The last 3 years, to Oct 19, 2026.

4 deficiencies by month over the last 3 years. Each cell is one month.
JanFebMarAprMayJunJulAugSepOctNovDec
2023 NovDec
2024 JanFebMarAprMayJunJulAugSepOctNovDec
2025 JanFebMarAprMayJunJulAugSepOctNovDec
2026 JanFebMarAprMayJunJulAugSepOct

Hover or focus a month to read it.

No visit on record Visited, nothing cited A stronger orange is more serious, on its source’s own levels, read onto four bands: from the least serious it publishes to the most
Source:

Hearth Record drew this from the dates and levels in the source’s own records.

Each deficiency, as cited

Rule titles as CMS’s inspectors cite them, set in sentence case.

Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.

Apr 18, 2024: complaint inspection4 deficiencies
  • Pe - Safe, Functional, Comfortable Environment

    The inspectors’ words, 344 words

    “PE-SAFE/FUNCTIONAL/COMFORTABLE ENVIRONMENT CFR(s): 494.60 The dialysis facility must be designed, constructed, equipped, and maintained to provide dialysis patients, staff, and the public a safe, functional, and comfortable treatment environment. This Standard is not met as evidenced by: 49321 Based on observation and staff interviews, it was determined that the facility failed to ensure that there was a safe environment for all patients and staff, as evidenced by failure of the facility to ensure that one of one door in the Supply Room, was maintained to prevent entry of insects and vermin. This deficient practice had the potential to negatively impact the health and safety of 78 in-center hemodialysis patients who were under the care of this facility. Findings were: During a tour of the facility with RN AA on 4/8/24 at 2:28 p.m., the following was observed: In the Supply Room: - The metal door trim at the base of the door was rusted and separated from the door (approximately 37 inches long by 1/2 inch wide) that produced a gap between the door and the trim, and could allow insects and vermin to enter the building. In the Patient Treatment Room: - There was a large dead cockroach on the floor at Station (S) 1. - There was a small dead cockroach on the floor at S19 on the left side of the treatment chair. A review of facility records revealed a contract with an exterminator company for inspection and treatment of the facility once a month. The last visit date was made on March 2024. However, during staff and patient interviews, the following was revealed: - On 4/18/24 at 1:26 p.m., PCT AA stated she sees roaches all the time; they enter the facility under the back door. - During a telephonic interview with Patient #1 on 4/18/24 at 3:00 p.m., he stated that he saw a roach two weeks ago crawling near the Isolation Room. During an interview on 4/18/24 at 4:00 p.m., the Acting Facility Administrator and the Regional Operations Director both stated no one ever said anything about roaches.”

    Rule V0401. Standard-level. From a complaint.

  • Pe - Building - Constructed/Maintained To Ensure Safety

    The inspectors’ words, 492 words

    “PE-BUILDING-CONSTRUCT/MAINTAIN FOR SAFETY CFR(s): 494.60(a) The building in which dialysis services are furnished must be constructed and maintained to ensure the safety of the patients, the staff and the public. This Standard is not met as evidenced by: 32734 Based on observation, staff interviews, and a review of records, it was determined that the facility failed to maintain a safe, functional, and comfortable evironment. This deficient practice had the potential to negatively impact the health and safety of 78 in-center hemodialysis patients who were under the care of this facility. During observation on 4/18/24 at 9:15 a.m., the following was revealed: In the Lobby: - The floor was dull and had accumulated dirt througout the floor. - The wall to the left (when you entered the Lobby) at eye level , had a three inches wide by four inches long hole in it. In the Patient Treatment Room: - The floor had accumulated dirt and blackish discolored tiles in an area (approximately three by three feet in diameter) near S 5, S6, S8, and S9. - There was grout and yellowish/white substance seeping through tiles in front of the chase wall at S14 and S15. - The chase wall panel near S1 had a hole (approximately two to three inches in circumference). - There were multiple white substance/stains splashed across the chase wall panel near S1 and S2. - The two windows in the isolation room had numerous white substance/residue splashed across the windows and on the outer ledges . - The countertop to dirty sink located at the back of the treatment floor, was eroded and separated from the edges of the cabinet. There were multiple white substance/residue splashed on the cabinet.. In the Supply Room: - The floor had accumulated dirt, and the floor finish was peeling away, eroded and discolored throughout the area. - Dirt and debris were observed on the baseboard and corners of the wall. - The silver colored cabinet (electrical panel) had numerous white subtance splashed on the cabinet and ledges. In the Water Treatment Room: - The floor was dull and had accumulated dirt throughout the floor. - The room adjacent to the Water Treatment Room which was used by the Biomed Technician, had shoe tracks across the floor which were embedded in black colored dirt. During an interview with Registered Nurse (RN) AA on 4/18/24 at 9:51 a.m., she stated “The floors were stripped about three months ago but not waxed. The facility changed cleaning companies and they don’t clean the building. This building has been dirty for about a year”. A review of the Facility Environmental/Safety Audits dated 1/30/24 and 3/26/24, showed the floors were “clean and dry”. A review of the QAPI meeting minutes from November 2023 through March 2024 showed no documentation of any facility environmental issues/concerns. During an interview on 4/18/24 at 4:30 p.m., the Regional Director acknowledged that there has been a problem with the cleanliness of the clinic.”

    Rule V0402. Standard-level. From a complaint.

  • Staff Licensed As Req/Qualified/Demonstrate Competencies

    The inspectors’ words, 295 words

    “PQ-STAFF LIC AS REQ/QUAL/DEMO COMPETENCY CFR(s): 494.140 All dialysis facility staff must meet the applicable scope of practice board and licensure requirements in effect in the State in which they are employed. The dialysis facility’s staff (employee or contractor) must meet the personnel qualifications and demonstrated competencies necessary to serve collectively the comprehensive needs of the patients. The dialysis facility’s staff must have the ability to demonstrate and sustain the skills needed to perform the specific duties of their positions. This Standard is not met as evidenced by: 49321 Based on a review of personnel file and staff interview, it was determined that the facility failed to ensure that seven of seventeen full time, part time, and float employees [Registered Nurses (RN) AA, RN BB, Float RN CC, Patient Care Technicians (PCT) AA, PCT BB, PCT DD, and Float PCT EE], had current skill checklists to evaluate their ability to perform the duties that were assigned to them. This deficient practice had the potential to negatively impact the health and safety of 78 in-center hemodialysis patients who were under the care of this facility. Findings were: A review of the signed personnel file worksheet, that was filled out and submitted by the Acting Facility Administrator and a review of the following employee records, revealed the following: - RN AA, Float RN CC, PCT BB, PCT DD, Float PCT EE, did not have documented skills competency checklist. - RN BB and PCT AA had no documentation of current skills competency checklists. The last competency evaluation for RN BB and PCT AA were dated 1/12/23 and 2/27/23 respectively. During an interview with the Regional Director on 4/16/24 at 2:00 p.m., when asked about updated skills checklist, she stated “we’re in the process of getting skills checklist done”.”

    Rule V0681. Standard-level. From a complaint.

  • Nurse Manager - 12 Mo Rn + 6 Mo Dialysis

    The inspectors’ words, 342 words

    “PQ-NURSE MANAGER-12 MO RN+6 MO DIALYSIS CFR(s): 494.140(b)(1) (1) Nurse manager. The facility must have a nurse manager responsible for nursing services in the facility who must- (i) Be a full time employee of the facility; (ii) Be a registered nurse; and (iii) Have at least 12 months of experience in clinical nursing, and an additional 6 months of experience in providing nursing care to patients on maintenance dialysis. This Standard is not met as evidenced by: 49321 Based on a review of facility records, observations, and staff interviews, it was determined that the facility failed to show evidence that a full-time Registered Nurse was in charge of nursing services that provided the supervision of licensed nurses and unlicensed personnel. This deficient practice had the potential to negatively impact the health and safety of 78 in-center hemodialysis patients who were under the care of this facility. Findings were: A review of RN BB’s personnel file revealed a signed job description for staff RN. There was a lack of training records, skills competency checklist, or other employee documents observed in her personnel file. A review of the facility’s Governing Body Meeting minutes dated 1/20/24, stated that RN BB was governed in as the Nurse in Charge of Nursing Services. During an interview with RN BB on 4/18/24 at 12:26 p.m., she stated, “I was unaware that I was the nurse in charge of nursing services. I never signed a job description for the position of a nurse in charge of nursing services and I work four days a week”. RN BB denied having time out from direct patient care to perform any administrative nursing duties and did not participate in any hiring or firing of staff or in any interdisciplinary team meetings (IDT) or governing body meetings. On 4/18/24 at 2:00 p.m., the Regional Director was informed that RN BB was unaware that she has been governed in as the nurse in charge of nursing services and was unaware that she was appointed to that position. The ROD shrugged her shoulders in response.”

    Rule V0684. Standard-level. From a complaint.

The one inspection in the last three years
Inspections on record
DateVisitWhat the record says
Apr 18, 2024Complaint inspection4 deficiencies cited

Is it certified?

  • Medicare-certified dialysis facility, certified or last recertified on Nov 21, 2000.
  • Run for profit.
  • No deficiency on record in the last three years.
  • Chain: US Renal Care, Inc.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.

Has it been penalized?

  • CMS doesn’t publish fines or other penalties for dialysis facilities.
  • 4 deficiencies cited in the last three years came from inspections that included a complaint investigation.
Source:

CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 14, 2026. Updated monthly.

What does it offer?

  • Offers in-center hemodialysis and peritoneal dialysis.
  • Doesn’t offer home hemodialysis training and a shift starting at 5 p.m. or later.
  • 21 dialysis stations.
  • CMS doesn’t publish staffing levels for dialysis facilities.
  • In CMS’s survey, patients rate its staff 1 of 5.
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Who owns it?

  • Part of the US Renal Care, Inc. chain, as CMS lists it.
  • CMS publishes no owners file for dialysis facilities, so no other owner is named.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

How do patients fare?

  • CMS rates it 1 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
  • Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; blood transfusions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, better than expected; patients dialysing through a fistula, as expected; patients put on a kidney transplant waitlist in their first year of dialysis, as expected; patients on a kidney transplant waitlist, as expected.
  • Patients rate it 1 of 5 in CMS’s survey of in-center hemodialysis patients (38 interviews, Oct 18, 2024 to Jul 11, 2025): 41% rated the facility 9 or 10 out of 10.
Source:

CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.

Ratings and measures, as published
MeasureRating
Star ratingCMS’s star rating for dialysis facilities, 1 to 51 of 5
Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 51 of 5

How does it compare nearby?

  • Of the 6 dialysis facilities CMS lists in Lowndes County, 5 have a star rating from CMS: 2 rated 2 of 5, 3 rated 1 of 5.
  • CMS rates this one 1 of 5.
Source:

CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.

What the record doesn’t say

  • CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
  • Only complaints that led to a citation appear; complaints that didn’t aren’t published.
  • QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
  • CMS doesn’t publish staffing levels for dialysis facilities.
  • CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.

Sources

If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.

Source:

This copy of the record was made on Oct 19, 2026.

From the facility

The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.

Replies

None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.

Paid listing

None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.

How to read a record

Four things every record does, shown on an example record made up for this guide.

An example record, made up for this guide

An example nursing home

Made up for this guide: no real place is shown

Not fully inspected in over two years (CMS flag)

11 health citations at the latest inspection cycle

The state average is 14.3.

Source:

CMS, State and US Averages and Health Deficiencies. Released Oct 28, 2026. Updated monthly.

From the homeNone yet. Replies and paid listings aren’t open, and when they open they will sit here, below the record.

1 of 4

Every fact names its source.

Who published it, when, and how often it changes sit beside each fact, with a link to the agency’s own file.

Sign in

A free account keeps your watch list, shortlists, comparisons and saved searches on every device, and can email you when something you watch changes. Browsing never needs one.