Davita St Petersburg South Dialysis
A dialysis facility in Saint Petersburg, Florida 33711
2850 34th Street S, Saint Petersburg, Florida 33711. (727) 864-4050.
Watch and the shortlist are kept with a free account, on every device. Your watch list. CMS’s own record is on Care Compare.
The short answer
Record last released by CMS on Oct 28, 2026.
- 2of 5 CMS’s star rating
- Not rated patient survey rating
- 3 deficiencies cited in the last three years
- 20 dialysis stations
Each figure’s source sits beside it, in its section below.
What these words mean3
- Star ratings
- CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.
- Inspection (survey)
- A visit by state inspectors, often unannounced, who check a place against the rules it must meet. For nursing homes and other places Medicare pays, CMS calls these visits surveys: a standard survey of a nursing home comes at least every 15 months, and a complaint survey whenever a complaint calls for one. Source: CMS; 42 CFR 488.308.
- Deficiency, citation, violation
- What inspectors write up when a place didn’t meet a rule: the rule, what they saw, and when. CMS calls it a deficiency; states may say citation or violation. It is the inspectors’ finding, not a court’s, and the place is usually asked for a plan to correct it. Source: CMS, statement of deficiencies (Form CMS-2567); each state’s licensing agency.
What did inspectors find?
The last inspection on record was on Aug 29, 2024: a complaint inspection.
3 deficiencies cited in the last three years.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
When those deficiencies happened
3 deficiencies in 1 month of the last 36. Last cited May 2024. Most serious: Standard-level. The last 3 years, to Oct 30, 2026.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2023 | Nov | Dec | ||||||||||
| 2024 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2025 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
| 2026 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
Hover or focus a month to read it.
Hearth Record drew this from the dates and levels in the source’s own records.
Each deficiency, as cited
Rule titles as CMS’s inspectors cite them, set in sentence case.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
May 3, 2024: standard inspection3 deficiencies
-
Ic - Wear Gloves/Hand Hygiene
The inspectors’ words, 995 words
“IC-WEAR GLOVES/HAND HYGIENE CFR(s): 494.30(a)(1) Wear disposable gloves when caring for the patient or touching the patient’s equipment at the dialysis station. Staff must remove gloves and wash hands between each patient or station. This Standard is not met as evidenced by: 34768 Based on observation, interview and record review the facility failed to follow infection control protocols related to donning and doffing of gloves, hand sanitizing for five of twelve sampled patients (Patient #8, #9, #10, #12, # 11). Findings included: During an observation on 05/02/2024 at 9:35 a.m. Staff J, Patient Care Technician (PCT) was performing discontinuation of arteriovenous fistula (AV) dialysis access for Patient #10. While her gloves were in place, she touched a stool but did not change her gloves or hand sanitize before continuing with care. There was no barrier on the chairside table, and she placed the sterile items on the table. The patient did not have a barrier under his arm. She changed her gloves during the procedure without hand sanitizing. The thermometer was used during the discontinuation and was placed on the computer at the patient’s station. She removed the patient’s oxygen; blood pressure cuff then removed her gloves and left the floor without hand sanitizing. On 05/02/2024 at 9:50 AM, an observation was performed of Staff H, RN, while caring for Patient # 12. Staff H touched the uncleaned hemodialysis machine of another dialysis patient who had left, to assessment of Patient #12 with same gloved hands, and without changing gloves and performing hand hygiene in between. During an observation on 05/02/2024 at 10:05 a.m. Staff B, PCT was performing Central Venous Catheter (CVC) Initiation care for Patient #8. Staff B, PCT donned and doffed her gloves throughout the procedure without consistently hand sanitizing between glove changes. She also removed her gloves, walked to a supply drawer, removed supplies, returned to the patient and reapplied gloves without hand sanitizing. After cleaning the CVC site, the patient’s shirt was allowed to touch the cleaned CVC site during the Exit Site Care. Staff B performed a blood draw, removed her gloves and applied gloves without hand sanitizing. During the initiation care Staff H, Registered Nurse (RN) was observed entering the patient’s area with gloves in place, removed his right glove and typed on the computer and replacing the right glove, without hand sanitizing. He was observed administering medication to Patient #8, removing his gloves, applying gloves and going to another station without hand sanitizing. On 05/02/2024 at 11:00 AM, an observation of Initiation of Dialysis of a Central Venous Catheter was observed on Patient #11. Staff H, Registered Nurse (RN) was noted wearing same gloves going from hemodialysis machine to hemodialysis machine with same gloves silencing alarms for different patients, preparing the dialysis machines, and checking acid and bicarb alarms. Staff H did not remove gloves or perform hand hygiene between each dialysis station. During an observation on 05/02/2024 at 10:18 a.m. Staff I, PCT was performing access to an arteriovenous fistula (AV) for Patient #9. Staff I did not change her gloves and hand sanitize after evaluating the access with a stethoscope. She did not place a barrier on the chairside table, placed the supplies on the table. After performing labs, she left the floor with her gloves on. Staff H, RN applied gloves without hand sanitizing, performed medication administration, (the ports were lying on the table due to a barrier not being in place), removed his gloves and left station without hand sanitizing. During an observation on 05/02/2024 at 2:05 p.m. Staff B, PCT was performing discontinuation of dialysis for Patient #8 with a CVC. Staff H, RN applied gloves, and placed a glove over the stethoscope and assessed the patient. He removed the glove from the stethoscope and his gloves. He did not sanitize the stethoscope nor his hands before leaving the station. During an interview on 05/03/2024 at 11:40 a.m. with the Facility Administrator and the Regional Registered Nurse (RN) they stated the staff was to hand sanitize between glove changes and when entering and exiting the treatment area. The staff was to wash their hands periodically also. A stethoscope was to be cleaned before and after each use. The thermometers should be cleaned after each patient if left at chair side. On review of the observations, the RN stated, “That was not good, they may need someone other than the Clinical Nurse to do the (infection control) audits at this time.” Review of the facility’s policy, “Infection Control for Dialysis Facilities,” revised on April 2023 showed the purpose was to minimize the spread of infections or bloodborne pathogens in the dialysis facility environment. Hand Hygiene: 1. All teammates, Physicians and Non-Physician (NPP) will perform hand hygiene. A. upon entering and exiting the patient treatment areas. B. prior to gloving and immediately after removal of gloves, C. after contamination with blood or other infectious materials. D. after patient and dialysis deliver system contact. E. After interacting with wall boxes. F. between patients even if the contact is casual. G. before touching clean areas such as supplies, supply cart and chairside keyboard/mouse. PPE: 7. Disposable gloves will be worn when caring for the patient or touching the patient’s equipment at the dialysis station, this will include patients and visitors assisting with procedures such as self-cannulation or holding access sites. A. Gloves must be changed when: iv. After touching one patient or their dialysis delivery system and before arriving to care for another patient or touch another patient’s dialysis delivery system. Supplies: 11. Measures will be taken to prevent cross contamination between patients. B. Electronic thermometers and / or blood glucose meters should not be placed on potentially contaminated equipment such as the dialysis delivery system. 14. Non-disposable items are to be disinfected after each patient use, prior to removal from treatment area / station and if contaminated between uses. A. Stethoscopes will be disinfected with alcohol prep pad and / or 1:100 bleach solution. 49691”
-
Ic - Items Taken To Station Disposed/Dedicated Or Disinfected
The inspectors’ words, 602 words
“IC-IF TO STATION=DISP/DEDICATE OR DISINFECT CFR(s): 494.30(a)(1)(i) Items taken into the dialysis station should either be disposed of, dedicated for use only on a single patient, or cleaned and disinfected before being taken to a common clean area or used on another patient. -- Nondisposable items that cannot be cleaned and disinfected (e.g., adhesive tape, cloth covered blood pressure cuffs) should be dedicated for use only on a single patient. -- Unused medications (including multiple dose vials containing diluents) or supplies (syringes, alcohol swabs, etc.) taken to the patient’s station should be used only for that patient and should not be returned to a common clean area or used on other patients. This Standard is not met as evidenced by: 49691 Based on observation, policy review, and interviews the facility failed to disinfect medical equipment used in the care of patients in 2 (Staff H, and Staff E) of 8 staff observations. Review of the facility’s policy, “Infection Control for Dialysis Facilities,” revised on April 2023 showed the purpose was to minimize the spread of infections or bloodborne pathogens in the dialysis facility environment. Hand Hygiene: 1. All teammates, Physicians and Non-Physician (NPP) will perform hand hygiene. A. upon entering and exiting the patient treatment areas. B. prior to gloving and immediately after removal of gloves, C. after contamination with blood or other infectious materials. D. after patient and dialysis deliver system contact. E. After interacting with wall boxes. F. between patients even if the contact is casual. G. before touching clean areas such as supplies, supply cart and chairside keyboard/mouse. PPE: 7. Disposable gloves will be worn when caring for the patient or touching the patient’s equipment at the dialysis station, this will include patients and visitors assisting with procedures such as self-cannulation or holding access sites. A. Gloves must be changed when: iv. After touching one patient or their dialysis delivery system and before arriving to care for another patient or touch another patient’s dialysis delivery system. Supplies: 11. Measures will be taken to prevent cross contamination between patients. B. Electronic thermometers and / or blood glucose meters should not be placed on potentially contaminated equipment such as the dialysis delivery system. 14. Non-disposable items are to be disinfected after each patient use, prior to removal from treatment area / station and if contaminated between uses. A. Stethoscopes will be disinfected with alcohol prep pad and / or 1:100 bleach solution. On 05/02/2024 at 9:50 AM, Staff H, RN (Registered Nurse) was observed while caring for Patient #12. Staff H, RN was observed using the stethoscope around his neck on Patient #12 without disinfecting prior to use on the patient. On 05/02/2024 @ 1010 AM, Staff E, RN , was observed during access of AV (arteriovenous) Fistula (internal dialysis access point for cannulation) for initiation of Dialysis. While assessing bruit and thrill of AV fistula, Staff E, RN utilized stethoscope from around his neck placing the stethoscope on patients Fistula without cleaning the stethoscope prior to use on the patient. During an interview on 05/03/2024 at 11:40 a.m. with the Facility Administrator and the Regional Registered Nurse (RN) they stated the staff was to hand sanitize between glove changes and when entering and exiting the treatment area. The staff was to wash their hands periodically also. A stethoscope was to be cleaned before and after each use. The thermometers should be cleaned after each patient if left at chair side. On review of the observations, the RN stated, “That was not good, they may need someone other than the Clinical Nurse to do the (infection control) audits at this time.””
-
Internal Grievance Process Components & Implemented
The inspectors’ words, 538 words
“GOV-INTERNAL GRIEVANCE SYS ID/IMPLEMENTED CFR(s): 494.180(e) The facility’s internal grievance process must be implemented so that the patient may file an oral or written grievance with the facility without reprisal or denial of services. The grievance process must include- (1) A clearly explained procedure for the submission of grievances. (2) Timeframes for reviewing the grievance. (3) A description of how the patient or the patient’s designated representative will be informed of steps taken to resolve the grievance. This Standard is not met as evidenced by: 20536 Based on observation, interview, and record review, the facility failed to ensure an internal grievance procedure was in place to document patient concerns and ensure steps were taken to resolve the grievances for one (Patient #1) of 12 sampled patients. Findings included: On 5/2/24 at 9:40 a.m., Patient #1 was observed with Patient Care Technician (PCT) Staff J in the treatment area. Patient #1’s hemodialysis machine could be heard beeping. Patient #1 stated she arrived at 8:30 a.m. and had not received her treatment because the machine was broken. Staff H, Registered Nurse (RN), was observed to assist Patient #1 and attempt access to the patient’s left arm arteriovenous (AV) graft. On 5/2/24 at 9:44 a.m., Patient #1 stated, this keeps happening, and I need to leave if I’m not going to get my treatment. A telephone interview with Patient #1 on 5/2/24 at 10:49 a.m. revealed she had been receiving services from the facility for several years but had concerns for the past few months. Patient #1 reported the hemodialysis machines keep breaking causing her to miss treatments; the Director of Nursing (DON) curses in patient areas at the staff and sometimes at other patients; and nobody helped Patient #1 when she verbalized concerns to staff. Patient #1 stated she recently shared concerns with Staff J, PCT and Administrator, but she had not received any follow-up on her concerns. Review of Patient #1’s medical record revealed missed or shortened run times on 5/2/2024, 4/13/2024, and 4/11/2024. Review of the grievance/complaint log for the past 12 months revealed no concerns related to Patient #1. On 5/3/2024 at 10:00 a.m., the Administrator revealed she was familiar with Patient #1 and staff tried to accommodate the patient’s schedule as much as possible. The Administrator reported they allowed Patient #1 to come in later because of her childcare schedule. The Administrator confirmed Patient #1 had several complaints the past few months to include problems with the hemodialysis machines, no longer wanting receive services at this facility, and wanting assistance to transfer to another dialysis center. The Administrator had not received any concerns from other facility staff related to Patient #1 and had no knowledge of concerns with the DON’s behavior towards staff or patients. The Administrator confirmed there have been problems with the patient’s AV graft access, but not the facility’s equipment. The Administrator confirmed the patient has shortened her treatment times and becomes upset with the time it takes staff to safely gain access through her AV site. She confirmed that she should have identified this as a grievance and investigated with follow-up resolution to the patient. A request was made on 5/3/24 for the grievance/complaint policy and procedure, but no policy was provided.”
All 2 inspections in the last three years
| Date | Visit | What the record says |
|---|---|---|
| Aug 29, 2024 | Complaint inspection | No deficiencies cited |
| May 3, 2024 | Standard inspection | 3 deficiencies cited |
Is it certified?
- Medicare-certified dialysis facility, certified or last recertified on Apr 9, 2004.
- Run for profit.
- No For hospices, home health agencies, hospitals and dialysis facilities, CMS writes deficiencies at two levels. Standard is the usual one; condition-level is the more serious, when a problem is serious enough that the provider doesn’t meet a whole condition of taking part in Medicare. Source: CMS, State Operations Manual. deficiency on record in the last three years.
- Chain: DaVita.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
Has it been penalized?
- CMS doesn’t publish fines or other penalties for dialysis facilities.
- None of the deficiencies cited in the last three years came from an inspection that included a complaint investigation.
CMS, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies. Released Oct 28, 2026. Updated monthly.
What does it offer?
- Offers in-center hemodialysis, peritoneal dialysis and home hemodialysis training.
- Doesn’t offer a shift starting at 5 p.m. or later.
- 20 dialysis stations.
- CMS doesn’t publish staffing levels for dialysis facilities.
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
Who owns it?
- Part of the DaVita chain, as CMS lists it.
- CMS publishes no owners file for dialysis facilities, so no other owner is named.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
How do patients fare?
- CMS rates it 2 of 5 stars (Jan 1, 2021 to Dec 31, 2024).
- Compared by CMS with what it expects for the facility’s patients: patient survival, as expected; hospital admissions, as expected; readmissions to hospital, as expected; blood transfusions, as expected; emergency department visits, as expected; emergency department visits within 30 days of a hospital stay, as expected; bloodstream infections, better than expected; patients dialysing through a fistula, as expected; patients put on a kidney transplant waitlist in their first year of dialysis, as expected; patients on a kidney transplant waitlist, as expected.
- CMS gives no CMS rates some kinds of place from 1 to 5 stars, more stars meaning better on CMS’s own measures for that kind: for a nursing home, its health inspections, staffing and quality measures. A rating is CMS’s summary of those measures; it doesn’t promise good care. Source: CMS, Care Compare and the Five-Star Quality Rating System.: “Too few completed survey responses to report.”
CMS, Dialysis Facility - Listing by Facility and Patient survey (ICH CAHPS) - Facility. Released Jul 15, 2026. Updated quarterly.
| Measure | Rating |
|---|---|
| Star ratingCMS’s star rating for dialysis facilities, 1 to 5 | 2 of 5 |
| Patient survey ratingCMS star rating from its survey of the facility’s in-center hemodialysis patients (ICH CAHPS), 1 to 5 | Not rated |
How does it compare nearby?
- Of the 21 dialysis facilities CMS lists in Pinellas County, 18 have a star rating from CMS: 1 rated 5 of 5, 3 rated 4 of 5, 8 rated 3 of 5, 5 rated 2 of 5, 1 rated 1 of 5.
- CMS rates this one 2 of 5.
CMS, Dialysis Facility - Listing by Facility. Released Jul 15, 2026. Updated quarterly.
What the record doesn’t say
- CMS doesn’t publish fines or other penalties for dialysis facilities, so none are shown.
- Only complaints that led to a citation appear; complaints that didn’t aren’t published.
- QCOR says it has no dialysis inspection reports after February 19, 2026, while it moves to a new system: a later inspection is not shown yet.
- CMS doesn’t publish staffing levels for dialysis facilities.
- CMS publishes no owners file for dialysis facilities: the chain it lists is the only owner named.
Sources
-
Centers for Medicare & Medicaid Services, Dialysis Facility - Listing by Facility (23ew-n7w9).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, Patient survey (ICH CAHPS) - Facility (59mq-zhts).
Released Jul 15, 2026 and checked Oct 30, 2026. Updated quarterly. Public domain (U.S. Government work).
-
Centers for Medicare & Medicaid Services, QCOR Dialysis Facility (ESRD) 2567 statements of deficiencies (ESRD_2567s_2018_to_2026YTD.xlsx).
Released Oct 28, 2026 and checked Oct 30, 2026. Updated monthly. Public domain (U.S. Government work).
If you believe something here is wrong, a correction starts with the agency whose record this copies: CMS. CMS’s own record is on Care Compare. If Hearth Record copied something wrongly, it will fix it and log the correction publicly, with its date: how corrections work.
This copy of the record was made on Oct 30, 2026.
From the facility
The public record above comes first. Anything the facility adds will appear here, below it, and say who wrote it.
Replies
None. Replies aren’t open yet. When they open, the facility will be able to answer any finding for free, and the reply will show beside that finding, unedited and dated.
Paid listing
None. Paid listings aren’t open yet. When they open, anything paid for will say “Paid by the facility”, and paying will never change a finding, a rating or the order of results.